| CGS/TTC/044 |
Warden house ngilai conservancy |
2018/2019 |
Samburu East |
Wamba North |
Kshs 1,500,000 |
Kshs 1,340,000 |
Complete
|
| CGS/H/001 |
Lodungokwe health centre Outpatient block |
2022/2023 |
Samburu East |
Wamba West |
Kshs 7,296,530 |
Kshs 6,899,970 |
Complete
|
| CGS/H/002 |
Lodungokwe health center toilets |
2014/2015 |
Samburu East |
Wamba West |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/003 |
Naisunyai dispensary. |
2014/2015 |
Samburu East |
Wamba West |
Kshs 3,875,000 |
Kshs 2,493,410 |
Complete
|
| CGS/H/004 |
Naisunyai dispensary staff house |
2013/2014 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 4,500,000 |
Complete
|
| CGS/H/005 |
Naisunyai dispensary fence |
2020/2021 |
Samburu East |
Wamba West |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/006 |
Naisunyai dispensary toilets |
2023/2024 |
Samburu East |
Wamba West |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/007 |
Kiltamanydispensary |
2019/2020 |
Samburu East |
Wamba West |
Kshs 2,306,000 |
Kshs 2,029,508 |
Complete
|
| CGS/H/008 |
Kiltamanydispensary fence |
2015/2016 |
Samburu East |
Wamba West |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/009 |
Kiltamany dispensary toilets |
2022/2023 |
Samburu East |
Wamba West |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/010 |
Kiltamany dispensary staff house |
2014/2015 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 4,500,000 |
Complete
|
| CGS/H/011 |
Nkutuk engiron maternity block |
2013/2014 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 4,988,800 |
Complete
|
| CGS/H/012 |
Nkutuk engiron opd block |
2016/2017 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 4,500,000 |
Complete
|
| CGS/H/013 |
Lpus dispensary opd block |
2018/2019 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 4,500,000 |
Complete
|
| CGS/H/014 |
Lpus dispensary fence |
2018/2019 |
Samburu East |
Wamba West |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/015 |
Lpus dispensary toilets |
2014/2015 |
Samburu East |
Wamba West |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/016 |
Lpus dispensary staff house |
2023/2024 |
Samburu East |
Wamba West |
Kshs 4,000,000 |
Kshs 3,825,000 |
Complete
|
| CGS/H/017 |
Nkutuk elmuget dispensary center opd block |
2018/2019 |
Samburu East |
Wamba West |
Kshs 1,735,000 |
Kshs 1,527,232 |
Complete
|
| CGS/H/018 |
Nkutuk elmuget dispensary fence |
2013/2014 |
Samburu East |
Wamba West |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/019 |
Nkutuk elmuget dispensary toilet |
2016/2017 |
Samburu East |
Wamba West |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/020 |
Nkutuk elmuget dispensary staff house |
2014/2015 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 4,500,000 |
Complete
|
| CGS/H/021 |
Lekiji dispensary OPD block |
2022/2023 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 4,785,000 |
Complete
|
| CGS/H/022 |
Lekiji dispensary staff house |
2018/2019 |
Samburu East |
Wamba West |
Kshs 4,000,000 |
Kshs 3,825,000 |
Complete
|
| CGS/H/023 |
Lekiji dispensary toilets |
2017/2018 |
Samburu East |
Wamba West |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/024 |
Remote dispensary opd block |
2020/2021 |
Samburu East |
Wamba West |
Kshs 4,278,800 |
Kshs 3,765,364 |
Complete
|
| CGS/H/025 |
Remote dispensary staff house |
2020/2021 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 4,500,000 |
Complete
|
| CGS/H/026 |
Remote dispensary fence |
2023/2024 |
Samburu East |
Wamba West |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/027 |
Remote dispensary toilets |
2022/2023 |
Samburu East |
Wamba West |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/028 |
Wamba subcounty hospital |
2015/2016 |
Samburu East |
Wamba East |
Kshs 10,000,000 |
Kshs 9,850,803 |
Complete
|
| CGS/H/029 |
Wamba subcounty hospital - Outpatient Block |
2015/2016 |
Samburu East |
Wamba East |
Kshs 10,000,000 |
Kshs 9,850,803 |
Complete
|
| CGS/H/030 |
Wamba Theatre Construction |
2023/2024 |
Samburu East |
Wamba East |
Kshs 10,000,000 |
Kshs 8,990,030 |
Complete
|
| CGS/H/031 |
Golgotim dispensary and sanitary block |
2018/2019 |
Samburu East |
Wamba East |
Kshs 5,000,000 |
Kshs 4,705,400 |
Complete
|
| CGS/H/032 |
Golgotim Staff House and Fencing Works |
2017/2018 |
Samburu East |
Wamba East |
Kshs 5,000,000 |
Kshs 4,999,440 |
Complete
|
| CGS/H/033 |
Lengarde dispensary |
2013/2014 |
Samburu East |
Wamba East |
Kshs 5,000,000 |
Kshs 4,807,325 |
Complete
|
| CGS/H/034 |
Lolkuniani dispensary |
2019/2020 |
Samburu East |
Wamba East |
Kshs 5,000,000 |
Kshs 4,807,325 |
Complete
|
| CGS/H/035 |
Lengusaka Dispensary |
2022/2023 |
Samburu East |
Wamba East |
Kshs 5,000,000 |
Kshs 4,807,325 |
Complete
|
| CGS/H/036 |
Lengusaka Dispensary Fencing |
2016/2017 |
Samburu East |
Wamba East |
Kshs 2,100,000 |
Kshs 2,066,700 |
Complete
|
| CGS/H/037 |
Kibartare Dispensary,staff house,toillet and fencing |
2020/2021 |
Samburu East |
Wamba North |
Kshs 11,500,000 |
Kshs 11,759,738 |
Complete
|
| CGS/H/038 |
Lmarmaroi dispensary block |
2020/2021 |
Samburu East |
Wamba North |
Kshs 5,000,000 |
Kshs 4,807,325 |
Complete
|
| CGS/H/039 |
Lmarmaroi dispensary staff house |
2019/2020 |
Samburu East |
Wamba North |
Kshs 2,000,000 |
Kshs 1,813,975 |
Complete
|
| CGS/H/040 |
Lmarmaroi dispensary-fencing |
2019/2020 |
Samburu East |
Wamba North |
Kshs 900,000 |
Kshs 787,500 |
Complete
|
| CGS/H/041 |
Lmarmaroi dispensary-toilets |
2016/2017 |
Samburu East |
Wamba North |
Kshs 700,000 |
Kshs 687,500 |
Complete
|
| CGS/H/042 |
Marti elepareu-dispensary & STAFF HOUSE |
2013/2014 |
Samburu East |
Wamba North |
Kshs 4,500,000 |
Kshs 4,172,480 |
Complete
|
| CGS/H/043 |
Martielepareu dispensary -fencing work |
2018/2019 |
Samburu East |
Wamba North |
Kshs 800,000 |
Kshs 720,500 |
Complete
|
| CGS/H/044 |
Milgis dispensary opd block |
2013/2014 |
Samburu East |
Wamba North |
Kshs 12,000,000 |
Kshs 7,831,590 |
Complete
|
| CGS/H/045 |
Milgis dispensary staff house |
2016/2017 |
Samburu East |
Wamba North |
Kshs 3,000,000 |
Kshs 2,750,000 |
Complete
|
| CGS/H/046 |
Milgis dispensary fencing work |
2018/2019 |
Samburu East |
Wamba North |
Kshs 800,000 |
Kshs 720,500 |
Complete
|
| CGS/H/047 |
Milgis dispensary toilets |
2019/2020 |
Samburu East |
Wamba North |
Kshs 700,000 |
Kshs 687,500 |
Complete
|
| CGS/H/048 |
Lorok onyokie dispensary |
2023/2024 |
Samburu East |
Wamba North |
Kshs 5,000,000 |
Kshs 4,807,325 |
Complete
|
| CGS/H/049 |
Nairimirimo dispensary -OPD block |
2023/2024 |
Samburu East |
Wamba North |
Kshs 5,000,000 |
Kshs 4,807,325 |
Complete
|
| CGS/H/050 |
Nairimirimo dispensary-staff house |
2019/2020 |
Samburu East |
Wamba North |
Kshs 3,500,000 |
Kshs 3,499,110 |
Complete
|
| CGS/H/051 |
Nairimirimo dispensary-fence |
2016/2017 |
Samburu East |
Wamba North |
Kshs 700,000 |
Kshs 687,500 |
Complete
|
| CGS/H/052 |
Nairimirimo dispensary -toilets |
2017/2018 |
Samburu East |
Wamba North |
Kshs 700,000 |
Kshs 687,500 |
Complete
|
| CGS/H/053 |
Ndonyo nasipa dispensary cdf |
2016/2017 |
Samburu East |
Wamba North |
Kshs 5,000,000 |
Kshs 4,800,000 |
Complete
|
| CGS/H/054 |
Ndonyo nasipa dispensary fence |
2016/2017 |
Samburu East |
Wamba North |
Kshs 700,000 |
Kshs 687,500 |
Complete
|
| CGS/H/055 |
Ndonyo nasipa dispensary-toilets |
2018/2019 |
Samburu East |
Wamba North |
Kshs 700,000 |
Kshs 687,500 |
Complete
|
| CGS/H/056 |
Ngilai health centre opd block |
2020/2021 |
Samburu East |
Wamba North |
Kshs 3,500,000 |
Kshs 3,499,110 |
Complete
|
| CGS/H/057 |
Ngilai Health centre maternity Block |
2014/2015 |
Samburu East |
Wamba North |
Kshs 5,000,000 |
Kshs 4,999,965 |
Complete
|
| CGS/H/058 |
Ngilai Dispensary staff house |
2023/2024 |
Samburu East |
Wamba North |
Kshs 8,186,660 |
Kshs 9,547,700 |
Complete
|
| CGS/H/059 |
Ngilai Dispensary Fencing |
2018/2019 |
Samburu East |
Wamba North |
Kshs 2,000,000 |
Kshs 1,990,400 |
Complete
|
| CGS/H/060 |
Oromoidei dispensary -OPD block |
2015/2016 |
Samburu East |
Wamba North |
Kshs 10,000,000 |
Kshs 9,642,600 |
Complete
|
| CGS/H/061 |
Oromoidei dispensary-staff house |
2013/2014 |
Samburu East |
Wamba North |
Kshs 5,000,000 |
Kshs 4,999,965 |
Complete
|
| CGS/H/062 |
Oromoidei dispensary-fencing |
2022/2023 |
Samburu East |
Wamba North |
Kshs 700,000 |
Kshs 687,500 |
Complete
|
| CGS/H/063 |
Sirata le murit dispensary |
2017/2018 |
Samburu East |
Wamba North |
Kshs 5,000,000 |
Kshs 4,999,965 |
Complete
|
| CGS/H/064 |
Sirata le murit dispensary-fence |
2018/2019 |
Samburu East |
Wamba North |
Kshs 700,000 |
Kshs 687,500 |
Complete
|
| CGS/H/065 |
Sirata le murit dispensary-staff house |
2013/2014 |
Samburu East |
Wamba North |
Kshs 4,000,000 |
Kshs 2,110,689 |
Complete
|
| CGS/H/066 |
Sirata le murit dispensary toilet |
2017/2018 |
Samburu East |
Wamba North |
Kshs 900,000 |
Kshs 875,000 |
Complete
|
| CGS/H/067 |
Swari health centre |
2022/2023 |
Samburu East |
Wamba North |
Kshs 15,000,000 |
Kshs 1,801,225 |
Complete
|
| CGS/H/068 |
Swari health centre staff house |
2022/2023 |
Samburu East |
Wamba North |
Kshs 4,000,000 |
Kshs 2,110,689 |
Complete
|
| CGS/H/069 |
Swari health centre-toilets |
2016/2017 |
Samburu East |
Wamba North |
Kshs 900,000 |
Kshs 875,000 |
Complete
|
| CGS/H/070 |
Twala dispensary staff house |
2022/2023 |
Samburu East |
Wamba North |
Kshs 3,000,000 |
Kshs 2,613,146 |
Complete
|
| CGS/H/071 |
Twala dispensary |
2013/2014 |
Samburu East |
Wamba North |
Kshs 5,000,000 |
Kshs 4,999,965 |
Complete
|
| CGS/H/072 |
Twala dispensary -toilets |
2022/2023 |
Samburu East |
Wamba North |
Kshs 900,000 |
Kshs 875,000 |
Complete
|
| CGS/H/073 |
Purchase of Ambulance |
2019/2020 |
Samburu East |
Wamba North |
Kshs 14,000,000 |
Kshs 1,619,000 |
Complete
|
| CGS/H/074 |
Ndume Dispensary- Ndume Dispensary,Staff House & Sanitary Block Fence (Part) |
2020/2021 |
Samburu East |
Waso |
Kshs 10,000,000 |
Kshs 9,785,600 |
Complete
|
| CGS/H/075 |
Lesurua Dispensary |
2014/2015 |
Samburu East |
Waso |
Kshs 5,000,000 |
Kshs 4,807,325 |
Complete
|
| CGS/H/076 |
Kalama Dispensary OPD |
2019/2020 |
Samburu East |
Waso |
Kshs 5,000,000 |
Kshs 4,999,965 |
Complete
|
| CGS/H/077 |
Kalama Dispensary Staff house |
2013/2014 |
Samburu East |
Waso |
Kshs 3,500,000 |
Kshs 3,499,110 |
Complete
|
| CGS/H/078 |
Archers Post Sub-County Hospital |
2023/2024 |
Samburu East |
Waso |
Kshs 10,000,000 |
Kshs 26,776,040 |
Complete
|
| CGS/H/079 |
Archers Post Sub-County Hospital |
2018/2019 |
Samburu East |
Waso |
Kshs 17,000,000 |
Kshs 13,546,399 |
Complete
|
| CGS/H/082 |
Ndonyo Wasin Health Centre |
2014/2015 |
Samburu East |
Waso |
Kshs 5,000,000 |
Kshs 4,999,965 |
Complete
|
| CGS/H/083 |
Ndonyo Wasin Dispensary-Maternity Wing |
2019/2020 |
Samburu East |
Waso |
Kshs 5,000,000 |
Kshs 3,974,600 |
Complete
|
| CGS/H/084 |
Nauneri Dispensary-OPD Block, Staffhouse and pit latrine |
2016/2017 |
Samburu Central |
Porro |
Kshs 5,000,000 |
Kshs 4,640,520 |
Complete
|
| CGS/H/085 |
Nauneri Dispensary-Fencing works |
2017/2018 |
Samburu Central |
Porro |
Kshs 2,008,000 |
Kshs 2,000,050 |
Complete
|
| CGS/H/086 |
Ngano dispensary OPD block and pit latrine |
2017/2018 |
Samburu Central |
Porro |
Kshs 4,000,000 |
Kshs 3,802,510 |
Complete
|
| CGS/H/087 |
Ngano dispensary -staff house |
2018/2019 |
Samburu Central |
Porro |
Kshs 3,500,000 |
Kshs 3,499,110 |
Complete
|
| CGS/H/088 |
Ngano dispensary-fence work |
2019/2020 |
Samburu Central |
Porro |
Kshs 700,000 |
Kshs 675,025 |
Complete
|
| CGS/H/089 |
Porro health centre- OPD block |
2015/2016 |
Samburu Central |
Porro |
Kshs 3,000,000 |
Kshs 2,640,000 |
Complete
|
| CGS/H/247 |
Muruangai Dispensary fence |
2017/2018 |
Samburu North |
Baawa |
Kshs 900,000 |
Kshs 875,000 |
Complete
|
| CGS/H/090 |
Porro health centre-maternity |
2016/2017 |
Samburu Central |
Porro |
Kshs 5,000,000 |
Kshs 4,645,520 |
Complete
|
| CGS/H/091 |
Porro health centre-fence |
2015/2016 |
Samburu Central |
Porro |
Kshs 700,000 |
Kshs 675,025 |
Complete
|
| CGS/H/092 |
Porro health centre-toilets |
2019/2020 |
Samburu Central |
Porro |
Kshs 700,000 |
Kshs 675,025 |
Complete
|
| CGS/H/093 |
Porro health centre-staff house |
2020/2021 |
Samburu Central |
Porro |
Kshs 3,500,000 |
Kshs 3,499,110 |
Complete
|
| CGS/H/094 |
Seketet dispensary-OPD block |
2023/2024 |
Samburu Central |
Porro |
Kshs 9,000,000 |
Kshs 8,187,620 |
Complete
|
| CGS/H/095 |
Seketet dispensary-sanitary block |
2014/2015 |
Samburu Central |
Porro |
Kshs 700,000 |
Kshs 675,025 |
Complete
|
| CGS/H/096 |
Seketet dispensary- staff house |
2014/2015 |
Samburu Central |
Porro |
Kshs 3,500,000 |
Kshs 3,499,110 |
Complete
|
| CGS/H/097 |
Seketet dispensary-fencing work |
2017/2018 |
Samburu Central |
Porro |
Kshs 700,000 |
Kshs 675,025 |
Complete
|
| CGS/H/098 |
Sirata oirobi maternity block |
2015/2016 |
Samburu Central |
Porro |
Kshs 4,500,000 |
Kshs 4,252,226 |
Complete
|
| CGS/H/099 |
Sirata oirobi OPD |
2014/2015 |
Samburu Central |
Porro |
Kshs 9,000,000 |
Kshs 8,187,620 |
Complete
|
| CGS/H/100 |
Sirata oirobi -fencing work |
2023/2024 |
Samburu Central |
Porro |
Kshs 700,000 |
Kshs 675,025 |
Complete
|
| CGS/H/101 |
Lpartuk Dispensary |
2015/2016 |
Samburu Central |
Maralal |
Kshs 5,000,000 |
Kshs 4,857,600 |
Complete
|
| CGS/H/102 |
Lkuroto Dispensary |
2017/2018 |
Samburu Central |
Maralal |
Kshs 5,000,000 |
Kshs 4,750,000 |
Complete
|
| CGS/H/103 |
Ledero Health Centre |
2017/2018 |
Samburu Central |
Maralal |
Kshs 5,000,000 |
Kshs 3,966,200 |
Complete
|
| CGS/H/104 |
Samburu County Referral Hospital |
2022/2023 |
Samburu Central |
Maralal |
Kshs 102,000,000 |
Kshs 100,000,000 |
Complete
|
| CGS/H/105 |
Lekuru dispensary |
2015/2016 |
Samburu Central |
Lodokejek |
Kshs 6,250,000 |
Kshs 7,273,100 |
Complete
|
| CGS/H/106 |
Mugur Dispensary OPD and Sanitary block |
2015/2016 |
Samburu Central |
Lodokejek |
Kshs 6,250,000 |
Kshs 8,211,726 |
Complete
|
| CGS/H/107 |
Mugur dispensary staff house |
2013/2014 |
Samburu Central |
Lodokejek |
Kshs 2,000,000 |
Kshs 1,539,720 |
Complete
|
| CGS/H/108 |
Lmisigiyoi dispensary OPD |
2014/2015 |
Samburu Central |
Lodokejek |
Kshs 2,200,000 |
Kshs 3,868,123 |
Complete
|
| CGS/H/109 |
Lmisigiyoi dispensary staff house |
2016/2017 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,500,000 |
Complete
|
| CGS/H/110 |
Lmisigiyoi dispensary sanitary block |
2013/2014 |
Samburu Central |
Lodokejek |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/111 |
Kirimon dispensary OPD |
Funded by CDF |
Samburu Central |
Lodokejek |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/H/112 |
Kirimon dispensary sanitary block |
2022/2023 |
Samburu Central |
Lodokejek |
Kshs 1,000,000 |
Kshs 992,000 |
Complete
|
| CGS/H/113 |
CONSTRUCTION OF OPD AND LABORATORY BLOCK AT BARAGOI HEALTH CENTRE |
2013/2014 |
Samburu North |
Elbarta |
Kshs 10,000,000 |
Kshs 7,021,300 |
Complete
|
| CGS/H/114 |
CONSTRUCTION OF A SEPTIC TANK AT BARAGOI HOSPITAL |
2020/2021 |
Samburu North |
Elbarta |
Kshs 2,000,000 |
Kshs 1,940,140 |
Complete
|
| CGS/H/115 |
Baragoi Sub-county Hospital Incenerator |
2020/2021 |
Samburu North |
Elbarta |
Kshs 2,000,000 |
Kshs 1,940,140 |
Complete
|
| CGS/H/116 |
Baragoi Sub-county Hospital -Kitchen |
2017/2018 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,700,000 |
Complete
|
| CGS/H/117 |
Baragoi Sub-County Hospital- Mortuary |
2022/2023 |
Samburu North |
Elbarta |
Kshs 5,000,000 |
Kshs 2,244,750 |
Complete
|
| CGS/H/118 |
Baragoi Sub-County Hospital- Outpatient Block |
2020/2021 |
Samburu North |
Elbarta |
Kshs 10,000,000 |
Kshs 8,858,700 |
Complete
|
| CGS/H/119 |
CONSTRUCTION OF SURGICAL WARD AT BARAGOI HEALTH CENTRE |
2015/2016 |
Samburu North |
Elbarta |
Kshs 10,000,000 |
Kshs 7,336,650 |
Complete
|
| CGS/H/120 |
Baragoi Sub-county Hospital-Maternity Wing. |
2014/2015 |
Samburu North |
Elbarta |
Kshs 5,000,000 |
Kshs 4,750,000 |
Complete
|
| CGS/H/121 |
CONSTRUCTION OF LAUNDRY HOUSE AT BARAGOI HOSPITAL |
2017/2018 |
Samburu North |
Elbarta |
Kshs 1,000,000 |
Kshs 799,260 |
Complete
|
| CGS/H/122 |
Baragoi Sub-County Hospital-Medical Ward |
2015/2016 |
Samburu North |
Elbarta |
Kshs 2,500,000 |
Kshs 2,355,220 |
Complete
|
| CGS/H/123 |
Baragoi Sub-county Hospital-Nutrition Stores. |
2019/2020 |
Samburu North |
Elbarta |
Kshs 2,000,000 |
Kshs 1,940,140 |
Complete
|
| CGS/H/124 |
CONSTRUCTION OF WALKWAYS AND CANOPY AT BARAGOI HOSPITAL SAMBURU NORTH SUB-COUNTY |
2016/2017 |
Samburu North |
Elbarta |
Kshs 2,500,000 |
Kshs 2,000,000 |
Complete
|
| CGS/H/125 |
Baragoi Sub-county hospital-Staff Quarters |
2020/2021 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,700,000 |
Complete
|
| CGS/H/126 |
Baragoi Sub-county Hospital-Surgical Ward |
2017/2018 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,700,000 |
Complete
|
| CGS/H/146 |
Logorate dispensary Sanitory Block |
2014/2015 |
Samburu Central |
Suguta |
Kshs 1,000,000 |
Kshs 990,000 |
Complete
|
| CGS/H/127 |
Bendera Dispensary OPD |
2021/2022 |
Samburu North |
Elbarta |
Kshs 5,000,000 |
Kshs 3,974,600 |
Complete
|
| CGS/H/128 |
Bendera Dispensary Pit latrine |
2014/2015 |
Samburu North |
Elbarta |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/129 |
CSSD-Unit |
2014/2015 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,975,650 |
Complete
|
| CGS/H/130 |
CONSTRUCTION OF LORROK ONYEKIE DISPENSARY OPD |
2013/2014 |
Samburu North |
Elbarta |
Kshs 10,000,000 |
Kshs 8,858,700 |
Complete
|
| CGS/H/131 |
CONSTRUCTION OF LORROK ONYEKIE DISPENSARY staff house |
2020/2021 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,700,000 |
Complete
|
| CGS/H/132 |
CONSTRUCTION OF LORROK ONYEKIE DISPENSARY toilets |
2023/2024 |
Samburu North |
Elbarta |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/133 |
CONSTRUCTION OF LORROK ONYEKIE DISPENSARY maternity |
2019/2020 |
Samburu North |
Elbarta |
Kshs 5,000,000 |
Kshs 4,750,000 |
Complete
|
| CGS/H/134 |
Masikita GOK Healthcentre |
2015/2016 |
Samburu North |
Elbarta |
Kshs 10,000,000 |
Kshs 8,858,700 |
Complete
|
| CGS/H/135 |
CONSTRUCTION OF LESOIT NAIBOR DISPENSARY, STAFF HOUSE, SANITARY BLOCK AND FENCING |
2022/2023 |
Samburu North |
Elbarta |
Kshs 5,000,000 |
Kshs 4,258,671 |
Complete
|
| CGS/H/136 |
PAYMENT FOR CONSTRUCTION OF MASIKITA SIMITI DISPENSARY OPD and toilets |
2014/2015 |
Samburu North |
Elbarta |
Kshs 5,000,000 |
Kshs 5,000,000 |
Complete
|
| CGS/H/137 |
Soit Ng'iro Dispensary OPD and Sanitary Block |
2013/2014 |
Samburu North |
Elbarta |
Kshs 5,000,000 |
Kshs 4,935,265 |
Complete
|
| CGS/H/138 |
Suyian Dispensary OPD/Pitlatrine/fence/staffhouse |
2016/2017 |
Samburu North |
Elbarta |
Kshs 10,000,000 |
Kshs 9,888,992 |
Complete
|
| CGS/H/139 |
Ang'ata Rongai Dispensary |
2018/2019 |
Samburu Central |
Suguta |
Kshs 4,500,000 |
Kshs 4,494,545 |
Complete
|
| CGS/H/140 |
Angata rongai dispensary-fence |
2018/2019 |
Samburu Central |
Suguta |
Kshs 700,000 |
Kshs 675,000 |
Complete
|
| CGS/H/141 |
Angata rongai dispensary-toilets |
2014/2015 |
Samburu Central |
Suguta |
Kshs 700,000 |
Kshs 675,000 |
Complete
|
| CGS/H/142 |
Angata rongai dispensary-staff house |
2023/2024 |
Samburu Central |
Suguta |
Kshs 3,500,000 |
Kshs 3,498,215 |
Complete
|
| CGS/H/143 |
Kitobor Dispensary & Sanitary Block |
2018/2019 |
Samburu Central |
Suguta |
Kshs 4,000,000 |
Kshs 3,802,515 |
Complete
|
| CGS/H/144 |
Logorate dispensary |
2013/2014 |
Samburu Central |
Suguta |
Kshs 5,000,000 |
Kshs 4,750,000 |
Complete
|
| CGS/H/145 |
Logorate dispensary Staff house |
2016/2017 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,175,000 |
Complete
|
| CGS/H/208 |
Tuum maternity |
2014/2015 |
Samburu North |
Nyiro |
Kshs 5,000,000 |
Kshs 4,683,464 |
Complete
|
| CGS/H/147 |
Fencing of logorate Dispensary |
2022/2023 |
Samburu Central |
Suguta |
Kshs 1,500,000 |
Kshs 1,250,000 |
Complete
|
| CGS/H/148 |
Lolgese Dispensary |
2018/2019 |
Samburu Central |
Suguta |
Kshs 5,000,000 |
Kshs 4,750,000 |
Complete
|
| CGS/H/149 |
FENCING WORKS AT LOLGESE DISPENSARIES |
2017/2018 |
Samburu Central |
Suguta |
Kshs 5,000,000 |
Kshs 4,750,000 |
Complete
|
| CGS/H/150 |
Longewan dispensary |
2020/2021 |
Samburu Central |
Suguta |
Kshs 5,000,000 |
Kshs 4,750,000 |
Complete
|
| CGS/H/151 |
Longewan sanitary block |
2020/2021 |
Samburu Central |
Suguta |
Kshs 1,000,000 |
Kshs 965,065 |
Complete
|
| CGS/H/152 |
Longewan Equipment |
2023/2024 |
Samburu Central |
Suguta |
Kshs 1,000,000 |
Kshs 990,000 |
Complete
|
| CGS/H/153 |
OUTPATIENT BLOCK AT LONGEWAN |
2022/2023 |
Samburu Central |
Suguta |
Kshs 3,500,000 |
Kshs 3,498,215 |
Complete
|
| CGS/H/154 |
CONSTRUCTION OF STAFF BLOCK AT LONGEWAN DISPENSARY |
2015/2016 |
Samburu Central |
Suguta |
Kshs 3,000,000 |
Kshs 2,862,955 |
Complete
|
| CGS/H/155 |
CONSTRUCTION OF SUGUTA OPD BLOCK |
2015/2016 |
Samburu Central |
Suguta |
Kshs 10,000,000 |
Kshs 9,946,200 |
Complete
|
| CGS/H/156 |
CONSTRUCTION AND UPGRADE OF POWER HOUSE AT SUGUTA MARMAR SUB-COUNTY HOSPITAL |
2023/2024 |
Samburu Central |
Suguta |
Kshs 3,500,000 |
Kshs 3,498,215 |
Complete
|
| CGS/H/157 |
CANOPY EXTENSION AT SUGUTA HEALTH CENTRE |
2018/2019 |
Samburu Central |
Suguta |
Kshs 700,000 |
Kshs 669,480 |
Complete
|
| CGS/H/158 |
Arsim Dispensary male and female wards |
2017/2018 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 2,973,545 |
Complete
|
| CGS/H/159 |
Arsim Dispensary OPD |
2013/2014 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 2,741,222 |
Complete
|
| CGS/H/161 |
Toilets at Keleswa Dispensary |
2022/2023 |
Samburu North |
Ndooto |
Kshs 500,000 |
Kshs 457,500 |
Complete
|
| CGS/H/162 |
Keleswa fence |
2016/2017 |
Samburu North |
Ndooto |
Kshs 1,500,000 |
Kshs 1,357,500 |
Complete
|
| CGS/H/163 |
staff house at Keleswa Dispensary |
2020/2021 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 2,750,000 |
Complete
|
| CGS/H/164 |
latakweny dispensary sanitary block |
2020/2021 |
Samburu North |
Ndooto |
Kshs 1,000,000 |
Kshs 989,235 |
Complete
|
| CGS/H/165 |
Latakweny health centre staff house |
2019/2020 |
Samburu North |
Ndooto |
Kshs 2,500,000 |
Kshs 2,275,000 |
Complete
|
| CGS/H/166 |
Lodua dispensary OPD |
2019/2020 |
Samburu North |
Ndooto |
Kshs 5,000,000 |
Kshs 4,920,765 |
Complete
|
| CGS/H/167 |
Lodua dipensary sanitary block |
2016/2017 |
Samburu North |
Ndooto |
Kshs 1,200,000 |
Kshs 1,250,000 |
Complete
|
| CGS/H/168 |
Lodua dispensary fencing |
2013/2014 |
Samburu North |
Ndooto |
Kshs 2,000,000 |
Kshs 2,028,450 |
Complete
|
| CGS/H/169 |
Loikumkum dispensary maternity block |
2018/2019 |
Samburu North |
Ndooto |
Kshs 5,200,000 |
Kshs 5,007,037 |
Complete
|
| CGS/H/170 |
Loikumkum dispensary block |
2013/2014 |
Samburu North |
Ndooto |
Kshs 2,240,000 |
Kshs 2,829,351 |
Complete
|
| CGS/H/171 |
Loikumkum staff house |
2016/2017 |
Samburu North |
Ndooto |
Kshs 2,500,000 |
Kshs 2,250,000 |
Complete
|
| CGS/H/172 |
Loikumkum fencing |
2018/2019 |
Samburu North |
Ndooto |
Kshs 1,500,000 |
Kshs 1,320,000 |
Complete
|
| CGS/H/173 |
Seren dispensary OPD |
2019/2020 |
Samburu North |
Ndooto |
Kshs 2,240,000 |
Kshs 2,016,000 |
Complete
|
| CGS/H/174 |
SEREN DISPENSARY Construction of a staff house,pit latrine and fence |
2023/2024 |
Samburu North |
Ndooto |
Kshs 10,000,000 |
Kshs 6,224,149 |
Complete
|
| CGS/H/175 |
Urah dispensary OPD and staff house |
2023/2024 |
Samburu North |
Ndooto |
Kshs 1,500,000 |
Kshs 1,365,000 |
Complete
|
| CGS/H/176 |
Urah dispensary_Sanitary block and fencing |
2019/2020 |
Samburu North |
Ndooto |
Kshs 3,500,000 |
Kshs 3,403,960 |
Complete
|
| CGS/H/177 |
sanitary block and fencing at Urah dispensary |
2016/2017 |
Samburu North |
Ndooto |
Kshs 2,000,000 |
Kshs 1,876,500 |
Complete
|
| CGS/H/178 |
Lesidai Dispensary |
2017/2018 |
Samburu Central |
Loosuk |
Kshs 4,500,000 |
Kshs 4,500,000 |
Complete
|
| CGS/H/179 |
Lesidai dispensary-fence |
2016/2017 |
Samburu Central |
Loosuk |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/180 |
Lesidai dispensary-toilet |
2016/2017 |
Samburu Central |
Loosuk |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/181 |
Lesidai dispensary-staff house |
2018/2019 |
Samburu Central |
Loosuk |
Kshs 3,000,000 |
Kshs 2,750,000 |
Complete
|
| CGS/H/182 |
A MATERNITY BLOCK AT Lesidai DISPENSARY |
2020/2021 |
Samburu Central |
Loosuk |
Kshs 3,000,000 |
Kshs 2,153,080 |
Complete
|
| CGS/H/183 |
Loiragai Dispensary |
2014/2015 |
Samburu Central |
Loosuk |
Kshs 5,000,000 |
Kshs 4,683,464 |
Complete
|
| CGS/H/184 |
Lolkunono Dispensary |
2023/2024 |
Samburu Central |
Loosuk |
Kshs 5,000,000 |
Kshs 4,683,464 |
Complete
|
| CGS/H/185 |
LKUNONO MATERNITY BLOCK |
2018/2019 |
Samburu Central |
Loosuk |
Kshs 5,000,000 |
Kshs 4,990,995 |
Complete
|
| CGS/H/186 |
FENCING WORKS AT LOLKUNONO DISPENSARIES |
2015/2016 |
Samburu Central |
Loosuk |
Kshs 700,000 |
Kshs 510,595 |
Complete
|
| CGS/H/187 |
Loosuk Health Centre inpatient Ward Block |
2013/2014 |
Samburu Central |
Loosuk |
Kshs 4,000,000 |
Kshs 3,600,000 |
Complete
|
| CGS/H/188 |
Constriction of Laboratory |
2022/2023 |
Samburu Central |
Loosuk |
Kshs 3,000,000 |
Kshs 2,750,000 |
Complete
|
| CGS/H/189 |
Pura dispensary and 2 door pit latrine |
2017/2018 |
Samburu Central |
Loosuk |
Kshs 5,000,000 |
Kshs 3,966,200 |
Complete
|
| CGS/H/190 |
Pura dispensary staffhouse |
2018/2019 |
Samburu Central |
Loosuk |
Kshs 3,000,000 |
Kshs 2,750,000 |
Complete
|
| CGS/H/191 |
Pura dispensary-maternity |
2013/2014 |
Samburu Central |
Loosuk |
Kshs 5,000,000 |
Kshs 4,500,000 |
Complete
|
| CGS/H/192 |
Pura dispensary-fencing |
2017/2018 |
Samburu Central |
Loosuk |
Kshs 700,000 |
Kshs 687,000 |
Complete
|
| CGS/H/193 |
Anderi dispensary |
2022/2023 |
Samburu North |
Nyiro |
Kshs 2,000,000 |
Kshs 1,776,870 |
Complete
|
| CGS/H/194 |
Anderi staff house |
2022/2023 |
Samburu North |
Nyiro |
Kshs 3,000,000 |
Kshs 2,800,000 |
Complete
|
| CGS/H/195 |
Anderi pit latrine |
2016/2017 |
Samburu North |
Nyiro |
Kshs 700,000 |
Kshs 635,450 |
Complete
|
| CGS/H/196 |
Loonjorin staff house |
2022/2023 |
Samburu North |
Nyiro |
Kshs 1,000,000 |
Kshs 953,393 |
Complete
|
| CGS/H/197 |
Loonjorin dispensary |
2013/2014 |
Samburu North |
Nyiro |
Kshs 5,000,000 |
Kshs 4,683,464 |
Complete
|
| CGS/H/198 |
Loonjorin pit latrine |
2022/2023 |
Samburu North |
Nyiro |
Kshs 700,000 |
Kshs 687,105 |
Complete
|
| CGS/H/202 |
Simale dispensaryOPD block |
2019/2020 |
Samburu North |
Nyiro |
Kshs 10,000,000 |
Kshs 3,717,854 |
Complete
|
| CGS/H/203 |
Simale staff house |
2013/2014 |
Samburu North |
Nyiro |
Kshs 3,000,000 |
Kshs 2,800,000 |
Complete
|
| CGS/H/204 |
Simale dispensary fence |
2023/2024 |
Samburu North |
Nyiro |
Kshs 700,000 |
Kshs 635,450 |
Complete
|
| CGS/H/205 |
South horr health centreOPD Block |
2018/2019 |
Samburu North |
Nyiro |
Kshs 7,296,530 |
Kshs 4,683,464 |
Complete
|
| CGS/H/206 |
South horr health centre toilets |
2023/2024 |
Samburu North |
Nyiro |
Kshs 700,000 |
Kshs 635,450 |
Complete
|
| CGS/H/207 |
Tuum dispensaryOPD block |
2023/2024 |
Samburu North |
Nyiro |
Kshs 6,561,100 |
Kshs 6,871,050 |
Complete
|
| CGS/H/209 |
Tuum dispesansary fence |
2019/2020 |
Samburu North |
Nyiro |
Kshs 700,000 |
Kshs 635,450 |
Complete
|
| CGS/H/210 |
Tuum pit latrrine |
2016/2017 |
Samburu North |
Nyiro |
Kshs 656,110 |
Kshs 687,105 |
Complete
|
| CGS/H/211 |
Waso Rongai Dispensary opd block |
2017/2018 |
Samburu North |
Nyiro |
Kshs 1,500,000 |
Kshs 2,600,819 |
Complete
|
| CGS/H/212 |
Waso Rongai dispensary fence |
2017/2018 |
Samburu North |
Nyiro |
Kshs 700,000 |
Kshs 635,450 |
Complete
|
| CGS/H/213 |
Waso Rongai toilets |
2018/2019 |
Samburu North |
Nyiro |
Kshs 700,000 |
Kshs 635,450 |
Complete
|
| CGS/H/214 |
Waso Rongai maternity |
2019/2020 |
Samburu North |
Nyiro |
Kshs 5,000,000 |
Kshs 4,683,464 |
Complete
|
| CGS/H/215 |
Angata nanyekie dispensary |
2015/2016 |
Samburu North |
Angata Nanyukie |
Kshs 3,500,000 |
Kshs 3,245,850 |
Complete
|
| CGS/H/216 |
Angata nanyekie Martenity |
2016/2017 |
Samburu North |
Angata Nanyukie |
Kshs 6,000,000 |
Kshs 4,595,220 |
Complete
|
| CGS/H/217 |
Construction of Angata nanyekie staff House |
2015/2016 |
Samburu North |
Angata Nanyukie |
Kshs 3,000,000 |
Kshs 2,990,670 |
Complete
|
| CGS/H/218 |
fencing work at Angata nanyieke dispensary |
2019/2020 |
Samburu North |
Angata Nanyukie |
Kshs 1,600,000 |
Kshs 1,572,725 |
Complete
|
| CGS/H/219 |
Provision of water extension to Maternity at Angata Nanyokie |
2020/2021 |
Samburu North |
Angata Nanyukie |
Kshs 2,000,000 |
Kshs 18,756,400 |
Complete
|
| CGS/H/220 |
Barsaloi OPD Block |
2023/2024 |
Samburu North |
Angata Nanyukie |
Kshs 9,800,000 |
Kshs 9,782,090 |
Complete
|
| CGS/H/221 |
Barsaloi opd block fence |
2014/2015 |
Samburu North |
Angata Nanyukie |
Kshs 700,000 |
Kshs 675,000 |
Complete
|
| CGS/H/222 |
Barsaloi opd block maternity |
2014/2015 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 4,595,220 |
Complete
|
| CGS/H/223 |
Morijo Health Centre ( OPD, Sanitary Block, Maternity, fence) |
2017/2018 |
Samburu North |
Angata Nanyukie |
Kshs 10,000,000 |
Kshs 9,755,861 |
Complete
|
| CGS/H/224 |
Nkorika dispensary OPD Block |
2015/2016 |
Samburu North |
Angata Nanyukie |
Kshs 4,500,000 |
Kshs 3,851,825 |
Complete
|
| CGS/H/225 |
Maternity wing in Nkrorika |
2014/2015 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 2,985,300 |
Complete
|
| CGS/H/246 |
Muruangai Dispensary staff house |
2014/2015 |
Samburu North |
Baawa |
Kshs 2,500,000 |
Kshs 1,985,750 |
Complete
|
| CGS/H/226 |
Installation of Solar lighting in Nkorika Dispensary |
2023/2024 |
Samburu North |
Angata Nanyukie |
Kshs 500,000 |
Kshs 486,750 |
Complete
|
| CGS/H/227 |
Nkorika dispensary fence |
2015/2016 |
Samburu North |
Angata Nanyukie |
Kshs 700,000 |
Kshs 675,000 |
Complete
|
| CGS/H/228 |
Nkorika dispensary toilets |
2017/2018 |
Samburu North |
Angata Nanyukie |
Kshs 700,000 |
Kshs 675,000 |
Complete
|
| CGS/H/229 |
Marti Health Centre |
2017/2018 |
Samburu North |
Nachola |
Kshs 10,000,000 |
Kshs 9,867,500 |
Complete
|
| CGS/H/230 |
Marti Health Centre staff house |
2022/2023 |
Samburu North |
Nachola |
Kshs 3,500,000 |
Kshs 3,257,500 |
Complete
|
| CGS/H/231 |
Marti Health Centre maternity |
2015/2016 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,675,000 |
Complete
|
| CGS/H/232 |
Marti Health Centre toilet |
2015/2016 |
Samburu North |
Nachola |
Kshs 700,000 |
Kshs 675,650 |
Complete
|
| CGS/H/233 |
Nachola health centre |
2013/2014 |
Samburu North |
Nachola |
Kshs 10,000,000 |
Kshs 9,867,500 |
Complete
|
| CGS/H/234 |
Nachola health centre fence |
2014/2015 |
Samburu North |
Nachola |
Kshs 900,000 |
Kshs 876,350 |
Complete
|
| CGS/H/235 |
Nachola health centre maternity |
2016/2017 |
Samburu North |
Nachola |
Kshs 4,500,000 |
Kshs 4,357,500 |
Complete
|
| CGS/H/236 |
Nachola health centre toilet |
2013/2014 |
Samburu North |
Nachola |
Kshs 700,000 |
Kshs 675,650 |
Complete
|
| CGS/H/237 |
Logetei Health Centre |
2015/2016 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,675,000 |
Complete
|
| CGS/H/238 |
Logetei Health Centre Laboratory |
2022/2023 |
Samburu North |
Nachola |
Kshs 3,000,000 |
Kshs 2,867,500 |
Complete
|
| CGS/H/239 |
Logetei Health Centre maternity |
2013/2014 |
Samburu North |
Nachola |
Kshs 3,500,000 |
Kshs 3,257,500 |
Complete
|
| CGS/H/240 |
Dispensary at lorrok lolmongo (Disp, staff house, latrine and fence) |
2020/2021 |
Samburu North |
Baawa |
Kshs 5,650,000 |
Kshs 5,650,000 |
Complete
|
| CGS/H/241 |
Lchakwai Dispensary |
2020/2021 |
Samburu North |
Baawa |
Kshs 5,000,000 |
Kshs 4,500,000 |
Complete
|
| CGS/H/242 |
Lchakwai Dispensary staff house |
2017/2018 |
Samburu North |
Baawa |
Kshs 2,500,000 |
Kshs 1,985,750 |
Complete
|
| CGS/H/243 |
Lchakwai Dispensary toilet |
2022/2023 |
Samburu North |
Baawa |
Kshs 700,000 |
Kshs 650,000 |
Complete
|
| CGS/H/244 |
Lchakwai Dispensary-Fencing |
2020/2021 |
Samburu North |
Baawa |
Kshs 1,500,000 |
Kshs 1,450,750 |
Complete
|
| CGS/H/245 |
Muruangai Dispensary |
2015/2016 |
Samburu North |
Baawa |
Kshs 5,000,000 |
Kshs 4,500,000 |
Complete
|
| CGS/H/248 |
Muruangai Dispensary toilet |
2015/2016 |
Samburu North |
Baawa |
Kshs 2,333,333 |
Kshs 2,333,333 |
Complete
|
| CGS/H/249 |
Baawa community dispensary |
Funded by CDF |
Samburu North |
Baawa |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/H/250 |
Construction of staff house at Baawa dispensary |
2016/2017 |
Samburu North |
Baawa |
Kshs 1,500,000 |
Kshs 1,450,750 |
Complete
|
| CGS/H/251 |
Naimaralal Dispensary |
2020/2021 |
Samburu North |
Baawa |
Kshs 3,875,000 |
Kshs 3,875,000 |
Complete
|
| CGS/H/252 |
Opiroi Dispensary |
2018/2019 |
Samburu North |
Baawa |
Kshs 5,000,000 |
Kshs 4,008,880 |
Complete
|