| CGS/T04/125 |
Maralal Probase |
2016/2017 |
Samburu Central |
Maralal |
Kshs 64,500,000 |
Kshs 64,500,000 |
Complete
|
| CGS/T04/126 |
Bridges, drifts and Culverts in Maralal town |
2015/2016 |
Samburu Central |
Maralal |
Kshs 10,000,000 |
Kshs 9,659,000 |
Complete
|
| CGS/T04/127 |
Upgrading of 10Km Maralal Town Roads to Probase roads |
2015/2016 |
Samburu Central |
Maralal |
Kshs 150,000,000 |
Kshs 150,000,000 |
Complete
|
| CGS/T04/128 |
Maralal town roads |
2015/2016 |
Samburu Central |
Maralal |
Kshs 10,002,300 |
Kshs 10,002,300 |
Complete
|
| CGS/T04/129 |
LOT2-PROPOSED MARALAL DRAINAGE WORKS |
2019/2020 |
Samburu Central |
Maralal |
Kshs 6,000,000 |
Kshs 7,140,800 |
Complete
|
| CGS/T04/130 |
LOT3-PROPOSED CONSTRUCTION OF CABRO PAVING WORKS AT MARALAL DEB |
2019/2020 |
Samburu Central |
Maralal |
Kshs 3,723,080 |
Kshs 3,723,080 |
Complete
|
| CGS/T04/131 |
Maralal town roads |
2020/2021 |
Samburu Central |
Maralal |
Kshs 6,000,000 |
Kshs 8,004,000 |
Complete
|
| CGS/T04/132 |
Maralal town roads |
2021/2022 |
Samburu Central |
Maralal |
Kshs 10,000,000 |
Kshs 8,004,000 |
Complete
|
| CGS/T04/133 |
Repair of potholes on the Maralal Tarmac road |
2021/2022 |
Samburu Central |
Maralal |
Kshs 5,000,000 |
Kshs 4,979,730 |
Complete
|
| CGS/T04/134 |
Maintenance of Probase road |
2022/2023 |
Samburu Central |
Maralal |
Kshs 10,000,000 |
Kshs 10,000,000 |
Complete
|
| CGS/T04/135 |
Maralal town roads |
2022/2023 |
Samburu Central |
Maralal |
Kshs 4,000,000 |
Kshs 3,975,500 |
Complete
|
| CGS/T04/136 |
Maralal town roads |
2024/2025 |
Samburu Central |
Maralal |
Kshs 60,505,433 |
Kshs 60,505,433 |
Complete
|
| CGS/T04/137 |
Upgrading to bitumen standards of (Maralal Law court-Nuclear Round about Road) |
2024/2025 |
Samburu Central |
Maralal |
Kshs 20,000,000 |
Kshs 20,000,000 |
Complete
|
| CGS/T04/138 |
Construction of a drift in Yamo area |
2020/2021 |
Samburu Central |
Maralal |
Kshs 3,000,000 |
Kshs 2,818,000 |
Complete
|
| CGS/T04/139 |
Construction of Lakira road |
2016/2017 |
Samburu Central |
Maralal |
Kshs 3,000,000 |
Kshs 1,906,000 |
Complete
|
| CGS/T04/140 |
Construction of Unclassfied Road Lakira |
2017/2018 |
Samburu Central |
Maralal |
Kshs 3,000,000 |
Kshs 2,757,000 |
Complete
|
| CGS/T04/141 |
Lpartuk Roads |
2019/2020 |
Samburu Central |
Maralal |
Kshs 4,000,000 |
Kshs 2,885,900 |
Complete
|
| CGS/T04/142 |
LOT1-ROUTINE MAINTENANCE OF MARALAL TOWN ROADS MILIMANI-LPOROS |
2019/2020 |
Samburu Central |
Maralal |
Kshs 7,600,000 |
Kshs 8,369,400 |
Complete
|
| CGS/T04/143 |
Improvement of Milimani Junction-Ilpartuk Road |
2020/2021 |
Samburu Central |
Maralal |
Kshs 5,000,000 |
Kshs 4,692,000 |
Complete
|
| CGS/T04/144 |
Opening of Lpartuk area Roads |
2024/2025 |
Samburu Central |
Maralal |
Kshs 4,000,000 |
Kshs 4,000,000 |
Complete
|
| CGS/T04/145 |
Improvement of Kenyatta House Milimani road |
2021/2022 |
Samburu Central |
Maralal |
Kshs 4,500,000 |
Kshs 4,383,550 |
Complete
|
| CGS/T04/146 |
Improvement of Kenyatta House- Milimani Road |
2023/2024 |
Samburu Central |
Maralal |
Kshs 4,383,550 |
Kshs 4,383,550 |
Complete
|
| CGS/T04/147 |
UNCL Road-Maralal law courts to Milimani |
2022/2023 |
Samburu Central |
Maralal |
Kshs 4,000,000 |
Kshs 3,999,608 |
Complete
|
| CGS/T04/148 |
Improvement of Maralal Law courts- Milimani Road |
2023/2024 |
Samburu Central |
Maralal |
Kshs 4,000,000 |
Kshs 3,639,608 |
Complete
|
| CGS/T04/149 |
Milimani Area Roads |
2024/2025 |
Samburu Central |
Maralal |
Kshs 4,000,000 |
Kshs 3,946,100 |
Complete
|
| CGS/T04/150 |
Improvement of Lkuroto area Roads |
2022/2023 |
Samburu Central |
Maralal |
Kshs 3,000,000 |
Kshs 2,982,020 |
Complete
|
| CGS/T04/151 |
Improvement of Tamiyoi Area Roads |
2020/2021 |
Samburu Central |
Maralal |
Kshs 4,000,000 |
Kshs 3,931,000 |
Complete
|
| CGS/T04/152 |
Improvement of ALLAMANO-LOIKAS AREA ROADS |
2019/2020 |
Samburu Central |
Maralal |
Kshs 4,000,000 |
Kshs 2,871,900 |
Complete
|
| CGS/T04/153 |
Improvement of Loikas Area Roads |
2020/2021 |
Samburu Central |
maralal |
Kshs 5,000,000 |
Kshs 4,901,570 |
Complete
|
| CGS/T04/154 |
LOT3-PROPOSED CONSTRUCTION OF LPOROS FOOT BRIDGE |
2019/2020 |
Samburu Central |
Maralal |
Kshs 2,500,000 |
Kshs 1,730,040 |
Complete
|
| CGS/T04/155 |
Improvement of Lporos Area roads |
2021/2022 |
Samburu Central |
Maralal |
Kshs 3,000,000 |
Kshs 2,991,400 |
Complete
|
| CGS/T04/156 |
Improvement of Mtaro-Allamano road- |
2021/2022 |
Samburu Central |
Maralal |
Kshs 5,000,000 |
Kshs 4,905,500 |
Complete
|
| CGS/T04/157 |
Improvement of road Maralal-Loosuk road |
2015/2016 |
Samburu Central |
Maralal |
Kshs 9,863,811 |
Kshs 9,396,590 |
Complete
|
| CGS/T04/158 |
LOT 6- IMPROVEMENT OF UNCL ROAD NOMOTIO JXN LOIKURKUR - LOIRAGAI - LOLMOLOG JXN |
2019/2020 |
Samburu Central |
Maralal |
Kshs 2,000,000 |
Kshs 4,000,000 |
Complete
|
| CGS/T04/159 |
LOT2-CONSTRUCTION OF LORESHO MBUKIWA BRIDGE |
2019/2020 |
Samburu Central |
Maralal |
Kshs 4,000,000 |
Kshs 5,947,400 |
Complete
|
| CGS/T04/160 |
LOT 4 - PROPOSED CONSTRUCTION OF SUNRISE MBUKIWA FOOT BRIDGE |
2019/2020 |
Samburu Central |
Maralal |
Kshs 5,000,000 |
Kshs 1,827,550 |
Complete
|
| CGS/T04/161 |
Mbukiwa-Sunrise Footbridge |
2024/2025 |
Samburu Central |
Maralal |
Kshs 10,000,000 |
Kshs 10,000,000 |
Complete
|
| CGS/T04/162 |
LOT3-GRADING AND GRAVELLING OF SUNRISE AREA ROADS |
2019/2020 |
Samburu Central |
Maralal |
Kshs 5,600,000 |
Kshs 3,912,600 |
Complete
|
| CGS/T04/163 |
LOT3-CONSTRUCTION OF LARE-OIBOR VENTED DRIFT |
2019/2020 |
Samburu Central |
Maralal |
Kshs 3,000,000 |
Kshs 3,789,200 |
Complete
|
| CGS/T04/164 |
LOT3-GRADING AND GRAVELLING OF NGARI AREA ROADS |
2019/2020 |
Samburu Central |
Maralal |
Kshs 16,800,000 |
Kshs 3,235,500 |
Complete
|
| CGS/T04/165 |
LOT1-IMPROVEMENT OF UNCL ROAD NGARI - LEDERO - BAAWA |
2019/2020 |
Samburu Central |
Maralal |
Kshs 3,000,000 |
Kshs 4,490,700 |
Complete
|
| CGS/T04/166 |
Lelendu Drift |
2021/2022 |
Samburu Central |
Maralal |
Kshs 3,000,000 |
Kshs 2,680,020 |
Complete
|
| CGS/T04/167 |
LOT3-GRADING AND GRAVELLING OF SHABAAH AREA ROADS |
2019/2020 |
Samburu Central |
Maralal |
Kshs 10,000,000 |
Kshs 3,844,000 |
Complete
|
| CGS/T04/168 |
LOT3-PROPOSED CONSTRUCTION OF SHABAA LOIDONG'O FOOT BRIDGE |
2019/2020 |
Samburu Central |
Maralal |
Kshs 3,000,000 |
Kshs 1,858,210 |
Complete
|
| CGS/T04/169 |
LOT4-PROPOSED CONSTRUCTION OF SHABAA VENTED DRIFT |
2019/2020 |
Samburu Central |
Maralal |
Kshs 4,000,000 |
Kshs 2,711,750 |
Complete
|
| CGS/T04/170 |
Maralal Dumpsite Road Project |
2020/2021 |
Samburu Central |
Maralal |
Kshs 4,700,000 |
Kshs 4,700,000 |
Complete
|
| CGS/T04/171 |
Opening of Cereal board roads |
2021/2022 |
Samburu Central |
Maralal |
Kshs 3,000,000 |
Kshs 2,799,400 |
Complete
|
| CGS/T04/069 |
LOT4-IMPROVEMENT OF UNCL ROAD LEIR - LKILORITI |
2019/2020 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 2,997,000 |
Complete
|
| CGS/T04/070 |
Baawa Jxn Leirr Road |
2021/2022 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,951,500 |
Complete
|
| CGS/T04/071 |
Improvement of Baawa junction -to Naiborkeju Road |
2021/2022 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 3,386,300 |
Complete
|
| CGS/T04/072 |
Construction of Seiya Bridge |
2015/2016 |
Samburu Central |
Lodokejek |
Kshs 40,000,000 |
Kshs 40,000,000 |
Complete
|
| CGS/T04/073 |
Footbridge at Seyia |
2024/2025 |
Samburu Central |
Lodokejek |
Kshs 5,000,000 |
Kshs 4,999,000 |
Complete
|
| CGS/T04/074 |
Construction of Marram Lpetpet - Lekuru road |
2016/2017 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 1,675,000 |
Complete
|
| CGS/T04/075 |
Construction of Unclassfied Road Lpetpet-Lekuru |
2017/2018 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,800,000 |
Complete
|
| CGS/T04/076 |
Construction of Kiangok bridge in Lodokejek |
2020/2021 |
Samburu Central |
Lodokejek |
Kshs 6,000,000 |
Kshs 5,798,100 |
Complete
|
| CGS/T04/077 |
Grading of kisima‐ Lkiloriti-Baawa road |
2021/2022 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,865,000 |
Complete
|
| CGS/T04/332 |
improvement of Laga-Lpashie Road |
2022/2023 |
Samburu East |
Wamba East |
Kshs 3,000,000 |
Kshs 2,957,000 |
Complete
|
| CGS/T04/078 |
Graveling of Baawa-Lkiloriti Road |
2016/2017 |
Samburu Central |
Lodokejek |
Kshs 2,000,000 |
Kshs 2,230,000 |
Complete
|
| CGS/T04/079 |
Repair of Lkiroriti Bridge |
2017/2018 |
Samburu Central |
Lodokejek |
Kshs 1,000,000 |
Kshs 1,000,000 |
Complete
|
| CGS/T04/080 |
Gravelling of Unclassfied Road Kisima Jxn-Lkiloriti-Baawa |
2017/2018 |
Samburu Central |
Lodokejek |
Kshs 2,000,000 |
Kshs 2,810,900 |
Complete
|
| CGS/T04/081 |
LOT2-IMPROVEMENT OF UNCL ROAD BAAWA-LKILORITI-NAIBORKEJU ROAD |
2019/2020 |
Samburu Central |
Lodokejek |
Kshs 3,800,000 |
Kshs 3,967,800 |
Complete
|
| CGS/T04/082 |
Improvement of ilkiloriti-Ngamata-Naborkeju Road |
2020/2021 |
Samburu Central |
Lodokejek |
Kshs 4,500,000 |
Kshs 2,980,680 |
Complete
|
| CGS/T04/083 |
Lalaingok- Kisima Road |
2021/2022 |
Samburu Central |
Lodokejek |
Kshs 5,000,000 |
Kshs 5,000,000 |
Complete
|
| CGS/T04/084 |
Kisima-Lalaingók Road |
2024/2025 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,992,800 |
Complete
|
| CGS/T04/085 |
LOT3-IMPROVEMENT OF UNCL ROAD KISIMA-LODOKEJEK |
2019/2020 |
Samburu Central |
Lodokejek |
Kshs 2,500,000 |
Kshs 3,901,000 |
Complete
|
| CGS/T04/086 |
Grading and gravelling of Kisima Lodokejek Road |
2022/2023 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 2,999,988 |
Complete
|
| CGS/T04/087 |
Improvement of Kisima-Lbaa Lesukuta-Loltulelei Road(Grading, Dozing and Vented Bridge) |
2020/2021 |
Samburu Central |
Lodokejek |
Kshs 6,500,000 |
Kshs 6,500,000 |
Complete
|
| CGS/T04/088 |
Opening of Unclassfied Road Sura Adoru-Lgirgir |
2017/2018 |
Samburu Central |
Lodokejek |
Kshs 3,500,000 |
Kshs 2,873,900 |
Complete
|
| CGS/T04/089 |
Opening of Suradoru- Lgirgir road Road |
2022/2023 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 3,489,000 |
Complete
|
| CGS/T04/090 |
Improvement of Garma-Kirimon Road |
2020/2021 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 3,981,100 |
Complete
|
| CGS/T04/091 |
Sura-adoru-Nkoteyia (W/F) |
2023/2024 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,900,800 |
Complete
|
| CGS/T04/092 |
Improvement of Sura adoru-Nkoteiya road |
2024/2025 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,900,800 |
Complete
|
| CGS/T04/093 |
Opening and grading of Locho-Nonkoiro road |
2021/2022 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,668,000 |
Complete
|
| CGS/T04/094 |
Lolmoti-Nonkoiro road |
2024/2025 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 3,998,900 |
Complete
|
| CGS/T04/095 |
LOT3-IMPROVEMENT OF KISIMA TOWN ROADS |
2019/2020 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,585,000 |
Complete
|
| CGS/T04/096 |
Lmisigiyoi area roads (W/F) |
2023/2024 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 3,977,975 |
Complete
|
| CGS/T04/097 |
Structures-Mparinkon-Kiyaingók |
2023/2024 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 3,790,000 |
Complete
|
| CGS/T04/249 |
Improvement of nontoto sawan road |
2022/2023 |
Samburu Central |
Poro |
Kshs 5,000,000 |
Kshs 4,974,000 |
Complete
|
| CGS/T04/250 |
Construction of a footbridge at Noontoto (Sere) |
2023/2024 |
Samburu Central |
Poro |
Kshs 4,000,000 |
Kshs 4,000,000 |
Complete
|
| CGS/T04/251 |
Construction of Nontoto Footbridge |
2024/2025 |
Samburu Central |
Poro |
Kshs 3,979,600 |
Kshs 3,979,600 |
Complete
|
| CGS/T04/252 |
Repair Works at Noontoto Bridge |
2023/2024 |
Samburu Central |
Poro |
Kshs 2,893,700 |
Kshs 2,893,700 |
Complete
|
| CGS/T04/253 |
Construction of culverts along Poro Road |
2019/2020 |
Samburu Central |
Poro |
Kshs 10,000,000 |
Kshs 2,300,000 |
Complete
|
| CGS/T04/254 |
Improvement of Poro Area Roads |
2020/2021 |
Samburu Central |
Poro |
Kshs 5,000,000 |
Kshs 4,568,500 |
Complete
|
| CGS/T04/255 |
Improvement of Lbaa-Olepo- Seketet Road |
2021/2022 |
Samburu Central |
Poro |
Kshs 4,000,000 |
Kshs 3,980,500 |
Complete
|
| CGS/T04/361 |
LOT4-GRADING AND GRAVELLING OF ACK COUNCIL AREA ROADS |
2019/2020 |
Samburu East |
Wamba North |
Kshs 15,000,000 |
Kshs 2,490,000 |
Complete
|
| CGS/T04/256 |
improvement of Lodunguro Road |
2022/2023 |
Samburu Central |
Poro |
Kshs 4,000,000 |
Kshs 4,000,700 |
Complete
|
| CGS/T04/257 |
Improvement of Malaso escarpment road |
2020/2021 |
Samburu Central |
Poro |
Kshs 3,000,000 |
Kshs 2,895,500 |
Complete
|
| CGS/T04/258 |
Improvement of Seketet -Junction Road |
2021/2022 |
Samburu Central |
Poro |
Kshs 3,000,000 |
Kshs 2,809,700 |
Complete
|
| CGS/T04/259 |
Opening of seketet roads |
2022/2023 |
Samburu Central |
Poro |
Kshs 3,000,000 |
Kshs 3,000,000 |
Complete
|
| CGS/T04/333 |
Improvement of Uncl Road Laga Lpashie |
2023/2024 |
Samburu East |
Wamba East |
Kshs 2,957,500 |
Kshs 2,957,500 |
Complete
|
| CGS/T04/423 |
SNR Roads(Murraming) |
2015/2016 |
Samburu East |
Waso |
Kshs 25,000,000 |
Kshs 25,000,000 |
Complete
|
| CGS/T04/260 |
Improvement of Sirata- Ngejumuny- Kisima road |
2020/2021 |
Samburu Central |
Poro |
Kshs 7,000,000 |
Kshs 5,832,100 |
Complete
|
| CGS/T04/261 |
Opening of sirata roads |
2022/2023 |
Samburu Central |
Poro |
Kshs 4,000,000 |
Kshs 3,997,000 |
Complete
|
| CGS/T04/262 |
Opening of Sirata access roads |
2024/2025 |
Samburu Central |
Poro |
Kshs 4,000,000 |
Kshs 4,000,000 |
Complete
|
| CGS/T04/263 |
Lemisiyio Pri-Nkare Narok-Lolkunono |
2024/2025 |
Samburu Central |
Poro |
Kshs 4,000,000 |
Kshs 4,000,000 |
Complete
|
| CGS/T04/264 |
Poro-Malaso phase II |
2016/2017 |
Samburu Central |
Poro |
Kshs 5,000,000 |
Kshs 5,000,000 |
Complete
|
| CGS/T04/424 |
Gravelling of Snr Road |
2017/2018 |
Samburu East |
Waso |
Kshs 30,000,000 |
Kshs 8,820,000 |
Complete
|
| CGS/T04/265 |
Porro-Malaso Phase Ii |
2017/2018 |
Samburu Central |
Poro |
Kshs 19,000,000 |
Kshs 8,486,000 |
Complete
|
| CGS/T04/266 |
LOT2-IMPROVEMENT OF UNCL ROAD PORO-LEMISIGIYO-SIRATA JXN |
2019/2020 |
Samburu Central |
Poro |
Kshs 13,800,000 |
Kshs 5,489,050 |
Complete
|
| CGS/T04/267 |
LOT2-IMPROVEMENT OF UNCL ROAD PORO-LOOSUK-SUGUTA MARMAR |
2019/2020 |
Samburu Central |
Poro |
Kshs 8,000,000 |
Kshs 7,937,900 |
Complete
|
| CGS/T04/268 |
Improvement of Lemisiyigo-Sawan-Poro Area Roads |
2020/2021 |
Samburu Central |
Poro |
Kshs 10,000,000 |
Kshs 8,975,195 |
Complete
|
| CGS/T04/269 |
Poro-Seketet-Lemisigiyo Road (W/F) |
2023/2024 |
Samburu Central |
Poro |
Kshs 3,697,000 |
Kshs 3,697,000 |
Complete
|
| CGS/T04/270 |
LOT2-IMPROVEMENT OF UNCL ROAD SITETI |
2019/2020 |
Samburu Central |
Poro |
Kshs 2,500,000 |
Kshs 9,274,500 |
Complete
|
| CGS/T04/425 |
Improvement of SNR In-Roads -Kiltamany Kalama Road |
2022/2023 |
Samburu East |
Waso |
Kshs 4,000,000 |
Kshs 3,996,000 |
Complete
|
| CGS/T04/426 |
Improvement of SNR Main road -33km (Gate to Gate) |
2022/2023 |
Samburu East |
Waso |
Kshs 17,000,000 |
Kshs 16,674,300 |
Complete
|
| CGS/T04/271 |
LOT2-OPENING OF UNCL ROAD LENTARAKWAI-LOITING-KALASHUTA |
2019/2020 |
Samburu Central |
Poro |
Kshs 6,300,000 |
Kshs 9,094,000 |
Complete
|
| CGS/T04/273 |
Opening of Centre-Loiting-Lentarakwai Road |
2016/2017 |
Samburu Central |
Poro |
Kshs 2,000,000 |
Kshs 2,000,000 |
Complete
|
| CGS/T04/274 |
Opening of Loiting- Lentarakwai road |
2017/2018 |
Samburu Central |
Poro |
Kshs 1,000,000 |
Kshs 1,750,000 |
Complete
|
| CGS/T04/275 |
Opening of Nkeju emuny roads |
2022/2023 |
Samburu Central |
Poro |
Kshs 3,000,000 |
Kshs 2,994,000 |
Complete
|
| CGS/T04/276 |
Maralal-Baragoi junction-Siambu-Malaso (W/F) |
2023/2024 |
Samburu Central |
Poro |
Kshs 3,489,700 |
Kshs 3,489,700 |
Complete
|
| CGS/T04/098 |
Construction of Pura Drift |
2016/2017 |
Samburu Central |
Loosuk |
Kshs 3,000,000 |
Kshs 2,893,950 |
Complete
|
| CGS/T04/100 |
Opening of Pura-Sapai Road |
2019/2020 |
Samburu Central |
Loosuk |
Kshs 2,000,000 |
Kshs 2,985,500 |
Complete
|
| CGS/T04/101 |
Bridge at Pura-Sapai road |
2021/2022 |
Samburu Central |
Loosuk |
Kshs 4,000,000 |
Kshs 3,795,150 |
Complete
|
| CGS/T04/102 |
LOT3-GRADING AND GRAVELLING OF UNCL ROAD LESIDAI-PURA |
2019/2020 |
Samburu Central |
Loosuk |
Kshs 3,000,000 |
Kshs 2,726,500 |
Complete
|
| CGS/T04/103 |
Pura-Lesidai Junction Gravelling |
2024/2025 |
Samburu Central |
Loosuk |
Kshs 4,000,000 |
Kshs 3,986,250 |
Complete
|
| CGS/T04/104 |
Improvement of Lesidai-Seketet Road |
2020/2021 |
Samburu Central |
Loosuk |
Kshs 4,500,000 |
Kshs 4,489,510 |
Complete
|
| CGS/T04/105 |
Learoni Drift |
2016/2017 |
Samburu Central |
Loosuk |
Kshs 3,000,000 |
Kshs 2,893,950 |
Complete
|
| CGS/T04/106 |
Construction of Learoni Vented Drift |
2017/2018 |
Samburu Central |
Loosuk |
Kshs 3,000,000 |
Kshs 2,693,950 |
Complete
|
| CGS/T04/107 |
Improvement of Loosuk-Learoni-Lkidiloto Road |
2020/2021 |
Samburu Central |
Loosuk |
Kshs 7,000,000 |
Kshs 4,081,000 |
Complete
|
| CGS/T04/108 |
Grading of Loibornkare-Loko Road |
2020/2021 |
Samburu Central |
Loosuk |
Kshs 3,000,000 |
Kshs 2,974,000 |
Complete
|
| CGS/T04/334 |
Jerusalem-Lpashie Road |
2024/2025 |
Samburu East |
Wamba East |
Kshs 4,000,000 |
Kshs 4,000,000 |
Complete
|
| CGS/T04/109 |
Improvement of Loikurkur-loiragai-lolmolog jxn |
2021/2022 |
Samburu Central |
Loosuk |
Kshs 4,000,000 |
Kshs 3,940,600 |
Complete
|
| CGS/T04/110 |
Construction of drift at Ngare Nanyuki/Noolkerra |
2021/2022 |
Samburu Central |
Loosuk |
Kshs 5,000,000 |
Kshs 796,000 |
Complete
|
| CGS/T04/111 |
Improvement of Loko -Ngarenanyokie-loosuk Road |
2022/2023 |
Samburu Central |
Loosuk |
Kshs 3,000,000 |
Kshs 2,974,500 |
Complete
|
| CGS/T04/112 |
LOT3-IMPROVEMENT OF UNCL ROAD NKOPELIANI-LOLKUNONO |
2019/2020 |
Samburu Central |
Loosuk |
Kshs 14,000,000 |
Kshs 3,751,865 |
Complete
|
| CGS/T04/113 |
Improvement of Ngoperian - Loisugta area Road |
2021/2022 |
Samburu Central |
Loosuk |
Kshs 5,000,000 |
Kshs 4,477,350 |
Complete
|
| CGS/T04/114 |
Opening of Nkopeliani-Lolketurai-Loiragai-Mugur road (W/F) |
2023/2024 |
Samburu Central |
Loosuk |
Kshs 4,000,000 |
Kshs 3,977,000 |
Complete
|
| CGS/T04/335 |
Improvement of Lolkeresire-Sereolipi Road |
2015/2016 |
Samburu East |
Wamba East |
Kshs 8,000,000 |
Kshs 8,242,880 |
Complete
|
| CGS/T04/115 |
Improvement of Nkopeliani -loiragai road |
2024/2025 |
Samburu Central |
Loosuk |
Kshs 4,000,000 |
Kshs 3,977,000 |
Complete
|
| CGS/T04/116 |
LOT 5- IMPROVEMENT OF UNCL ROAD KAAO LEPARASHAO |
2019/2020 |
Samburu Central |
Loosuk |
Kshs 2,000,000 |
Kshs 1,920,000 |
Complete
|
| CGS/T04/117 |
LOT3-IMPROVEMENT OF UNCL ROAD LOOSUK-LCHINGEI-LOROSOIT |
2019/2020 |
Samburu Central |
Loosuk |
Kshs 2,500,000 |
Kshs 1,791,000 |
Complete
|
| CGS/T04/118 |
Gravelling and Murruming of Lorosoit-Lchingei Road(W/F) |
2023/2024 |
Samburu Central |
Loosuk |
Kshs 3,612,000 |
Kshs 3,612,000 |
Complete
|
| CGS/T04/427 |
Improvement of SNR road |
2022/2023 |
Samburu East |
Waso |
Kshs 3,000,000 |
Kshs 3,000,000 |
Complete
|
| CGS/T04/119 |
Opening of Lolkunono-Lemisigiyo Road |
2015/2016 |
Samburu Central |
Loosuk |
Kshs 5,000,000 |
Kshs 4,944,000 |
Complete
|
| CGS/T04/120 |
Construction of Nkare-Narok Bridge(Lolkunono Section) |
2020/2021 |
Samburu Central |
Loosuk |
Kshs 13,000,000 |
Kshs 11,711,200 |
Complete
|
| CGS/T04/121 |
Lolkunono-Catholic-Letitiya-Nkare Narok |
2024/2025 |
Samburu Central |
Loosuk |
Kshs 3,000,000 |
Kshs 3,993,500 |
Complete
|
| CGS/T04/122 |
Opening of Nempurengei-Nalabobok road |
2022/2023 |
Samburu Central |
Loosuk |
Kshs 3,000,000 |
Kshs 2,964,500 |
Complete
|
| CGS/T04/123 |
Opening of Nkutuk elpoor-Ndikir-Nkapune Lolmisigiyoi-Loosuk |
2022/2023 |
Samburu Central |
Loosuk |
Kshs 4,000,000 |
Kshs 3,780,000 |
Complete
|
| CGS/T04/124 |
Ndoyio e Loik junction-Ngeriyoi Murraming and Gravelling of Pura-Lesidai junction |
2023/2024 |
Samburu Central |
Loosuk |
Kshs 3,865,500 |
Kshs 3,865,500 |
Complete
|
| CGS/T04/278 |
LOT2-CONSTRUCTION OF LEKASUIYAN BRIDGE |
2019/2020 |
Samburu Central |
Suguta |
Kshs 2,267,313 |
Kshs 7,938,300 |
Complete
|
| CGS/T04/279 |
Completion of Lekasuiyan Bridge |
2020/2021 |
Samburu Central |
Suguta |
Kshs 8,000,000 |
Kshs 8,000,000 |
Complete
|
| CGS/T04/280 |
LOT6- PROPOSED CONSTRUCTION OF RABAL FOOTBRIDGE |
2019/2020 |
Samburu Central |
Suguta |
Kshs 2,000,000 |
Kshs 2,000,000 |
Complete
|
| CGS/T04/281 |
Erection of drainage structures in Lorerai-Amaiya Road |
2020/2021 |
Samburu Central |
Suguta |
Kshs 5,000,000 |
Kshs 4,705,000 |
Complete
|
| CGS/T04/282 |
Improvement of Mbaringon-Longewan Road(Grading and Drift) |
2020/2021 |
Samburu Central |
Suguta |
Kshs 4,000,000 |
Kshs 3,871,400 |
Complete
|
| CGS/T04/283 |
Improvement of Angata-Ntim Nariko Road |
2020/2021 |
Samburu Central |
Suguta |
Kshs 4,300,000 |
Kshs 3,831,500 |
Complete
|
| CGS/T04/284 |
Improvement of Logorate-Nkutoto Road |
2022/2023 |
Samburu Central |
Suguta |
Kshs 3,500,000 |
Kshs 3,454,000 |
Complete
|
| CGS/T04/285 |
Improvement of Lorukoti-kao-Amaiya Road |
2015/2016 |
Samburu Central |
Suguta |
Kshs 20,000,000 |
Kshs 4,738,000 |
Complete
|
| CGS/T04/288 |
Lorumoki - Main road |
2016/2017 |
Samburu Central |
Suguta |
Kshs 2,000,000 |
Kshs 2,182,500 |
Complete
|
| CGS/T04/289 |
Construction of road Loikurkur-Lolgese-Nkutoto Arus- Angata Rongai-Sugata |
2016/2017 |
Samburu Central |
Suguta |
Kshs 20,000,000 |
Kshs 18,657,850 |
Complete
|
| CGS/T04/290 |
LOT 4- CONSTRUCTION OF CULVERTS ALONG LOIKURKUR - LOLGESE NKUTOTO ARUS- ANGATA RONGAI |
2019/2020 |
Samburu Central |
Suguta |
Kshs 9,000,000 |
Kshs 2,382,980 |
Complete
|
| CGS/T04/291 |
LOT 4- CONSTRUCTION OF SARAMAT - ALU DRIFT |
2019/2020 |
Samburu Central |
Suguta |
Kshs 3,000,000 |
Kshs 2,883,400 |
Complete
|
| CGS/T04/292 |
LOT2-IMPROVEMENT OF UNCL ROAD KISIMA LOLMOLOG |
2019/2020 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 4,509,700 |
Complete
|
| CGS/T04/293 |
Angata rongai to nkutoto arus road |
2019/2020 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 1,998,000 |
Complete
|
| CGS/T04/296 |
Opening of Angata Rongai Primary Road |
2022/2023 |
Samburu Central |
Suguta |
Kshs 3,000,000 |
Kshs 2,849,981 |
Complete
|
| CGS/T04/298 |
Longewan town to leparachao road |
2019/2020 |
Samburu Central |
Suguta |
Kshs 7,500,000 |
Kshs 2,700,000 |
Complete
|
| CGS/T04/299 |
Improvement of Longewan-Amiaya Road |
2021/2022 |
Samburu Central |
Suguta |
Kshs 10,000,000 |
Kshs 8,084,000 |
Complete
|
| CGS/T04/300 |
Opening of Uncl Road Longewan Area(Lmisigiyoi-Lentarakwai Road) |
2019/2020 |
Samburu Central |
Suguta |
Kshs 9,000,000 |
Kshs 2,700,000 |
Complete
|
| CGS/T04/301 |
Angata rongai to nkutoto arus road |
2019/2020 |
Samburu Central |
Suguta |
Kshs 4,500,000 |
Kshs 2,772,500 |
Complete
|
| CGS/T04/302 |
Improvement of Logorate-Longewan-Amaiya Road |
2020/2021 |
Samburu Central |
Suguta |
Kshs 7,000,000 |
Kshs 6,300,650 |
Complete
|
| CGS/T04/303 |
Improvement(Graveling) of Logorate-Longewan Road |
2021/2022 |
Samburu Central |
Suguta |
Kshs 5,000,000 |
Kshs 4,109,400 |
Complete
|
| CGS/T04/304 |
Suguta marmar town kijiji bridge- logorate town |
2023/2024 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,500,000 |
Complete
|
| CGS/T04/305 |
Improvement of Unclassified Road Suguta-Llmolog- Nomotio Road |
2017/2018 |
Samburu Central |
Suguta |
Kshs 4,000,000 |
Kshs 3,827,200 |
Complete
|
| CGS/T04/308 |
Opening of Unclassfied Road Lorumoki-Main |
2017/2018 |
Samburu Central |
Suguta |
Kshs 2,000,000 |
Kshs 2,262,830 |
Complete
|
| CGS/T04/314 |
Lmisigiyoi-Rangau-Lolgese Road |
2024/2025 |
Samburu Central |
Suguta |
Kshs 4,000,000 |
Kshs 3,995,000 |
Complete
|
| CGS/T04/315 |
Improvement of Suguta-Loosuk-Poro Road |
2021/2022 |
Samburu Central |
Suguta |
Kshs 15,000,000 |
Kshs 13,501,240 |
Complete
|
| CGS/T04/317 |
Kitobor-Nkutoto Arus-Lolgese-Suguta Road(Structures) |
2020/2021 |
Samburu Central |
Suguta |
Kshs 4,000,000 |
Kshs 3,925,800 |
Complete
|
| CGS/T04/318 |
Improvement of Unclassfied Road Kitobor-Lolmolog |
2017/2018 |
Samburu Central |
Suguta |
Kshs 2,200,000 |
Kshs 1,988,000 |
Complete
|
| CGS/T04/319 |
Lolmolog-Leswaa - Kitobor road |
2024/2025 |
Samburu Central |
Suguta |
Kshs 4,000,000 |
Kshs 3,994,795 |
Complete
|
| CGS/T04/321 |
Suguta- nkutotoelepere slab |
2023/2024 |
Samburu Central |
Suguta |
Kshs 3,000,000 |
Kshs 3,000,000 |
Complete
|
| CGS/T04/046 |
Baragoi-Lesirikan road |
2016/2017 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 3,000,000 |
Complete
|
| CGS/T04/047 |
LOT3-IMPROVEMENT OF E662 ROAD BARAGOI-LESIRIKAN-MASIKITA |
2019/2020 |
Samburu North |
Elbarta |
Kshs 2,500,000 |
Kshs 3,618,000 |
Complete
|
| CGS/T04/048 |
Baragoi-Logetei-Kawap road |
2016/2017 |
Samburu North |
Elbarta |
Kshs 4,000,000 |
Kshs 4,000,000 |
Complete
|
| CGS/T04/049 |
Improvement of Baragoi-Kentraco Road |
2020/2021 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,969,094 |
Complete
|
| CGS/T04/050 |
Improvement of Masikita-Soit Ngiro Road |
2020/2021 |
Samburu North |
Elbarta |
Kshs 4,000,000 |
Kshs 4,927,500 |
Complete
|
| CGS/T04/051 |
LOT 4-IMPROVEMENT OF UNCL ROAD SUYIAN-LNGOTIO |
2019/2020 |
Samburu North |
Elbarta |
Kshs 7,200,000 |
Kshs 2,830,000 |
Complete
|
| CGS/T04/052 |
Improvement of Suiyan-Lngotoi Road |
2020/2021 |
Samburu North |
Elbarta |
Kshs 4,000,000 |
Kshs 3,837,000 |
Complete
|
| CGS/T04/054 |
Improvement of Huruma-Nalingangor |
2022/2023 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,982,125 |
Complete
|
| CGS/T04/055 |
Improvement of Suyan-Marti road |
2020/2021 |
Samburu North |
Elbarta |
Kshs 10,000,000 |
Kshs 9,409,829 |
Complete
|
| CGS/T04/056 |
Improvement of Suyian-Marti road |
2021/2022 |
Samburu North |
Elbarta |
Kshs 5,859,000 |
Kshs 5,161,200 |
Complete
|
| CGS/T04/057 |
Opening of Suyan-Nteremuka road(W/F) |
2023/2024 |
Samburu North |
Elbarta |
Kshs 4,000,000 |
Kshs 3,899,660 |
Complete
|
| CGS/T04/058 |
Improvement of Unclassfied Road Baragoi-Logetei -Kawap |
2017/2018 |
Samburu North |
Elbarta |
Kshs 4,000,000 |
Kshs 3,381,400 |
Complete
|
| CGS/T04/059 |
Maintenance of Baragoi town Roads |
2022/2023 |
Samburu North |
Elbarta |
Kshs 4,000,000 |
Kshs 3,972,799 |
Complete
|
| CGS/T04/060 |
LOT2-IMPROVEMENT OF BARAGOI TOWN ROADS |
2019/2020 |
Samburu North |
Elbarta |
Kshs 4,000,000 |
Kshs 5,204,280 |
Complete
|
| CGS/T04/063 |
LOT 4-IMPROVEMENT OF UNCL ROAD MASIKITA - NTEREMKA |
2019/2020 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,845,000 |
Complete
|
| CGS/T04/064 |
Masikita-Nteremuka-Sere |
2023/2024 |
Samburu North |
Elbarta |
Kshs 4,000,000 |
Kshs 3,699,050 |
Complete
|
| CGS/T04/065 |
Masikita- Lekairab road |
2016/2017 |
Samburu North |
Elbarta |
Kshs 15,000,000 |
Kshs 15,000,000 |
Complete
|
| CGS/T04/066 |
Masikita-Leonti Road |
2024/2025 |
Samburu North |
Elbarta |
Kshs 4,000,000 |
Kshs 4,000,000 |
Complete
|
| CGS/T04/068 |
Opening, Dozing, Grading, Culverts and Gabbions of Baragoi bridge to Bendera road |
2023/2024 |
Samburu North |
Elbarta |
Kshs 4,000,000 |
Kshs 3,545,600 |
Complete
|
| CGS/T04/187 |
Loikumkum _ Urah _Sererit rd
|
2017/2018 |
Samburu North |
Ndooto |
Kshs 4,000,000 |
Kshs 3,931,400 |
Complete
|
| CGS/T04/188 |
LOT4-CONSTRUCTION OF SILAPAN DRIFT AT MPASH-URAH ROAD |
2019/2020 |
Samburu North |
Ndooto |
Kshs 7,200,000 |
Kshs 2,397,000 |
Complete
|
| CGS/T04/189 |
Grading of Mpaash Urah Road |
2021/2022 |
Samburu North |
Ndooto |
Kshs 4,500,000 |
Kshs 4,462,800 |
Complete
|
| CGS/T04/190 |
Imrovement of road E473 -Keno Nguronet |
2015/2016 |
Samburu North |
Ndooto |
Kshs 3,920,000 |
Kshs 3,248,340 |
Complete
|
| CGS/T04/191 |
Latakweny- Ngurunet Road(Dozing) |
2015/2016 |
Samburu North |
Ndooto |
Kshs 7,500,000 |
Kshs 7,000,000 |
Complete
|
| CGS/T04/192 |
Latakweny - Ngurunit road |
2016/2017 |
Samburu North |
Ndooto |
Kshs 24,000,000 |
Kshs 12,776,289 |
Complete
|
| CGS/T04/193 |
Improvement of Unclassfied Road Ngurunit - Latakweny |
2017/2018 |
Samburu North |
Ndooto |
Kshs 24,000,000 |
Kshs 7,550,000 |
Complete
|
| CGS/T04/194 |
Opening of Latakweny -Ntashata-Matepes-Lkaku-Sererit |
2022/2023 |
Samburu North |
Ndooto |
Kshs 7,000,000 |
Kshs 7,000,000 |
Complete
|
| CGS/T04/336 |
Improvement of Unclassfied Road Lolkesire - Sarara |
2017/2018 |
Samburu East |
Wamba East |
Kshs 4,000,000 |
Kshs 3,580,500 |
Complete
|
| CGS/T04/195 |
Provision of Lemolog - Kasipo road |
2016/2017 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 3,000,000 |
Complete
|
| CGS/T04/196 |
Improvement of Unclassfied Road Lemolog-Kasipo |
2017/2018 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 2,729,333 |
Complete
|
| CGS/T04/198 |
LOT3-IMPROVEMENT OF ROAD SEREN |
2019/2020 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 2,809,700 |
Complete
|
| CGS/T04/199 |
Grading of Seren Road |
2021/2022 |
Samburu North |
Ndooto |
Kshs 4,500,000 |
Kshs 3,942,100 |
Complete
|
| CGS/T04/200 |
LOT2-OPENING OF UNCL ROAD SEREN-URAH-LATAKWENY |
2019/2020 |
Samburu North |
Ndooto |
Kshs 2,200,000 |
Kshs 9,193,500 |
Complete
|
| CGS/T04/202 |
Soit Ngiro- Masikita Road |
2021/2022 |
Samburu North |
Ndooto |
Kshs 5,000,000 |
Kshs 4,927,500 |
Complete
|
| CGS/T04/203 |
Drift in Urah-Seren Road |
2020/2021 |
Samburu North |
Ndooto |
Kshs 4,000,000 |
Kshs 3,856,300 |
Complete
|
| CGS/T04/204 |
LOT3-IMPROVEMENT OF UNCL ROAD ILLAUT JUNCTION-ARSIM |
2019/2020 |
Samburu North |
Ndooto |
Kshs 4,000,000 |
Kshs 2,973,000 |
Complete
|
| CGS/T04/205 |
LOT2-CONSTRUCTION OF ARSIM RIVER BRIDGE |
2019/2020 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 8,295,625 |
Complete
|
| CGS/T04/206 |
Opening of Rooso Village Road |
2024/2025 |
Samburu North |
Ndooto |
Kshs 4,000,000 |
Kshs 3,988,500 |
Complete
|
| CGS/T04/207 |
Extension and improvement of Junction Illaut -Lechet Road |
2020/2021 |
Samburu North |
Ndooto |
Kshs 5,000,000 |
Kshs 3,942,100 |
Complete
|
| CGS/T04/208 |
Ilkotikal-Keleswa road |
2016/2017 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 3,000,000 |
Complete
|
| CGS/T04/209 |
Improvement of Baragoi Junction-Lesirkan- Keleswa Road |
2020/2021 |
Samburu North |
Ndooto |
Kshs 6,000,000 |
Kshs 5,239,000 |
Complete
|
| CGS/T04/210 |
Improvement of Baragoi Lesirikan keleswa road |
2022/2023 |
Samburu North |
Ndooto |
Kshs 5,000,000 |
Kshs 4,986,000 |
Complete
|
| CGS/T04/211 |
Improvement of Masikita-Latakweny Road |
2020/2021 |
Samburu North |
Ndooto |
Kshs 6,000,000 |
Kshs 5,181,704 |
Complete
|
| CGS/T04/212 |
Improvement of Latakweny-Loikumkum-Sererit |
2015/2016 |
Samburu North |
Ndooto |
Kshs 5,000,000 |
Kshs 4,747,200 |
Complete
|
| CGS/T04/213 |
LOT2-IMPROVEMENT OF UNCL ROAD LOIKUMKUM SERERIT |
2019/2020 |
Samburu North |
Ndooto |
Kshs 4,400,000 |
Kshs 13,785,400 |
Complete
|
| CGS/T04/214 |
Loikukum-Srereit |
2024/2025 |
Samburu North |
Ndooto |
Kshs 4,000,000 |
Kshs 3,897,200 |
Complete
|
| CGS/T04/215 |
Improvement of Loodua Jxn-Soit Ng'iro road |
2021/2022 |
Samburu North |
Ndooto |
Kshs 4,000,000 |
Kshs 3,633,500 |
Complete
|
| CGS/T04/216 |
Improvement of Masikita- Ndikir-Elauri |
2022/2023 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 2,993,100 |
Complete
|
| CGS/T04/217 |
Improvement of Masikita-Lekairab road |
2015/2016 |
Samburu North |
Ndooto |
Kshs 1,500,000 |
Kshs 1,500,000 |
Complete
|
| CGS/T04/218 |
Lesirkan- Lodua opening |
2015/2016 |
Samburu North |
Ndooto |
Kshs 11,000,000 |
Kshs 10,353,075 |
Complete
|
| CGS/T04/219 |
LOT 5 - IMPROVEMENT OF UNCL ROAD LESIRIKAN LODUA |
2019/2020 |
Samburu North |
Ndooto |
Kshs 3,200,000 |
Kshs 3,841,800 |
Complete
|
| CGS/T04/220 |
LOT3-IMPROVEMENT OF UNCL ROAD SOIT NGIRO |
2019/2020 |
Samburu North |
Ndooto |
Kshs 4,000,000 |
Kshs 2,662,500 |
Complete
|
| CGS/T04/221 |
LOT1-IMPROVEMENT OF UNCL ROAD LESIRIKAN -KELESWA-D371 JUNCTION |
2019/2020 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 5,808,500 |
Complete
|
| CGS/T04/222 |
Opening of Lesirikan-Tangar Road |
2020/2021 |
Samburu North |
Ndooto |
Kshs 4,000,000 |
Kshs 3,889,480 |
Complete
|
| CGS/T04/223 |
Opening of Loikumkum-Latakweny Road |
2020/2021 |
Samburu North |
Ndooto |
Kshs 5,000,000 |
Kshs 4,872,485 |
Complete
|
| CGS/T04/224 |
Improvement Masikita-Simiti-Loikumkum Road |
2023/2024 |
Samburu North |
Ndooto |
Kshs 3,848,000 |
Kshs 3,848,000 |
Complete
|
| CGS/T04/225 |
Improvement Masikita-Tankar junction-Loodua-Ura junction |
2023/2024 |
Samburu North |
Ndooto |
Kshs 4,000,000 |
Kshs 3,816,440 |
Complete
|
| CGS/T04/226 |
Erection of structures along South Horr-Sumuruai Road |
2020/2021 |
Samburu North |
Nyiro |
Kshs 3,000,000 |
Kshs 2,969,901 |
Complete
|
| CGS/T04/227 |
Erection of a slab in Simale River |
2020/2021 |
Samburu North |
Nyiro |
Kshs 3,000,000 |
Kshs 2,792,250 |
Complete
|
| CGS/T04/228 |
Lingatuny-Parkati road |
2023/2024 |
Samburu North |
Nyiro |
Kshs 3,595,529 |
Kshs 3,595,529 |
Complete
|
| CGS/T04/229 |
Improvement of Lingatuny -Parkati road |
2024/2025 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 3,595,529 |
Complete
|
| CGS/T04/230 |
Lingátuny-Parikati |
2024/2025 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 3,991,000 |
Complete
|
| CGS/T04/231 |
Improvement of Loruko-Nkume Road |
2020/2021 |
Samburu North |
Nyiro |
Kshs 5,000,000 |
Kshs 4,710,750 |
Complete
|
| CGS/T04/232 |
Improvement of Tuum town roads |
2021/2022 |
Samburu North |
Nyiro |
Kshs 5,000,000 |
Kshs 4,865,000 |
Complete
|
| CGS/T04/233 |
Improvement of Tuum-Parkati |
2015/2016 |
Samburu North |
Nyiro |
Kshs 3,000,000 |
Kshs 2,985,000 |
Complete
|
| CGS/T04/234 |
Improvement of Unclassfied Road Tuum - Lonjorin |
2017/2018 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 3,647,600 |
Complete
|
| CGS/T04/235 |
Loonjorin-Tuum |
2016/2017 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 4,000,000 |
Complete
|
| CGS/T04/236 |
LOT2-IMPROVEMENT OF UNCL ROAD TUUM LONJORIN |
2019/2020 |
Samburu North |
Nyiro |
Kshs 3,800,000 |
Kshs 16,720,000 |
Complete
|
| CGS/T04/237 |
Tuum-Loonjorin Road (W/F) |
2023/2024 |
Samburu North |
Nyiro |
Kshs 3,844,100 |
Kshs 3,844,100 |
Complete
|
| CGS/T04/238 |
Simale junction to simale center road |
2022/2023 |
Samburu North |
Nyiro |
Kshs 3,000,000 |
Kshs 2,983,062 |
Complete
|
| CGS/T04/239 |
LOT 4- TUUM TOWN DRAINAGE WORKS |
2019/2020 |
Samburu North |
Nyiro |
Kshs 3,000,050 |
Kshs 3,000,050 |
Complete
|
| CGS/T04/240 |
Tuum junction-Angata elekuru- Security road |
2023/2024 |
Samburu North |
Nyiro |
Kshs 3,750,662 |
Kshs 3,750,662 |
Complete
|
| CGS/T04/241 |
LOT 6- PROPOSED CONSTRUCTION OF SOUTH HORR FOOTBRIDGE |
2019/2020 |
Samburu North |
Nyiro |
Kshs 2,000,000 |
Kshs 2,000,000 |
Complete
|
| CGS/T04/242 |
LOT3-IMPROVEMENT OF UNCL ROAD LORUKO-UASO RONGAI-NGUME |
2019/2020 |
Samburu North |
Nyiro |
Kshs 3,500,000 |
Kshs 3,620,000 |
Complete
|
| CGS/T04/243 |
Improvement of waso rongai- Loruko road |
2022/2023 |
Samburu North |
Nyiro |
Kshs 3,000,000 |
Kshs 2,867,627 |
Complete
|
| CGS/T04/244 |
Loruko-Naisiicho junction Road |
2024/2025 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 3,992,500 |
Complete
|
| CGS/T04/246 |
Improvement of Anderi-Ntaletiani-Lonjorin Road |
2020/2021 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 3,949,955 |
Complete
|
| CGS/T04/247 |
Anderi-Ntaletiani Road |
2024/2025 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 3,956,852 |
Complete
|
| CGS/T04/248 |
Baragoi-Tuum-South Horr Junction - Tuum Town |
2023/2024 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 3,776,613 |
Complete
|
| CGS/T04/001 |
Improvement of Mlima Blue-Soit Pus Road |
2020/2021 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 5,000,000 |
Complete
|
| CGS/T04/002 |
Improvement of Nkorika-Ikujita-Iltirim Road |
2020/2021 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 4,899,731 |
Complete
|
| CGS/T04/003 |
Improvement of nkorika-loiganyai road |
2022/2023 |
Samburu North |
Angata Nanyukie |
Kshs 3,000,000 |
Kshs 2,993,000 |
Complete
|
| CGS/T04/004 |
Nkorika-Loiganyai Road |
2024/2025 |
Samburu North |
Angata Nanyukie |
Kshs 3,000,000 |
Kshs 3,042,750 |
Complete
|
| CGS/T04/005 |
Opening of silango-lkujita morijo road |
2022/2023 |
Samburu North |
Angata Nanyukie |
Kshs 4,000,000 |
Kshs 3,997,850 |
Complete
|
| CGS/T04/006 |
Silanko-Lkujita-Morijo (Structures) (W/F) |
2023/2024 |
Samburu North |
Angata Nanyukie |
Kshs 4,000,000 |
Kshs 3,992,500 |
Complete
|
| CGS/T04/007 |
Improvement of Lulu-Barsaloi Phase II |
2015/2016 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 5,000,000 |
Complete
|
| CGS/T04/008 |
Improvement of Lpusi-Lulu road |
2021/2022 |
Samburu North |
Angata Nanyukie |
Kshs 4,000,000 |
Kshs 3,832,500 |
Complete
|
| CGS/T04/009 |
Soit pus primary to radar main road |
2016/2017 |
Samburu North |
Angata Nanyukie |
Kshs 4,000,000 |
Kshs 4,000,000 |
Complete
|
| CGS/T04/382 |
Opening of Nkiseu- Nenterit Road |
2021/2022 |
Samburu East |
Wamba west |
Kshs 3,000,000 |
Kshs 2,225,380 |
Complete
|
| CGS/T04/010 |
Improvement of Unclassfied Road Poro Jxn - Angata Nanyukie |
2017/2018 |
Samburu North |
Angata Nanyukie |
Kshs 4,000,000 |
Kshs 3,848,075 |
Complete
|
| CGS/T04/011 |
LOT1-ROUTINE MAINTENANCE OF UNCL ROAD PORO-ANGATA NANYUKIE-SUNONI-LPUS |
2019/2020 |
Samburu North |
Angata Nanyukie |
Kshs 5,204,280 |
Kshs 6,937,300 |
Complete
|
| CGS/T04/012 |
Improvement of Poro- Angata Nanyokie Road |
2020/2021 |
Samburu North |
Angata Nanyukie |
Kshs 7,000,000 |
Kshs 6,289,800 |
Complete
|
| CGS/T04/013 |
Repair of Lkiroriti Bridge |
2017/2018 |
Samburu North |
Angata Nanyukie |
Kshs 4,000,000 |
Kshs 3,720,000 |
Complete
|
| CGS/T04/337 |
Lolkeresire- Sarara |
2016/2017 |
Samburu East |
Wamba East |
Kshs 4,000,000 |
Kshs 4,000,000 |
Complete
|
| CGS/T04/014 |
Improvement of Sunoni-Lpusi Phase II |
2015/2016 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 4,674,000 |
Complete
|
| CGS/T04/015 |
Barsaloi town road to lpusi road |
2022/2023 |
Samburu North |
Angata Nanyukie |
Kshs 4,000,000 |
Kshs 3,987,800 |
Complete
|
| CGS/T04/016 |
LOT2-OPENING OF UNCL ROAD ANGATA NANYUKIE-LTRIM-MORIJO-LELEERE |
2019/2020 |
Samburu North |
Angata Nanyukie |
Kshs 14,993,500 |
Kshs 14,993,500 |
Complete
|
| CGS/T04/017 |
Angata-Ltirim-Morijo |
2023/2024 |
Samburu North |
Angata Nanyukie |
Kshs 4,000,000 |
Kshs 3,700,000 |
Complete
|
| CGS/T04/018 |
Angata primary road-sunoni- lpusi |
2023/2024 |
Samburu North |
Angata Nanyukie |
Kshs 4,000,000 |
Kshs 3,541,490 |
Complete
|
| CGS/T04/019 |
Nkirenyi-Sunoni-Lpusi Road |
2024/2025 |
Samburu North |
Angata Nanyukie |
Kshs 4,000,000 |
Kshs 3,971,350 |
Complete
|
| CGS/T04/172 |
Nalingangor - Nachola Road |
2021/2022 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,776,200 |
Complete
|
| CGS/T04/338 |
Improvement of Lolkeresure -Sarara Road |
2020/2021 |
Samburu East |
Wamba East |
Kshs 5,000,000 |
Kshs 4,640,000 |
Complete
|
| CGS/T04/173 |
LOT 5- IMPROVEMENT OF UNCL ROAD LOGETEI KAWAP |
2019/2020 |
Samburu North |
Nachola |
Kshs 7,600,000 |
Kshs 2,567,500 |
Complete
|
| CGS/T04/174 |
Improvement of E667 Road Natrukan-Suguta |
2017/2018 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 2,590,000 |
Complete
|
| CGS/T04/175 |
Naturkan - Suguta road |
2016/2017 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 5,000,000 |
Complete
|
| CGS/T04/176 |
LOT1-OPENING OF UNCL ROAD NATURKAN TERTER |
2019/2020 |
Samburu North |
Nachola |
Kshs 4,905,000 |
Kshs 4,905,000 |
Complete
|
| CGS/T04/177 |
Naturkan-Terter Road |
2024/2025 |
Samburu North |
Nachola |
Kshs 4,000,000 |
Kshs 4,000,000 |
Complete
|
| CGS/T04/178 |
LOT2-CONSTRUCTION OF CONCRET SLAB ALONG NATURKAN SUGUTA VALLEY |
2019/2020 |
Samburu North |
Nachola |
Kshs 3,000,000 |
Kshs 7,372,900 |
Complete
|
| CGS/T04/179 |
Marti-Nadome road Phase 1 |
2016/2017 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 5,000,000 |
Complete
|
| CGS/T04/180 |
Opening of Unclassfied Road Marti- Nadome Phase 1 |
2017/2018 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 3,925,000 |
Complete
|
| CGS/T04/181 |
LOT2-OPENING OF UNCL ROAD MARTI-NADOME |
2019/2020 |
Samburu North |
Nachola |
Kshs 15,522,000 |
Kshs 15,522,000 |
Complete
|
| CGS/T04/182 |
Nachola -Suguta Valley structures |
2021/2022 |
Samburu North |
Nachola |
Kshs 7,000,000 |
Kshs 6,799,000 |
Complete
|
| CGS/T04/183 |
Nachola/Ayanae Atiir/Ngipuruo road |
2021/2022 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,974,500 |
Complete
|
| CGS/T04/184 |
Opening of Lenkima Nachola road |
2022/2023 |
Samburu North |
Nachola |
Kshs 4,000,000 |
Kshs 3,975,725 |
Complete
|
| CGS/T04/185 |
Opening of Nachola Lokuto Road |
2022/2023 |
Samburu North |
Nachola |
Kshs 4,000,000 |
Kshs 3,985,200 |
Complete
|
| CGS/T04/186 |
Lopurio-Nakuprat road(W/F) |
2023/2024 |
Samburu North |
Nachola |
Kshs 3,785,160 |
Kshs 3,785,160 |
Complete
|
| CGS/T04/021 |
Muruankai-Soit Nanyekie road |
2023/2024 |
Samburu North |
Baawa |
Kshs 4,000,000 |
Kshs 3,505,828 |
Complete
|
| CGS/T04/022 |
Soit Nanyekie to lchakwai Road |
2024/2025 |
Samburu North |
Baawa |
Kshs 4,000,000 |
Kshs 3,970,000 |
Complete
|
| CGS/T04/023 |
Imorovement of Lkiloriti jxn-Baawa road |
2021/2022 |
Samburu North |
Baawa |
Kshs 4,000,000 |
Kshs 3,799,848 |
Complete
|
| CGS/T04/024 |
Improvement of Maralal to Baawa junction road |
2021/2022 |
Samburu North |
Baawa |
Kshs 3,000,000 |
Kshs 2,797,000 |
Complete
|
| CGS/T04/025 |
Improvement of Loiku-Mukarate Road |
2020/2021 |
Samburu North |
Baawa |
Kshs 6,000,000 |
Kshs 5,459,100 |
Complete
|
| CGS/T04/026 |
Lalaigok Leiir Baawa Boys Road |
2022/2023 |
Samburu North |
Baawa |
Kshs 3,000,000 |
Kshs 2,982,000 |
Complete
|
| CGS/T04/027 |
Provision of repair of roads - Baawa - Naiborkeju(eastwards hills) |
2016/2017 |
Samburu North |
Baawa |
Kshs 2,000,000 |
Kshs 2,000,000 |
Complete
|
| CGS/T04/029 |
Improvement of Maralal- Opiroi Road |
2020/2021 |
Samburu North |
Baawa |
Kshs 12,500,000 |
Kshs 11,275,500 |
Complete
|
| CGS/T04/030 |
Improvement of Muruankai-Soit Nanyokie Road |
2020/2021 |
Samburu North |
Baawa |
Kshs 4,000,000 |
Kshs 3,852,492 |
Complete
|
| CGS/T04/032 |
Lodungokwe-Noonkeek-Naimaral |
2015/2016 |
Samburu North |
Baawa |
Kshs 5,000,000 |
Kshs 5,000,000 |
Complete
|
| CGS/T04/033 |
LOT 4- CONSTRUCTION OF LEVEL DRIFT AT NTEPES |
2019/2020 |
Samburu North |
Baawa |
Kshs 2,000,000 |
Kshs 2,159,000 |
Complete
|
| CGS/T04/034 |
LOT4-OPENING OF UNCL ROAD NAIMARAL |
2019/2020 |
Samburu North |
Baawa |
Kshs 5,500,000 |
Kshs 1,883,500 |
Complete
|
| CGS/T04/035 |
Improvement of Barsaloi jxn-Naimarlal- Lailelai road |
2022/2023 |
Samburu North |
Baawa |
Kshs 4,000,000 |
Kshs 3,998,400 |
Complete
|
| CGS/T04/036 |
Ntepes-Naimaral-Lailelai road(W/F) |
2023/2024 |
Samburu North |
Baawa |
Kshs 4,000,000 |
Kshs 3,934,500 |
Complete
|
| CGS/T04/038 |
Noonkeek-Opiroi road |
2016/2017 |
Samburu North |
Baawa |
Kshs 5,000,000 |
Kshs 5,000,000 |
Complete
|
| CGS/T04/039 |
Improvement of Unclassfied Road Opiroi-Noonkeek |
2017/2018 |
Samburu North |
Baawa |
Kshs 5,000,000 |
Kshs 5,000,000 |
Complete
|
| CGS/T04/041 |
Opiroi Primary Foot Bridge |
2021/2022 |
Samburu North |
Baawa |
Kshs 4,000,000 |
Kshs 3,893,300 |
Complete
|
| CGS/T04/042 |
Protection and reinforcement of Opiroi foot bridge |
2023/2024 |
Samburu North |
Baawa |
Kshs 2,809,800 |
Kshs 2,809,800 |
Complete
|
| CGS/T04/043 |
Opening of Nomboroi- Ludokume road |
2021/2022 |
Samburu North |
Baawa |
Kshs 3,000,000 |
Kshs 3,978,000 |
Complete
|
| CGS/T04/379 |
Construction of a drift in Lpus Kurseni Drift |
2020/2021 |
Samburu East |
Wamba West |
Kshs 3,500,000 |
Kshs 3,500,000 |
Complete
|
| CGS/T04/380 |
Construction of Nagor Owuaru Bridge(Along Lodungokwe-West Gate Road) |
2020/2021 |
Samburu East |
Wamba West |
Kshs 12,000,000 |
Kshs 11,914,500 |
Complete
|
| CGS/T04/381 |
Construction of Nagor Owuaru drift at Nkisieu |
2017/2018 |
Samburu East |
Wamba West |
Kshs 4,000,000 |
Kshs 3,894,500 |
Complete
|
| CGS/T04/383 |
Grading of Nkaroni -Lbaa onyokie road |
2022/2023 |
Samburu East |
Wamba West |
Kshs 2,500,000 |
Kshs 2,486,956 |
Complete
|
| CGS/T04/384 |
Construction of Drift at Lbaa Onyekie River |
2023/2024 |
Samburu East |
Wamba West |
Kshs 4,000,000 |
Kshs 3,999,000 |
Complete
|
| CGS/T04/385 |
Improvement of Lbaaonyokie-Resim-Lowamurt Road |
2020/2021 |
Samburu East |
Wamba West |
Kshs 4,000,000 |
Kshs 3,915,000 |
Complete
|
| CGS/T04/386 |
Improvement of Lpus-Kurseine-Resin Road |
2020/2021 |
Samburu East |
Wamba West |
Kshs 4,000,000 |
Kshs 3,946,000 |
Complete
|
| CGS/T04/387 |
Improvement of westgate area roads |
2022/2023 |
Samburu East |
Wamba west |
Kshs 3,000,000 |
Kshs 2,948,000 |
Complete
|
| CGS/T04/388 |
Improvement of Lodung'okwe-West Gate road |
2021/2022 |
Samburu East |
Wamba West |
Kshs 7,000,000 |
Kshs 6,675,400 |
Complete
|
| CGS/T04/389 |
Gravelling and drainage of A2-Westgate road |
2015/2016 |
Samburu East |
Wamba West |
Kshs 10,000,000 |
Kshs 24,979,305 |
Complete
|
| CGS/T04/390 |
LOT2-GRADING AND GRAVELLING OF A2 WESTGATE(SNR TRUNK ROAD) |
2019/2020 |
Samburu East |
Wamba West |
Kshs 12,752,105 |
Kshs 12,752,105 |
Complete
|
| CGS/T04/391 |
Improvement of A2-westgate road |
2021/2022 |
Samburu East |
Wamba west |
Kshs 8,000,000 |
Kshs 7,273,945 |
Complete
|
| CGS/T04/394 |
Improvement of Lengei-Lolua road |
2015/2016 |
Samburu East |
Wamba West |
Kshs 4,997,400 |
Kshs 4,997,400 |
Complete
|
| CGS/T04/395 |
Improvement of lengusaka - sirata road |
2022/2023 |
Samburu East |
Wamba west |
Kshs 3,000,000 |
Kshs 2,960,000 |
Complete
|
| CGS/T04/396 |
Improvement of Lodungokwe town roads |
2015/2016 |
Samburu East |
Wamba West |
Kshs 3,000,000 |
Kshs 2,950,000 |
Complete
|
| CGS/T04/397 |
Lodungokwe-Westgate |
2016/2017 |
Samburu East |
Wamba West |
Kshs 20,000,000 |
Kshs 9,843,765 |
Complete
|
| CGS/T04/398 |
LOT1-SPOT IMPROVEMENT OF UNCL ROAD LODUNGOKWE-WESTGATE |
2019/2020 |
Samburu East |
Wamba West |
Kshs 2,500,000 |
Kshs 5,546,800 |
Complete
|
| CGS/T04/399 |
Improvement of Lodung'okwe to West gate Road |
2020/2021 |
Samburu East |
Wamba West |
Kshs 8,000,000 |
Kshs 7,361,700 |
Complete
|
| CGS/T04/400 |
Improvement of Lodungokwe Town roads |
2022/2023 |
Samburu East |
Wamba West |
Kshs 3,000,000 |
Kshs 2,900,000 |
Complete
|
| CGS/T04/339 |
Lolkeresire-Sarara Road |
2024/2025 |
Samburu East |
Wamba East |
Kshs 4,000,000 |
Kshs 3,961,000 |
Complete
|
| CGS/T04/340 |
Structures in Lpesie Road |
2020/2021 |
Samburu East |
Wamba East |
Kshs 5,000,000 |
Kshs 4,781,100 |
Complete
|
| CGS/T04/401 |
Naisunyai-Sukuroi |
2023/2024 |
Samburu East |
Wamba West |
Kshs 3,000,000 |
Kshs 2,726,750 |
Complete
|
| CGS/T04/402 |
Improvement of Naisunyai-Sukuroi road |
2024/2025 |
Samburu East |
Wamba West |
Kshs 3,000,000 |
Kshs 3,000,000 |
Complete
|
| CGS/T04/403 |
Improvement of SNR In-Roads -Lpus Leluai Road |
2022/2023 |
Samburu East |
Wamba West |
Kshs 4,000,000 |
Kshs 3,979,000 |
Complete
|
| CGS/T04/404 |
Improvement of Uncl Road Samburu National Reserve |
2023/2024 |
Samburu East |
Wamba West |
Kshs 16,674,200 |
Kshs 16,674,200 |
Complete
|
| CGS/T04/405 |
Improvement of Uncl Road Kiltamany-Kalama |
2023/2024 |
Samburu East |
Wamba West |
Kshs 4,000,000 |
Kshs 3,996,000 |
Complete
|
| CGS/T04/406 |
Improvement of Uncl Road Lpusi Leluai |
2023/2024 |
Samburu East |
Wamba West |
Kshs 4,000,000 |
Kshs 3,979,000 |
Complete
|
| CGS/T04/407 |
Lenkusaka-Westgate road |
2016/2017 |
Samburu East |
Wamba West |
Kshs 4,000,000 |
Kshs 4,000,000 |
Complete
|
| CGS/T04/408 |
Lenkusaka-West Gate-Lpus le Luai |
2023/2024 |
Samburu East |
Wamba West |
Kshs 4,000,000 |
Kshs 3,985,000 |
Complete
|
| CGS/T04/409 |
LOT2-IMPROVEMENT OF UNCL ROAD NGILAI-MURIT |
2019/2020 |
Samburu East |
Wamba west |
Kshs 13,488,000 |
Kshs 13,488,000 |
Complete
|
| CGS/T04/410 |
LOT3-OPENING OF UNCL ROAD LORUKO-LOPESIWO |
2019/2020 |
Samburu East |
Wamba West |
Kshs 15,000,000 |
Kshs 2,435,500 |
Complete
|
| CGS/T04/411 |
LOT3-ROUTINE MAINTENANCE OF UNCL ROAD LODUNGOKWE-NOONKEK ROAD |
2019/2020 |
Samburu East |
Wamba West |
Kshs 3,000,000 |
Kshs 2,005,000 |
Complete
|
| CGS/T04/412 |
Naibelibeli- C 79 junction Road |
2016/2017 |
Samburu East |
Wamba West |
Kshs 4,000,000 |
Kshs 5,000,000 |
Complete
|
| CGS/T04/413 |
Opening of Naibelibeli - Jxnc79 |
2017/2018 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 5,006,000 |
Complete
|
| CGS/T04/325 |
Nchakwan drift(Lolkuniani Road) |
2016/2017 |
Samburu East |
Wamba East |
Kshs 3,000,000 |
Kshs 1,927,700 |
Complete
|
| CGS/T04/326 |
Loruko-Nkogoltim-Lorian-Lolkuniani |
2016/2017 |
Samburu East |
Wamba East |
Kshs 3,000,000 |
Kshs 3,000,000 |
Complete
|
| CGS/T04/327 |
Improvement of Unclassfied Road Loruko-Nkogoltim-Lolkuniani |
2017/2018 |
Samburu East |
Wamba East |
Kshs 3,000,000 |
Kshs 2,575,308 |
Complete
|
| CGS/T04/328 |
Improvement of Town to Ngogoltim Road |
2020/2021 |
Samburu East |
Wamba East |
Kshs 3,000,000 |
Kshs 2,835,500 |
Complete
|
| CGS/T04/329 |
Improvement of Unclassfied Road Lenchekut-Lolkuniani |
2017/2018 |
Samburu East |
Wamba East |
Kshs 2,200,000 |
Kshs 2,141,600 |
Complete
|
| CGS/T04/330 |
Opening of Lenjekut- Lpaga Jxn road |
2021/2022 |
Samburu East |
Wamba East |
Kshs 2,500,000 |
Kshs 2,497,000 |
Complete
|
| CGS/T04/331 |
Lolkuniyani-Mpagas |
2023/2024 |
Samburu East |
Wamba East |
Kshs 3,700,350 |
Kshs 3,700,350 |
Complete
|
| CGS/T04/341 |
LOT2-IMPROVEMENT OF WAMBA TOWN ROADS |
2019/2020 |
Samburu East |
Wamba East |
Kshs 3,000,000 |
Kshs 4,553,500 |
Complete
|
| CGS/T04/342 |
Maintenance of Wamba town Roads |
2021/2022 |
Samburu East |
Wamba East |
Kshs 5,000,000 |
Kshs 4,302,350 |
Complete
|
| CGS/T04/343 |
Improvement of treetop Ntepes Road |
2022/2023 |
Samburu East |
Wamba East |
Kshs 3,000,000 |
Kshs 2,994,432 |
Complete
|
| CGS/T04/344 |
LOT3-CONSTRUCTION OF LEVEL DRIFT AT LKISIN |
2019/2020 |
Samburu East |
Wamba East |
Kshs 4,000,000 |
Kshs 2,274,500 |
Complete
|
| CGS/T04/345 |
Barsilinga-Nalepo boo-Lmooli (W/F) |
2023/2024 |
Samburu East |
Wamba East |
Kshs 4,000,000 |
Kshs 3,512,500 |
Complete
|
| CGS/T04/392 |
Improvement of Barsilinga -Nalepo boo -Lmooli Road |
2024/2025 |
Samburu East |
Wamba East |
Kshs 4,000,000 |
Kshs 4,000,000 |
Complete
|
| CGS/T04/357 |
LOT 4-IMPROVEMENT OF UNCLROAD LOLKUNIANI-NKOKOYEI-NDONYO NASIPS ROADS |
2019/2020 |
Samburu East |
Wamba North |
Kshs 6,000,000 |
Kshs 3,874,000 |
Complete
|
| CGS/T04/358 |
LOT1-ROUTINE MAINTENANCE OF UNCL ROAD NGILAI-LOLKUNIANI-WAMBA |
2019/2020 |
Samburu East |
Wamba North |
Kshs 1,444,800 |
Kshs 5,306,100 |
Complete
|
| CGS/T04/359 |
Opening of Lolkuniayani Mpagas-Njok |
2021/2022 |
Samburu East |
Wamba North |
Kshs 4,500,000 |
Kshs 4,495,000 |
Complete
|
| CGS/T04/360 |
LOT3-REPAIR OF LOSIKIRIASHI DRIFT |
2019/2020 |
Samburu East |
Wamba North |
Kshs 2,500,000 |
Kshs 1,444,800 |
Complete
|
| CGS/T04/362 |
Opening of Nairimirimo- Gilati Road |
2020/2021 |
Samburu East |
Wamba North |
Kshs 3,000,000 |
Kshs 2,950,000 |
Complete
|
| CGS/T04/363 |
Nairimirimo - Nalkapur Road |
2021/2022 |
Samburu East |
Wamba North |
Kshs 2,000,000 |
Kshs 1,832,500 |
Complete
|
| CGS/T04/364 |
Improvement of Nairimirimo Nkwe Entome Road |
2021/2022 |
Samburu East |
Wamba North |
Kshs 5,000,000 |
Kshs 3,946,713 |
Complete
|
| CGS/T04/365 |
Improvement of Nairimirimo-Lorokonyokie road |
2021/2022 |
Samburu East |
Wamba North |
Kshs 3,500,000 |
Kshs 3,148,000 |
Complete
|
| CGS/T04/366 |
Nairimirimo-Lorrok Onyekie-Milgis Road |
2024/2025 |
Samburu East |
Wamba North |
Kshs 4,000,000 |
Kshs 3,998,320 |
Complete
|
| CGS/T04/367 |
Ndume-Nanguiya road |
2016/2017 |
Samburu East |
Wamba North |
Kshs 3,000,000 |
Kshs 3,000,000 |
Complete
|
| CGS/T04/368 |
Improvement of Unclassfied Road Ndume-Nkusoroni-Nanguiya |
2017/2018 |
Samburu East |
Wamba North |
Kshs 3,000,000 |
Kshs 2,978,641 |
Complete
|
| CGS/T04/369 |
Ndume-Nkusoroni-Nanguyia Pre School Road |
2024/2025 |
Samburu East |
Wamba North |
Kshs 4,000,000 |
Kshs 3,993,540 |
Complete
|
| CGS/T04/370 |
Improvement of Nkare Narok to Ndonyo Nasipa Phase2 |
2020/2021 |
Samburu East |
Wamba North |
Kshs 5,000,000 |
Kshs 4,928,000 |
Complete
|
| CGS/T04/371 |
Construction of Rig Rig bridge |
2015/2016 |
Samburu East |
Wamba North |
Kshs 20,000,000 |
Kshs 20,000,000 |
Complete
|
| CGS/T04/372 |
Rigrig- Ngare Narok-Ndonyio Nasipa-Lorrok onyokie road |
2016/2017 |
Samburu East |
Wamba North |
Kshs 11,400,000 |
Kshs 15,070,410 |
Complete
|
| CGS/T04/373 |
Rigrig bridge |
2016/2017 |
Samburu East |
Wamba North |
Kshs 15,000,000 |
Kshs 15,000,000 |
Complete
|
| CGS/T04/374 |
LOT2-CONSTRUCTION OF UNCL ROAD RIGRIG-NOLOTORO-NGARE NAROK-NDONYO NASIPA |
2019/2020 |
Samburu East |
Wamba North |
Kshs 2,500,000 |
Kshs 17,009,000 |
Complete
|
| CGS/T04/375 |
Improvement of Rigrig-Oromodiei-Nkare Narok |
2021/2022 |
Samburu East |
Wamba North |
Kshs 8,000,000 |
Kshs 6,504,500 |
Complete
|
| CGS/T04/376 |
Improvement of Rigrig- Ndonyo nasipa |
2022/2023 |
Samburu East |
Wamba North |
Kshs 5,000,000 |
Kshs 5,000,000 |
Complete
|
| CGS/T04/377 |
Rigrig-Ndonyuo Nasipa road (W/F) |
2023/2024 |
Samburu East |
Wamba North |
Kshs 4,000,000 |
Kshs 3,736,250 |
Complete
|
| CGS/T04/378 |
Seyia-Leiroyia Road |
2024/2025 |
Samburu East |
Wamba North |
Kshs 4,000,000 |
Kshs 3,980,000 |
Complete
|
| CGS/T04/417 |
Grading of Loijuk-Lerata road |
2022/2023 |
Samburu East |
Waso |
Kshs 4,000,000 |
Kshs 3,965,000 |
Complete
|
| CGS/T04/418 |
Improvement of Archers Town Roads |
2020/2021 |
Samburu East |
Waso |
Kshs 8,000,000 |
Kshs 7,070,200 |
Complete
|
| CGS/T04/419 |
Maintenance of Archerspost town roads |
2022/2023 |
Samburu East |
Waso |
Kshs 3,000,000 |
Kshs 3,998,000 |
Complete
|
| CGS/T04/420 |
Archers Post Town Roads |
2024/2025 |
Samburu East |
Waso |
Kshs 4,000,000 |
Kshs 3,976,050 |
Complete
|
| CGS/T04/421 |
Improvement of Archers Post- Nakwamoru Road |
2020/2021 |
Samburu East |
Waso |
Kshs 4,000,000 |
Kshs 3,988,750 |
Complete
|
| CGS/T04/422 |
Improvement of Nkutoto Elendira -Nosuran-Nosunyai Road |
2020/2021 |
Samburu East |
Waso |
Kshs 6,000,000 |
Kshs 5,385,400 |
Complete
|
| CGS/T04/428 |
Lerata- Lojuk road |
2015/2016 |
Samburu East |
Waso |
Kshs 18,000,000 |
Kshs 17,861,848 |
Complete
|
| CGS/T04/429 |
LOT1-ROUTINE MAINTENANCE OF UNCL ROAD SEREOLIPI-NDONYO WASIN |
2019/2020 |
Samburu East |
Waso |
Kshs 1,798,000 |
Kshs 6,729,000 |
Complete
|
| CGS/T04/430 |
LOT3-CONSTRUCTION OF CULVERTS ALONG SEREOLIPI-LOLKERESIRE ROAD |
2019/2020 |
Samburu East |
Waso |
Kshs 3,000,000 |
Kshs 2,292,000 |
Complete
|
| CGS/T04/431 |
LOT3-ROUTINE MAINTENANCE OF UNCL ROAD LARESORO-LOSESIA |
2019/2020 |
Samburu East |
Waso |
Kshs 2,000,000 |
Kshs 3,684,000 |
Complete
|
| CGS/T04/432 |
Opening of Nakwamoru -Laresoro road |
2022/2023 |
Samburu East |
Waso |
Kshs 4,000,000 |
Kshs 3,900,000 |
Complete
|
| CGS/T04/433 |
Ltergesi -waso Road |
2024/2025 |
Samburu East |
Waso |
Kshs 4,000,000 |
Kshs 3,999,500 |
Complete
|
| CGS/T04/434 |
Kiltamany-Kalama drift (W/F) |
2023/2024 |
Samburu East |
Waso |
Kshs 4,000,000 |
Kshs 3,997,500 |
Complete
|
| CGS/T04/435 |
Lorubae-Lentarawet road |
2023/2024 |
Samburu East |
Waso |
Kshs 4,000,000 |
Kshs 3,794,000 |
Complete
|
| CGS/T04/436 |
Improvement of E665 Road Ndonyo Wasin-Pareu |
2017/2018 |
Samburu East |
Waso |
Kshs 15,000,000 |
Kshs 13,504,170 |
Complete
|
| CGS/T04/437 |
Opening Unclassfied Road Ndonyo Wasin -Meuwa |
2017/2018 |
Samburu East |
Waso |
Kshs 3,500,000 |
Kshs 3,349,600 |
Complete
|
| CGS/T04/438 |
Opening of Uncl Road Ndonyo Wasin-Nkii |
2023/2024 |
Samburu East |
Waso |
Kshs 4,500,000 |
Kshs 4,500,000 |
Complete
|