| CGS/WEN/164 |
Nkorika borehole |
2015/2016 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 4,707,230 |
Complete
|
| CGS/WEN/165 |
Ntarakwa borehole |
2014/2015 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 4,707,230 |
Condemned
|
| CGS/WEN/166 |
Nkorika borehole |
2021/2022 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 4,707,230 |
Complete
|
| CGS/WEN/167 |
Nkirenyi borehole drilling, equipping and extension |
2014/2015 |
Samburu North |
Angata Nanyukie |
Kshs 3,000,000 |
Kshs 2,987,800 |
Complete
|
| CGS/WEN/168 |
Angata nanyeke borehole |
2017/2018 |
Samburu North |
Angata Nanyukie |
Kshs 6,000,000 |
Kshs 5,280,000 |
Complete
|
| CGS/WEN/169 |
Nkabai borehole |
2021/2022 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 4,849,800 |
Complete
|
| CGS/WEN/170 |
Sapai water extension |
2021/2022 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 4,707,230 |
Complete
|
| CGS/WEN/171 |
Morijo water extension from morijo borehole |
2018/2019 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 4,707,230 |
Complete
|
| CGS/WEN/172 |
Lemudongo borehole and solarisation |
2021/2022 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 4,707,230 |
Vandalised
|
| CGS/WEN/173 |
Morijo borehole and equipping |
2013/2014 |
Samburu North |
Angata Nanyukie |
Kshs 3,000,000 |
Kshs 2,640,000 |
Complete
|
| CGS/WEN/174 |
Drilling and equipping of sapai borehole |
2021/2022 |
Samburu North |
Angata Nanyukie |
Kshs 5,250,000 |
Kshs 4,620,000 |
Complete
|
| CGS/WEN/175 |
Sapai dam |
2015/2016 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 4,774,400 |
Complete
|
| CGS/WEN/176 |
Soit pus borehole lot 2 |
2019/2020 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 4,888,888 |
Complete
|
| CGS/WEN/177 |
Nkabai dam |
2013/2014 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 4,707,230 |
Complete
|
| CGS/WEN/178 |
Baawa water extension lkiloriti |
2015/2016 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,850,000 |
Complete
|
| CGS/WEN/179 |
Baawa water extension lkiloriti |
2016/2017 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,850,000 |
Complete
|
| CGS/WEN/180 |
Baawa borehole water extension lkiloriti no 3 |
2020/2021 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 3,800,000 |
Complete
|
| CGS/WEN/181 |
Lbaa Rongai water pan |
2020/2021 |
Samburu Central |
Lodokejek |
Kshs 11,750,000 |
Kshs 10,116,388 |
Complete
|
| CGS/WEN/182 |
Ngambo borehole lekamanja extension |
2021/2022 |
Samburu Central |
Lodokejek |
Kshs 5,000,000 |
Kshs 4,750,000 |
Complete
|
| CGS/WEN/183 |
Ngambo borehole extension 2 lkilorit dispensary water point |
2017/2018 |
Samburu Central |
Lodokejek |
Kshs 5,000,000 |
Kshs 4,750,000 |
Complete
|
| CGS/WEN/184 |
Ngambo borehole extension 3 |
2016/2017 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 1,267,433 |
Complete
|
| CGS/WEN/185 |
Ngambo water extension 4 ngusoro water point |
2023/2024 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,850,000 |
Complete
|
| CGS/WEN/186 |
Ngambo borehole extension 4 |
2016/2017 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 1,972,071 |
Complete
|
| CGS/WEN/234 |
Leparngojin borehole |
2023/2024 |
Samburu Central |
Porro |
Kshs 5,000,000 |
Kshs 4,315,626 |
Complete
|
| CGS/WEN/235 |
Loruko water extension |
2020/2021 |
Samburu Central |
Porro |
Kshs 1,500,000 |
Kshs 1,521,008 |
Incomplete
|
| CGS/WEN/236 |
Nkokiin borehole |
2015/2016 |
Samburu Central |
Porro |
Kshs 6,000,000 |
Kshs 5,315,626 |
Complete
|
| CGS/WEN/237 |
Nkokiin dam |
2013/2014 |
Samburu Central |
Porro |
Kshs 8,500,000 |
Kshs 7,988,400 |
Complete
|
| CGS/WEN/238 |
Loontorosi borehole |
2019/2020 |
Samburu Central |
Porro |
Kshs 3,000,000 |
Kshs 2,998,360 |
Complete
|
| CGS/WEN/239 |
Loontorosi water extension |
2019/2020 |
Samburu Central |
Porro |
Kshs 2,000,000 |
Kshs 1,987,731 |
Complete
|
| CGS/WEN/240 |
Ndonyo borehole |
2016/2017 |
Samburu Central |
Porro |
Kshs 5,500,000 |
Kshs 4,987,135 |
Complete
|
| CGS/WEN/241 |
Ndonyo water extension |
2020/2021 |
Samburu Central |
Porro |
Kshs 2,000,000 |
Kshs 1,591,300 |
Complete
|
| CGS/WEN/242 |
Sirata oirobi water extension |
2018/2019 |
Samburu Central |
Porro |
Kshs 3,000,000 |
Kshs 2,998,360 |
Complete
|
| CGS/WEN/243 |
Lolkonden borehole |
2018/2019 |
Samburu Central |
Porro |
Kshs 2,500,000 |
Kshs 2,085,810 |
Complete
|
| CGS/WEN/244 |
Lolkonden water extension |
2017/2018 |
Samburu Central |
Porro |
Kshs 2,000,000 |
Kshs 1,919,842 |
Complete
|
| CGS/WEN/245 |
Sere Loikari borehole and solarisation |
2022/2023 |
Samburu Central |
Porro |
Kshs 5,000,000 |
Kshs 4,798,050 |
Complete
|
| CGS/WEN/246 |
Lkurum borehole |
2014/2015 |
Samburu Central |
Porro |
Kshs 5,000,000 |
Kshs 4,798,050 |
Complete
|
| CGS/WEN/247 |
Ntarakwa water extension |
2017/2018 |
Samburu Central |
Porro |
Kshs 1,500,000 |
Kshs 3,567,004 |
Complete
|
| CGS/WEN/248 |
Siambu borehole and solarisation |
2020/2021 |
Samburu Central |
Porro |
Kshs 9,000,000 |
Kshs 8,418,077 |
Complete
|
| CGS/WEN/249 |
Porro to siambu water extension |
2014/2015 |
Samburu Central |
Porro |
Kshs 7,000,000 |
Kshs 6,989,932 |
Complete
|
| CGS/WEN/250 |
Loiting water extension |
2020/2021 |
Samburu Central |
Porro |
Kshs 2,000,000 |
Kshs 1,919,842 |
Complete
|
| CGS/WEN/251 |
Loiting borehole |
2017/2018 |
Samburu Central |
Porro |
Kshs 5,000,000 |
Kshs 4,798,050 |
Complete
|
| CGS/WEN/252 |
Porro to Sawan water extension |
2018/2019 |
Samburu Central |
Porro |
Kshs 2,000,000 |
Kshs 1,591,300 |
Stalled
|
| CGS/WEN/253 |
Noonkukula borehole |
2021/2022 |
Samburu Central |
Porro |
Kshs 5,000,000 |
Kshs 4,798,050 |
Complete
|
| CGS/WEN/254 |
Solarization of Suguta Marmar borehole |
2023/2024 |
Samburu Central |
Suguta |
Kshs 3,000,000 |
Kshs 2,760,900 |
Complete
|
| CGS/WEN/255 |
Suguta marmar water kiosk |
2023/2024 |
Samburu Central |
Suguta |
Kshs 3,000,000 |
Kshs 4,816,875 |
Complete
|
| CGS/WEN/256 |
Suguta dump site |
2023/2024 |
Samburu Central |
Suguta |
Kshs 10,000,000 |
Kshs 9,849,000 |
Incomplete
|
| CGS/WEN/257 |
Saramat borehole |
2018/2019 |
Samburu Central |
Suguta |
Kshs 5,000,000 |
Kshs 4,665,586 |
Complete
|
| CGS/WEN/354 |
Lantanai borehole |
2023/2024 |
Samburu East |
Wamba East |
Kshs 4,000,000 |
Kshs 3,800,000 |
Complete
|
| CGS/WEN/355 |
Ntepes water piping |
2021/2022 |
Samburu East |
Wamba East |
Kshs 6,000,000 |
Kshs 5,700,000 |
Incomplete
|
| CGS/WEN/356 |
Lmarti borehole project |
2020/2021 |
Samburu East |
Wamba East |
Kshs 5,000,000 |
Kshs 4,400,000 |
Complete
|
| CGS/WEN/357 |
Wamba dump site |
2018/2019 |
Samburu East |
Wamba East |
Kshs 3,471,490 |
Kshs 3,054,911 |
Complete
|
| CGS/WEN/358 |
Wamba water system |
2014/2015 |
Samburu East |
Wamba East |
Kshs 3,700,000 |
Kshs 3,515,000 |
Complete
|
| CGS/WEN/359 |
Lkisin borehole |
2021/2022 |
Samburu East |
Wamba East |
Kshs 5,500,000 |
Kshs 4,840,000 |
Complete
|
| CGS/WEN/360 |
Lengarde water extension |
2023/2024 |
Samburu East |
Wamba East |
Kshs 4,200,000 |
Kshs 3,990,000 |
Incomplete
|
| CGS/WEN/361 |
Kupan water pan |
2016/2017 |
Samburu East |
Wamba East |
Kshs 3,670,000 |
Kshs 3,486,500 |
Complete
|
| CGS/WEN/362 |
Lolkuniani borehole |
2019/2020 |
Samburu East |
Wamba East |
Kshs 4,700,000 |
Kshs 4,465,000 |
Complete
|
| CGS/WEN/363 |
Mpagas borehole |
2021/2022 |
Samburu East |
Wamba East |
Kshs 5,500,000 |
Kshs 4,840,000 |
Complete
|
| CGS/WEN/364 |
Lokeresiri borehole |
2016/2017 |
Samburu East |
Wamba East |
Kshs 3,400,000 |
Kshs 3,230,000 |
Vandalised
|
| CGS/WEN/365 |
Solarization and rehabilitation of lengei borehole |
2021/2022 |
Samburu East |
Wamba West |
Kshs 5,500,000 |
Kshs 4,759,700 |
Complete
|
| CGS/WEN/366 |
Lopesewo borehole |
2022/2023 |
Samburu East |
Wamba West |
Kshs 5,500,000 |
Kshs 2,988,930 |
Complete
|
| CGS/WEN/367 |
Tululung rock water catchment |
2017/2018 |
Samburu East |
Wamba West |
Kshs 2,300,000 |
Kshs 2,241,210 |
Complete
|
| CGS/WEN/368 |
Drilling of borehole at lopesiwo |
2022/2023 |
Samburu East |
Wamba West |
Kshs 3,000,000 |
Kshs 3,300,865 |
Incomplete
|
| CGS/WEN/370 |
Ngutuk ngiron borehole |
2021/2022 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 4,414,264 |
Vandalised
|
| CGS/WEN/371 |
Water extension from barsilinga to ndikir |
2023/2024 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 5,181,400 |
Complete
|
| CGS/WEN/372 |
Rehabilitation of barsilinga borehole |
2014/2015 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 4,414,100 |
Complete
|
| CGS/WEN/373 |
Barsilinga water extension to lpus |
2017/2018 |
Samburu East |
Wamba West |
Kshs 2,500,000 |
Kshs 4,372,070 |
Complete
|
| CGS/WEN/374 |
Lpus Sanitation block |
2023/2024 |
Samburu East |
Wamba West |
Kshs 700,000 |
Kshs 684,720 |
Incomplete
|
| CGS/WEN/375 |
Naisunyai borehole |
2018/2019 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 4,630,498 |
Complete
|
| CGS/WEN/376 |
Naisunyai dam |
2017/2018 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 3,932,400 |
Complete
|
| CGS/WEN/377 |
Drilling of naisunyai borehole |
2017/2018 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 4,550,400 |
Stalled
|
| CGS/WEN/378 |
Water extension from ndikir borehole to naisunyai centre |
2018/2019 |
Samburu East |
Wamba West |
Kshs 6,000,000 |
Kshs 5,741,440 |
Complete
|
| CGS/WEN/020 |
Masika water extension |
2014/2015 |
Samburu North |
Elbarta |
Kshs 5,204,280 |
Kshs 3,080,000 |
Complete
|
| CGS/WEN/021 |
Suyian Borehole |
2017/2018 |
Samburu North |
Elbarta |
Kshs 7,000,000 |
Kshs 5,280,000 |
Vandalised
|
| CGS/WEN/022 |
Suyian borehole II |
2015/2016 |
Samburu North |
Elbarta |
Kshs 4,000,000 |
Kshs 4,350,850 |
Vandalised
|
| CGS/WEN/023 |
suyian water kiosk |
2015/2016 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,500,000 |
Vandalised
|
| CGS/WEN/024 |
Masikita water storage |
2013/2014 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 1,500,000 |
Complete
|
| CGS/WEN/025 |
Masikita borehole |
Funded by NGO |
Samburu North |
Elbarta |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/026 |
Masikita water extension |
2013/2014 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,640,000 |
Complete
|
| CGS/WEN/027 |
Silango water extension |
2022/2023 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,640,000 |
Vandalised
|
| CGS/WEN/028 |
Nteremka borehole |
2019/2020 |
Samburu North |
Elbarta |
Kshs 6,000,000 |
Kshs 5,280,000 |
Vandalised
|
| CGS/WEN/029 |
Simiti Borehole 1(Milgis Trust Funded) |
Funded by NGO |
Samburu North |
Elbarta |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/030 |
Simiti water kiosk 1 |
2023/2024 |
Samburu North |
Elbarta |
Kshs 2,000,000 |
Kshs 1,500,000 |
Complete
|
| CGS/WEN/031 |
Simiti Borehole Extension 2 |
2023/2024 |
Samburu North |
Elbarta |
Kshs 5,000,000 |
Kshs 4,400,000 |
Complete
|
| CGS/WEN/032 |
Simiti Borehole Extension 1 |
2023/2024 |
Samburu North |
Elbarta |
Kshs 5,000,000 |
Kshs 4,400,000 |
Complete
|
| CGS/WEN/033 |
Soito Ng'iro |
2023/2024 |
Samburu North |
Elbarta |
Kshs 3,500,000 |
Kshs 2,625,000 |
Complete
|
| CGS/WEN/034 |
Soito Ng'iro Community |
2023/2024 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,500,000 |
Complete
|
| CGS/WEN/035 |
Bendera 2 Borehole water extension |
2021/2022 |
Samburu North |
Elbarta |
Kshs 5,000,000 |
Kshs 3,750,000 |
Complete
|
| CGS/WEN/036 |
Baragoi Dumpsite |
2023/2024 |
Samburu North |
Elbarta |
Kshs 2,000,000 |
Kshs 1,500,000 |
Complete
|
| CGS/WEN/037 |
Soit naibor dam |
Funded by GOK |
Samburu North |
Elbarta |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/038 |
Soit naibor borehole |
2016/2017 |
Samburu North |
Elbarta |
Kshs 6,000,000 |
Kshs 5,280,000 |
Complete
|
| CGS/WEN/039 |
Huruma Borehole |
2019/2020 |
Samburu North |
Elbarta |
Kshs 5,000,000 |
Kshs 3,750,000 |
Complete
|
| CGS/WEN/040 |
Loilei water kiosk |
2022/2023 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,640,000 |
Complete
|
| CGS/WEN/041 |
Mwalimu street water kiosk |
2014/2015 |
Samburu North |
Elbarta |
Kshs 2,000,000 |
Kshs 1,500,000 |
Complete
|
| CGS/WEN/042 |
Police line Water kiosk |
2014/2015 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,640,000 |
Complete
|
| CGS/WEN/043 |
Airstrip Water Pan |
2014/2015 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,500,000 |
Complete
|
| CGS/WEN/141 |
Lailelai Borehole |
Funded by GOK |
Samburu North |
Baawa |
Kshs 0 |
Kshs 0 |
Vandalised
|
| CGS/WEN/142 |
Lturotowua Water Pan |
2023/2024 |
Samburu North |
Baawa |
Kshs 1,000,000 |
Kshs 850,000 |
Complete
|
| CGS/WEN/143 |
Leirr borehole |
2024/2025 |
Samburu North |
Baawa |
Kshs 5,000,000 |
Kshs 4,250,000 |
Complete
|
| CGS/WEN/144 |
Lesepetei water pan |
2020/2021 |
Samburu North |
Baawa |
Kshs 1,000,000 |
Kshs 850,000 |
Complete
|
| CGS/WEN/145 |
Baawa borehole extension |
2020/2021 |
Samburu North |
Baawa |
Kshs 1,500,000 |
Kshs 1,320,000 |
Complete
|
| CGS/WEN/146 |
Baawa borehole |
2013/2014 |
Samburu North |
Baawa |
Kshs 3,000,000 |
Kshs 2,999,090 |
Complete
|
| CGS/WEN/147 |
Baawa dam |
2013/2014 |
Samburu North |
Baawa |
Kshs 4,000,000 |
Kshs 3,425,000 |
Complete
|
| CGS/WEN/148 |
Kirapash Water dam |
2022/2023 |
Samburu North |
Baawa |
Kshs 3,500,000 |
Kshs 3,300,000 |
Complete
|
| CGS/WEN/149 |
Muruankai water pan |
2014/2015 |
Samburu North |
Baawa |
Kshs 1,000,000 |
Kshs 850,000 |
Complete
|
| CGS/WEN/150 |
Muruankai Water Kiosk |
2022/2023 |
Samburu North |
Baawa |
Kshs 1,500,000 |
Kshs 950,000 |
Complete
|
| CGS/WEN/151 |
Opiroi Town Water Kiosk |
2019/2020 |
Samburu North |
Baawa |
Kshs 1,000,000 |
Kshs 850,000 |
Complete
|
| CGS/WEN/152 |
Opiroi reservoir |
2015/2016 |
Samburu North |
Baawa |
Kshs 3,000,000 |
Kshs 2,999,090 |
Complete
|
| CGS/WEN/153 |
Londukeme borehole and water kiosk |
2017/2018 |
Samburu North |
Baawa |
Kshs 2,500,000 |
Kshs 2,392,164 |
Complete
|
| CGS/WEN/154 |
Nomboroi Borehole |
2018/2019 |
Samburu North |
Baawa |
Kshs 5,000,000 |
Kshs 4,250,000 |
Complete
|
| CGS/WEN/155 |
Lpus Borehole |
2018/2019 |
Samburu North |
Angata Nanyukie |
Kshs 3,000,000 |
Kshs 2,640,000 |
Stalled
|
| CGS/WEN/156 |
Lpusi II |
2015/2016 |
Samburu North |
Angata Nanyukie |
Kshs 3,750,000 |
Kshs 3,300,000 |
Stalled
|
| CGS/WEN/157 |
Barsaloi Embakasi village Borehole Extension |
2013/2014 |
Samburu North |
Angata Nanyukie |
Kshs 5,500,000 |
Kshs 4,840,000 |
Vandalised
|
| CGS/WEN/158 |
Barsaloi Water kiosk II |
2021/2022 |
Samburu North |
Angata Nanyukie |
Kshs 3,000,000 |
Kshs 2,987,800 |
Vandalised
|
| CGS/WEN/159 |
Marti Lorian Borehole |
2017/2018 |
Samburu North |
Angata Nanyukie |
Kshs 5,000,000 |
Kshs 4,400,000 |
Complete
|
| CGS/WEN/160 |
Solarization of Barsaloi Borehole and water pumping machine |
2018/2019 |
Samburu North |
Angata Nanyukie |
Kshs 2,000,000 |
Kshs 1,760,000 |
Complete
|
| CGS/WEN/161 |
Lorian-Borehole |
2019/2020 |
Samburu North |
Angata Nanyukie |
Kshs 5,100,000 |
Kshs 4,488,000 |
Complete
|
| CGS/WEN/162 |
Lorian Water Pan |
2020/2021 |
Samburu North |
Angata Nanyukie |
Kshs 3,300,000 |
Kshs 2,904,000 |
Complete
|
| CGS/WEN/163 |
Lulu Irrigation Water Storage Tank |
2015/2016 |
Samburu North |
Angata Nanyukie |
Kshs 750,000 |
Kshs 660,000 |
Complete
|
| CGS/WEN/001 |
Spring water extension |
2021/2022 |
Samburu North |
Nyiro |
Kshs 3,500,000 |
Kshs 3,330,580 |
Complete
|
| CGS/WEN/002 |
Laparan water extension |
2013/2014 |
Samburu North |
Nyiro |
Kshs 4,500,000 |
Kshs 4,372,070 |
Complete
|
| CGS/WEN/003 |
South horr gabions |
2020/2021 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 3,974,700 |
Complete
|
| CGS/WEN/004 |
Jijaa piping system |
2021/2022 |
Samburu North |
Nyiro |
Kshs 2,000,000 |
Kshs 1,914,000 |
Complete
|
| CGS/WEN/005 |
Lparkuoo water reservoir |
2021/2022 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 3,800,000 |
Complete
|
| CGS/WEN/006 |
Ndikir water supply |
2017/2018 |
Samburu North |
Nyiro |
Kshs 3,000,000 |
Kshs 3,749,353 |
Complete
|
| CGS/WEN/007 |
Kurungu water extension from the source tanks |
2020/2021 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 4,934,262 |
Complete
|
| CGS/WEN/008 |
Spring water extension |
2017/2018 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 3,330,580 |
Complete
|
| CGS/WEN/009 |
Loonjorin naole water extension |
2017/2018 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 2,009,436 |
Complete
|
| CGS/WEN/010 |
Seleya water extension |
2020/2021 |
Samburu North |
Nyiro |
Kshs 5,000,000 |
Kshs 2,034,278 |
Vandalised
|
| CGS/WEN/011 |
Simale water extension from simale River to water tank |
2019/2020 |
Samburu North |
Nyiro |
Kshs 5,000,000 |
Kshs 4,750,000 |
Complete
|
| CGS/WEN/012 |
Lauragi water extension |
2023/2024 |
Samburu North |
Nyiro |
Kshs 3,000,000 |
Kshs 3,955,042 |
Complete
|
| CGS/WEN/013 |
Rehabilitation tuum water tanks |
2021/2022 |
Samburu North |
Nyiro |
Kshs 3,000,000 |
Kshs 1,914,000 |
Complete
|
| CGS/WEN/014 |
Sesia water projects and extension |
2016/2017 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 3,800,000 |
Complete
|
| CGS/WEN/015 |
Sumurai water extension from the source and water reservoir |
2013/2014 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 3,922,600 |
Incomplete
|
| CGS/WEN/016 |
Loruko Borehole |
2022/2023 |
Samburu North |
Nyiro |
Kshs 5,000,000 |
Kshs 4,750,000 |
Complete
|
| CGS/WEN/017 |
Loruko water extension |
2023/2024 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 2,415,551 |
Complete
|
| CGS/WEN/018 |
Waso Rongai gabion |
2020/2021 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 3,800,000 |
Complete
|
| CGS/WEN/019 |
Rehabilitation of waso Rongai water system from the source |
2019/2020 |
Samburu North |
Nyiro |
Kshs 4,000,000 |
Kshs 2,371,000 |
Complete
|
| CGS/WEN/044 |
Bendera Borehole 4 |
2022/2023 |
Samburu North |
Elbarta |
Kshs 5,000,000 |
Kshs 3,750,000 |
Complete
|
| CGS/WEN/045 |
Bendera Borehole 1 |
Funded by NGO |
Samburu North |
Elbarta |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/046 |
Bendera 2 Borehole |
Funded by NGO |
Samburu North |
Elbarta |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/047 |
Bendera Borehole 3 |
Funded by GOK |
Samburu North |
Elbarta |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/048 |
Parkishon Borehole Extension |
2023/2024 |
Samburu North |
Elbarta |
Kshs 5,250,000 |
Kshs 4,620,000 |
Complete
|
| CGS/WEN/049 |
Parkishon Borehole |
2023/2024 |
Samburu North |
Elbarta |
Kshs 6,000,000 |
Kshs 5,280,000 |
Complete
|
| CGS/WEN/050 |
Lekudumu dam |
2017/2018 |
Samburu North |
Elbarta |
Kshs 4,500,450 |
Kshs 3,960,396 |
Complete
|
| CGS/WEN/051 |
Mnanda borehole extension |
2019/2020 |
Samburu North |
Elbarta |
Kshs 4,000,000 |
Kshs 3,520,000 |
Complete
|
| CGS/WEN/052 |
Lolgirgir water extension |
2019/2020 |
Samburu North |
Elbarta |
Kshs 4,000,000 |
Kshs 3,520,000 |
Complete
|
| CGS/WEN/053 |
Ngilai water pan |
2015/2016 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,550,000 |
Complete
|
| CGS/WEN/054 |
Ngilai dam |
2016/2017 |
Samburu North |
Elbarta |
Kshs 7,000,000 |
Kshs 6,300,000 |
Complete
|
| CGS/WEN/055 |
Mpagas mega dam |
2023/2024 |
Samburu North |
Elbarta |
Kshs 10,000,000 |
Kshs 8,900,000 |
Ongoing
|
| CGS/WEN/056 |
Lolgirgir water extension |
2015/2016 |
Samburu North |
Elbarta |
Kshs 3,000,000 |
Kshs 2,550,000 |
Complete
|
| CGS/WEN/057 |
Lentabas borehole |
2022/2023 |
Samburu North |
Elbarta |
Kshs 6,000,000 |
Kshs 5,280,000 |
Complete
|
| CGS/WEN/058 |
Masikita simiti water kiosk |
2023/2024 |
Samburu North |
Elbarta |
Kshs 4,000,000 |
Kshs 3,520,000 |
Complete
|
| CGS/WEN/059 |
Masikita simiti borehole |
2016/2017 |
Samburu North |
Elbarta |
Kshs 3,500,000 |
Kshs 2,625,000 |
Complete
|
| CGS/WEN/060 |
parkishon borehole extension |
2014/2015 |
Samburu North |
Elbarta |
Kshs 5,250,000 |
Kshs 4,620,000 |
Complete
|
| CGS/WEN/061 |
Lengima Borehole extension |
2022/2023 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,507,539 |
Complete
|
| CGS/WEN/062 |
Lengima Borehole |
Funded by NGO |
Samburu North |
Nachola |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/063 |
Ateker shallow well water extension |
2023/2024 |
Samburu North |
Nachola |
Kshs 1,500,000 |
Kshs 1,320,000 |
Complete
|
| CGS/WEN/064 |
Nawakim Borehole |
2021/2022 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,507,539 |
Vandalised
|
| CGS/WEN/065 |
Kilepoi Water pan |
2021/2022 |
Samburu North |
Nachola |
Kshs 3,296,530 |
Kshs 3,282,020 |
Stalled
|
| CGS/WEN/066 |
Kilepoi Borehole |
Funded by GOK |
Samburu North |
Nachola |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/067 |
Ateker Shallow wells Extension |
2023/2024 |
Samburu North |
Nachola |
Kshs 3,296,530 |
Kshs 3,282,020 |
Complete
|
| CGS/WEN/068 |
Namalia Water Pan |
2021/2022 |
Samburu North |
Nachola |
Kshs 3,300,000 |
Kshs 3,125,450 |
Incomplete
|
| CGS/WEN/069 |
Natiti borehole water extension |
2021/2022 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,400,000 |
Complete
|
| CGS/WEN/070 |
Logetei Water Kiosk |
2023/2024 |
Samburu North |
Nachola |
Kshs 1,500,000 |
Kshs 950,000 |
Complete
|
| CGS/WEN/071 |
Natiti Borehole |
2023/2024 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,507,539 |
Complete
|
| CGS/WEN/072 |
Totoro Water Kiosk |
2019/2020 |
Samburu North |
Nachola |
Kshs 1,500,000 |
Kshs 950,000 |
Complete
|
| CGS/WEN/073 |
Nachola Well |
Funded by NGO |
Samburu North |
Nachola |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/074 |
Nachola Borehole |
2019/2020 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,507,539 |
Complete
|
| CGS/WEN/075 |
Attan Water Pan |
Funded by GOK |
Samburu North |
Nachola |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/076 |
Ibariin Water Pan |
2013/2014 |
Samburu North |
Nachola |
Kshs 3,300,000 |
Kshs 3,125,450 |
Complete
|
| CGS/WEN/077 |
Theiiya Water Pan |
2020/2021 |
Samburu North |
Nachola |
Kshs 3,500,000 |
Kshs 3,458,485 |
Complete
|
| CGS/WEN/078 |
Loshootom Borehole |
2023/2024 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,507,539 |
Incomplete
|
| CGS/WEN/079 |
Natrukan Borehole |
2019/2020 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,507,539 |
Complete
|
| CGS/WEN/080 |
Merleiya Water Pan |
Funded by GOK |
Samburu North |
Nachola |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/081 |
Mariao |
Funded by GOK |
Samburu North |
Nachola |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/082 |
Lonyang Kamar Water Pan |
2024/2025 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,994,450 |
Complete
|
| CGS/WEN/083 |
Lomirok Borehole 1 water extension |
2023/2024 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,994,450 |
Complete
|
| CGS/WEN/084 |
Lomirok 3 Borehole |
2021/2022 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,994,450 |
Incomplete
|
| CGS/WEN/085 |
Lomirok Borehole 2 Water extension |
2021/2022 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,994,450 |
Vandalised
|
| CGS/WEN/086 |
Lomirok Borehole 2 |
2021/2022 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,507,539 |
Complete
|
| CGS/WEN/087 |
Lomirok 1 Borehole(Rehabilitation) |
2021/2022 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,994,450 |
Complete
|
| CGS/WEN/088 |
Lomirok Borehole Extension |
2023/2024 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,994,450 |
Complete
|
| CGS/WEN/089 |
Lokuto Borehole |
2023/2024 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,507,539 |
Complete
|
| CGS/WEN/090 |
Napak-arang'an Water pan |
2020/2021 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,994,450 |
Complete
|
| CGS/WEN/091 |
Nachola Centre Kiosk |
Funded by NGO |
Samburu North |
Nachola |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/092 |
Nachola Primary Water Tank |
Funded by NGO |
Samburu North |
Nachola |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/093 |
Kampala borehole extension |
2019/2020 |
Samburu North |
Nachola |
Kshs 3,500,000 |
Kshs 3,350,285 |
Complete
|
| CGS/WEN/094 |
Mlima Y |
2021/2022 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,994,450 |
Complete
|
| CGS/WEN/095 |
Soito Kokoyo Water Pan |
2015/2016 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,994,450 |
Complete
|
| CGS/WEN/096 |
Charda Borehole |
2019/2020 |
Samburu North |
Nachola |
Kshs 4,500,000 |
Kshs 3,375,000 |
Complete
|
| CGS/WEN/097 |
Marti Water Pan 1 |
Funded by GOK |
Samburu North |
Nachola |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/098 |
Marti Water Pan |
2019/2020 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,994,450 |
Complete
|
| CGS/WEN/099 |
Marti Borehole |
Funded by GOK |
Samburu North |
Nachola |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/100 |
Mulera Borehole |
Funded by GOK |
Samburu North |
Nachola |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/101 |
Kaichakun Borehole |
Funded by NGO |
Samburu North |
Nachola |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/102 |
Mulera Borehole Extension |
2023/2024 |
Samburu North |
Nachola |
Kshs 3,500,000 |
Kshs 3,350,285 |
Incomplete
|
| CGS/WEN/103 |
Kalele Borehole |
Funded by GOK |
Samburu North |
Nachola |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/104 |
Mbukoi Borehole |
2013/2014 |
Samburu North |
Nachola |
Kshs 5,000,000 |
Kshs 4,994,450 |
Complete
|
| CGS/WEN/105 |
Lemolog borehole |
Funded by GOK |
Samburu North |
Ndooto |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/106 |
Lepiile dam |
2017/2018 |
Samburu North |
Ndooto |
Kshs 5,000,000 |
Kshs 4,964,100 |
Complete
|
| CGS/WEN/107 |
Lesirikan water pan |
2023/2024 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 2,500,235 |
Complete
|
| CGS/WEN/108 |
Keleswa borehole |
Funded by GOK |
Samburu North |
Ndooto |
Kshs 0 |
Kshs 0 |
Vandalised
|
| CGS/WEN/109 |
Keleswa water pan |
2021/2022 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 2,950,850 |
Complete
|
| CGS/WEN/110 |
Keleswa borehole |
2024/2025 |
Samburu North |
Ndooto |
Kshs 5,000,000 |
Kshs 4,950,900 |
Ongoing
|
| CGS/WEN/111 |
Loidongo borehole |
2019/2020 |
Samburu North |
Ndooto |
Kshs 5,000,000 |
Kshs 4,400,000 |
Vandalised
|
| CGS/WEN/112 |
Loruko water extension |
2020/2021 |
Samburu North |
Ndooto |
Kshs 4,000,000 |
Kshs 3,550,450 |
Stalled
|
| CGS/WEN/113 |
Loruko borehole |
2020/2021 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 2,970,200 |
Vandalised
|
| CGS/WEN/114 |
Rsim Masonry tank extension |
2014/2015 |
Samburu North |
Ndooto |
Kshs 8,000,000 |
Kshs 7,500,450 |
Complete
|
| CGS/WEN/115 |
Nguronit community borehole |
Funded by GOK |
Samburu North |
Ndooto |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/116 |
Mpelenkos borehole |
2023/2024 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 2,550,550 |
Complete
|
| CGS/WEN/117 |
Loidong'o Sand dam |
2019/2020 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 2,970,200 |
Complete
|
| CGS/WEN/118 |
Loldepe borehole |
Funded by GOK |
Samburu North |
Ndooto |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/119 |
Loidong'o Dam |
2020/2021 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 2,970,200 |
Complete
|
| CGS/WEN/120 |
Siang'ang rock catchment |
2023/2024 |
Samburu North |
Ndooto |
Kshs 4,000,000 |
Kshs 3,550,450 |
Complete
|
| CGS/WEN/121 |
Lesirkan borehole solarization project |
2019/2020 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 2,953,450 |
Complete
|
| CGS/WEN/122 |
Lesirkan water kiosk |
Funded by NGO |
Samburu North |
Ndooto |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/123 |
Tankar water kiosk |
2017/2018 |
Samburu North |
Ndooto |
Kshs 2,500,000 |
Kshs 2,250,000 |
Complete
|
| CGS/WEN/124 |
Tankar borehole |
2017/2018 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 2,850,500 |
Complete
|
| CGS/WEN/125 |
Tankar Soko water kiosk |
Funded by NGO |
Samburu North |
Ndooto |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/126 |
Tankar soko borehole |
2013/2014 |
Samburu North |
Ndooto |
Kshs 3,000,000 |
Kshs 2,850,500 |
Complete
|
| CGS/WEN/127 |
Laasaen borehole |
2021/2022 |
Samburu North |
Ndooto |
Kshs 4,000,000 |
Kshs 3,550,450 |
Complete
|
| CGS/WEN/128 |
Lechet rock catchment exension |
2021/2022 |
Samburu North |
Ndooto |
Kshs 2,500,000 |
Kshs 2,100,000 |
Complete
|
| CGS/WEN/129 |
Illaut rock catchment |
2017/2018 |
Samburu North |
Ndooto |
Kshs 2,500,000 |
Kshs 2,200,000 |
Complete
|
| CGS/WEN/130 |
Mpatpat borehole |
Funded by GOK |
Samburu North |
Ndooto |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/131 |
Upper kasipo borehole milgis |
Funded by NGO |
Samburu North |
Ndooto |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/132 |
Kasipo borehole |
Funded by GOK |
Samburu North |
Ndooto |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/133 |
Seren borehole |
2015/2016 |
Samburu North |
Ndooto |
Kshs 5,000,000 |
Kshs 4,950,900 |
Complete
|
| CGS/WEN/134 |
Lemolog borehole |
2019/2020 |
Samburu North |
Ndooto |
Kshs 5,000,000 |
Kshs 4,950,500 |
Incomplete
|
| CGS/WEN/135 |
Desilting of lemolog dam |
2020/2021 |
Samburu North |
Ndooto |
Kshs 5,000,000 |
Kshs 4,950,500 |
Complete
|
| CGS/WEN/136 |
Opiroi Town Gabions and terraces |
2022/2023 |
Samburu North |
Baawa |
Kshs 4,000,000 |
Kshs 3,976,980 |
Complete
|
| CGS/WEN/137 |
Tingiria Water kiosk |
2021/2022 |
Samburu North |
Baawa |
Kshs 2,500,000 |
Kshs 2,350,450 |
Complete
|
| CGS/WEN/138 |
Lmanarie Water Kiosk |
2023/2024 |
Samburu North |
Baawa |
Kshs 2,500,000 |
Kshs 2,427,519 |
Complete
|
| CGS/WEN/139 |
Ntepes Borehole |
2023/2024 |
Samburu North |
Baawa |
Kshs 9,000,000 |
Kshs 8,720,856 |
Complete
|
| CGS/WEN/140 |
Naimaralal borehole |
2023/2024 |
Samburu North |
Baawa |
Kshs 4,888,889 |
Kshs 4,409,347 |
Stalled
|
| CGS/WEN/187 |
Ngambo borehole |
2015/2016 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 3,800,000 |
Complete
|
| CGS/WEN/188 |
Ngambo borehole water extension 7 nalepoboo water point |
2018/2019 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,485,796 |
Complete
|
| CGS/WEN/189 |
Lalaingok borehole solarization |
2020/2021 |
Samburu Central |
Lodokejek |
Kshs 5,000,000 |
Kshs 4,750,000 |
Complete
|
| CGS/WEN/190 |
Lkilorit borehole lalaingok water source.. |
2016/2017 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 3,800,000 |
Complete
|
| CGS/WEN/191 |
Loolera borehole |
2021/2022 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 3,800,000 |
Complete
|
| CGS/WEN/192 |
Kisima njorlai borehole extension town |
2021/2022 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 3,800,000 |
Complete
|
| CGS/WEN/193 |
Napipera water extension |
2021/2022 |
Samburu Central |
Lodokejek |
Kshs 5,204,280 |
Kshs 3,824,480 |
Complete
|
| CGS/WEN/194 |
Mparigon water extension |
Funded by NGO |
Samburu Central |
Lodokejek |
Kshs 7,000,000 |
Kshs 0 |
Complete
|
| CGS/WEN/195 |
Mparigon borehole |
Funded by NGO |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 0 |
Complete
|
| CGS/WEN/196 |
Lpetpet borehole extension |
Funded by NGO |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 0 |
Complete
|
| CGS/WEN/197 |
Napipere borehole |
2016/2017 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,850,000 |
Complete
|
| CGS/WEN/198 |
Miyai/Ngamata water extension 2 |
2018/2019 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 2,999,996 |
Complete
|
| CGS/WEN/199 |
Miyai/ ngamata water extention |
2019/2020 |
Samburu Central |
Lodokejek |
Kshs 3,865,500 |
Kshs 3,672,225 |
Complete
|
| CGS/WEN/200 |
Lowua borehole |
Funded by NGO |
Samburu Central |
Lodokejek |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/201 |
Mashini borehole |
2017/2018 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 3,800,000 |
Complete
|
| CGS/WEN/202 |
Loruko borehole |
Funded by GOK |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 0 |
Complete
|
| CGS/WEN/203 |
Mpukani water extension 2 |
2020/2021 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,850,000 |
Complete
|
| CGS/WEN/204 |
Mpukani water extension 1 |
2020/2021 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,850,000 |
Complete
|
| CGS/WEN/205 |
Mpukani borehole |
Funded by NGO |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 0 |
Complete
|
| CGS/WEN/206 |
Ngamata borehole |
2015/2016 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 3,800,000 |
Complete
|
| CGS/WEN/207 |
Miyai borehole |
2015/2016 |
Samburu Central |
Lodokejek |
Kshs 5,000,000 |
Kshs 4,750,000 |
Complete
|
| CGS/WEN/208 |
Garma mugur water supply project |
2023/2024 |
Samburu Central |
Lodokejek |
Kshs 5,000,000 |
Kshs 10,116,388 |
Complete
|
| CGS/WEN/209 |
Loturo borehole |
2020/2021 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,930,018 |
Complete
|
| CGS/WEN/210 |
Ldaranja borehole |
2020/2021 |
Samburu Central |
Lodokejek |
Kshs 3,844,100 |
Kshs 2,041,985 |
Complete
|
| CGS/WEN/211 |
Lodokejek primary school water project |
2013/2014 |
Samburu Central |
Lodokejek |
Kshs 4,000,000 |
Kshs 3,249,106 |
Complete
|
| CGS/WEN/212 |
Lodekejek Catholic mission borehole |
2013/2014 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,850,000 |
Vandalised
|
| CGS/WEN/213 |
Lodekejek primary borehole water extension |
2020/2021 |
Samburu Central |
Lodokejek |
Kshs 3,000,050 |
Kshs 3,249,106 |
Complete
|
| CGS/WEN/214 |
losho borehole |
2016/2017 |
Samburu Central |
Lodokejek |
Kshs 3,750,662 |
Kshs 3,563,129 |
Stalled
|
| CGS/WEN/215 |
Lolmoti borehole |
2024/2025 |
Samburu Central |
Lodokejek |
Kshs 3,000,000 |
Kshs 2,850,000 |
Complete
|
| CGS/WEN/216 |
Kirimon borehole |
2021/2022 |
Samburu Central |
Lodokejek |
Kshs 3,000,050 |
Kshs 2,850,048 |
Complete
|
| CGS/WEN/217 |
Mugur borehole |
2016/2017 |
Samburu Central |
Lodokejek |
Kshs 3,750,662 |
Kshs 3,563,129 |
Complete
|
| CGS/WEN/218 |
Ngano water extension |
2016/2017 |
Samburu Central |
Porro |
Kshs 2,000,000 |
Kshs 1,919,842 |
Complete
|
| CGS/WEN/219 |
Ngano Primary borehole and Solarization |
2016/2017 |
Samburu Central |
Porro |
Kshs 2,500,000 |
Kshs 2,085,810 |
Complete
|
| CGS/WEN/220 |
Sawan borehole |
2017/2018 |
Samburu Central |
Porro |
Kshs 4,200,000 |
Kshs 3,875,790 |
Complete
|
| CGS/WEN/221 |
Sawan borehole |
2023/2024 |
Samburu Central |
Porro |
Kshs 4,200,000 |
Kshs 3,875,790 |
Complete
|
| CGS/WEN/222 |
Drilling and equipping of seketet community borehole |
2017/2018 |
Samburu Central |
Porro |
Kshs 7,000,000 |
Kshs 6,275,940 |
Complete
|
| CGS/WEN/223 |
Nayelle |
2023/2024 |
Samburu Central |
Porro |
Kshs 2,600,000 |
Kshs 2,600,000 |
Complete
|
| CGS/WEN/224 |
Seketet water extension |
2023/2024 |
Samburu Central |
Porro |
Kshs 1,500,000 |
Kshs 1,521,008 |
Stalled
|
| CGS/WEN/225 |
Ltalet water pan project |
2019/2020 |
Samburu Central |
Porro |
Kshs 5,000,000 |
Kshs 4,315,626 |
Complete
|
| CGS/WEN/226 |
Noonkukula water extension |
2017/2018 |
Samburu Central |
Porro |
Kshs 2,000,000 |
Kshs 1,988,400 |
Complete
|
| CGS/WEN/227 |
Porro Gabions |
2019/2020 |
Samburu Central |
Porro |
Kshs 2,600,000 |
Kshs 2,315,626 |
Complete
|
| CGS/WEN/228 |
Porro centre borehole |
2019/2020 |
Samburu Central |
Porro |
Kshs 4,800,000 |
Kshs 4,315,626 |
Complete
|
| CGS/WEN/229 |
Ntachata nantala B borehole |
2022/2023 |
Samburu Central |
Porro |
Kshs 8,000,000 |
Kshs 7,896,380 |
Complete
|
| CGS/WEN/230 |
Ntachata community water pan |
2016/2017 |
Samburu Central |
Porro |
Kshs 5,000,000 |
Kshs 4,315,626 |
Complete
|
| CGS/WEN/231 |
Ntachata borehole |
2014/2015 |
Samburu Central |
Porro |
Kshs 4,000,000 |
Kshs 3,425,000 |
Complete
|
| CGS/WEN/232 |
Porro water extension . |
2014/2015 |
Samburu Central |
Porro |
Kshs 2,000,000 |
Kshs 1,521,008 |
Complete
|
| CGS/WEN/233 |
Loruko Borehole |
2019/2020 |
Samburu Central |
Porro |
Kshs 1,500,000 |
Kshs 1,521,008 |
Complete
|
| CGS/WEN/258 |
Saramat water extension |
2019/2020 |
Samburu Central |
Suguta |
Kshs 4,000,000 |
Kshs 3,790,685 |
Complete
|
| CGS/WEN/259 |
Kao borehole |
2016/2017 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,380,680 |
Complete
|
| CGS/WEN/260 |
Lkitasine borehole |
2016/2017 |
Samburu Central |
Suguta |
Kshs 4,000,000 |
Kshs 3,765,657 |
Complete
|
| CGS/WEN/261 |
Lowa mara water extension |
2023/2024 |
Samburu Central |
Suguta |
Kshs 4,000,000 |
Kshs 3,513,704 |
Incomplete
|
| CGS/WEN/262 |
Ntarakwa dam |
2020/2021 |
Samburu Central |
Suguta |
Kshs 5,000,000 |
Kshs 4,759,700 |
Complete
|
| CGS/WEN/263 |
Angata lerai borehole |
2014/2015 |
Samburu Central |
Suguta |
Kshs 5,500,000 |
Kshs 5,200,000 |
Vandalised
|
| CGS/WEN/264 |
Lmari borehole |
2018/2019 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,109,991 |
Complete
|
| CGS/WEN/265 |
Nkusoro water extension |
2019/2020 |
Samburu Central |
Suguta |
Kshs 2,000,000 |
Kshs 1,971,376 |
Complete
|
| CGS/WEN/266 |
Nkusoro borehole |
2019/2020 |
Samburu Central |
Suguta |
Kshs 2,000,000 |
Kshs 1,778,000 |
Complete
|
| CGS/WEN/267 |
Ang'ata Rongai borehole solarization and piping |
2015/2016 |
Samburu Central |
Suguta |
Kshs 4,500,000 |
Kshs 4,293,200 |
Complete
|
| CGS/WEN/268 |
Lolmolog water extension |
2021/2022 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,498,576 |
Complete
|
| CGS/WEN/269 |
Morpusi |
2021/2022 |
Samburu Central |
Suguta |
Kshs 5,000,000 |
Kshs 4,816,875 |
Complete
|
| CGS/WEN/270 |
Sunoni borehole |
2016/2017 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,495,050 |
Complete
|
| CGS/WEN/271 |
Lorukoti borehole |
2017/2018 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,485,796 |
Complete
|
| CGS/WEN/272 |
Lolkono borehole |
2019/2020 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,486,000 |
Complete
|
| CGS/WEN/273 |
Lchoro le lerai water extension kiosk |
2022/2023 |
Samburu Central |
Suguta |
Kshs 5,500,000 |
Kshs 5,481,600 |
Complete
|
| CGS/WEN/274 |
Longewan centre borehole |
Funded by NGO |
Samburu Central |
Suguta |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/275 |
Loonkoben B. Borehole |
2021/2022 |
Samburu Central |
Suguta |
Kshs 3,000,000 |
Kshs 2,989,980 |
Complete
|
| CGS/WEN/276 |
Loonkoben water pan |
Funded by GOK |
Samburu Central |
Suguta |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/277 |
Loonkoben A borehole |
2016/2017 |
Samburu Central |
Suguta |
Kshs 3,000,000 |
Kshs 2,989,980 |
Complete
|
| CGS/WEN/278 |
Loosuk water extension |
Funded by NGO |
Samburu Central |
Suguta |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/279 |
Lkeek sapuki borehole |
2017/2018 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,099,945 |
Complete
|
| CGS/WEN/280 |
Loibornkare borehole |
Funded by GOK |
Samburu Central |
Suguta |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/281 |
Natala borehole |
2016/2017 |
Samburu Central |
Suguta |
Kshs 4,000,000 |
Kshs 3,824,480 |
Complete
|
| CGS/WEN/282 |
Loiragai dam |
2024/2025 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,149,440 |
Ongoing
|
| CGS/WEN/283 |
Lolmisigiyoi borehole |
2016/2017 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,197,430 |
Complete
|
| CGS/WEN/284 |
Loiragai Borehole |
2015/2016 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,427,519 |
Complete
|
| CGS/WEN/285 |
Loisukutan borehole |
2021/2022 |
Samburu Central |
Suguta |
Kshs 6,000,000 |
Kshs 2,415,551 |
Complete
|
| CGS/WEN/286 |
Lolkunono borehole |
2018/2019 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,380,680 |
Complete
|
| CGS/WEN/287 |
Ng'eriyoi water extension |
2018/2019 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,317,000 |
Complete
|
| CGS/WEN/288 |
Ng'riyoi Borehole |
2018/2019 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,435,100 |
Complete
|
| CGS/WEN/289 |
Pura borehole |
2013/2014 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 1,972,071 |
Complete
|
| CGS/WEN/290 |
Lesidai borehole |
Funded by GOK |
Samburu Central |
Suguta |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/291 |
Moroo borehole |
2018/2019 |
Samburu Central |
Suguta |
Kshs 4,900,000 |
Kshs 4,495,100 |
Complete
|
| CGS/WEN/292 |
Lolng'iro borehole |
2018/2019 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,101,854 |
Complete
|
| CGS/WEN/293 |
Loosuk Health Centre borehole |
2023/2024 |
Samburu Central |
Suguta |
Kshs 9,500,000 |
Kshs 7,180,069 |
Complete
|
| CGS/WEN/294 |
lching'ei borehole |
2022/2023 |
Samburu Central |
Suguta |
Kshs 2,000,000 |
Kshs 1,947,180 |
Complete
|
| CGS/WEN/295 |
Natala borehole |
2017/2018 |
Samburu Central |
Suguta |
Kshs 200,000 |
Kshs 1,868,209 |
Complete
|
| CGS/WEN/296 |
Lching'ei water extension |
2022/2023 |
Samburu Central |
Suguta |
Kshs 3,000,000 |
Kshs 2,987,402 |
Complete
|
| CGS/WEN/297 |
Murua Borehole |
2017/2018 |
Samburu Central |
Suguta |
Kshs 2,500,000 |
Kshs 2,380,680 |
Complete
|
| CGS/WEN/298 |
Lching'ei Alu water extension |
2015/2016 |
Samburu Central |
Suguta |
Kshs 3,000,000 |
Kshs 2,982,978 |
Complete
|
| CGS/WEN/299 |
Lorosoit borehole |
2019/2020 |
Samburu Central |
Suguta |
Kshs 5,000,000 |
Kshs 4,414,264 |
Complete
|
| CGS/WEN/300 |
Sirai Borehole Extension |
2014/2015 |
Samburu Central |
Maralal |
Kshs 2,000,000 |
Kshs 1,999,900 |
Complete
|
| CGS/WEN/301 |
Shabana centre water kiosk |
2014/2015 |
Samburu Central |
Maralal |
Kshs 2,000,000 |
Kshs 1,947,180 |
Complete
|
| CGS/WEN/302 |
Nkutoto-borehole |
2016/2017 |
Samburu Central |
Maralal |
Kshs 3,500,000 |
Kshs 2,965,612 |
Complete
|
| CGS/WEN/303 |
Ndikir Water Kiosk |
2014/2015 |
Samburu Central |
Maralal |
Kshs 2,000,000 |
Kshs 1,591,300 |
Complete
|
| CGS/WEN/304 |
Lowua Loolngiro dam |
2024/2025 |
Samburu Central |
Maralal |
Kshs 5,000,000 |
Kshs 4,798,050 |
Complete
|
| CGS/WEN/305 |
County Executive Borehole |
2018/2019 |
Samburu Central |
Maralal |
Kshs 5,000,000 |
Kshs 4,315,626 |
Complete
|
| CGS/WEN/306 |
Laakarn muramur borehole |
2024/2025 |
Samburu Central |
Maralal |
Kshs 5,000,000 |
Kshs 4,992,750 |
Complete
|
| CGS/WEN/307 |
Loruko community borehole |
Funded by GOK |
Samburu Central |
Maralal |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/308 |
Morijoi Water Pan |
Funded by GOK |
Samburu Central |
Maralal |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/309 |
Ngari borehole II |
2018/2019 |
Samburu Central |
Maralal |
Kshs 4,500,000 |
Kshs 4,410,351 |
Complete
|
| CGS/WEN/310 |
Kulapesa Water Kiosk |
2024/2025 |
Samburu Central |
Maralal |
Kshs 2,500,000 |
Kshs 2,145,600 |
Complete
|
| CGS/WEN/311 |
Ngari water pan |
2024/2025 |
Samburu Central |
Maralal |
Kshs 5,000,000 |
Kshs 4,648,950 |
Complete
|
| CGS/WEN/312 |
Ngari Borehole I and water kiosk |
2024/2025 |
Samburu Central |
Maralal |
Kshs 4,500,000 |
Kshs 4,410,351 |
Complete
|
| CGS/WEN/313 |
Ngari borehole and water Kiosk |
2016/2017 |
Samburu Central |
Maralal |
Kshs 4,500,000 |
Kshs 4,410,351 |
Complete
|
| CGS/WEN/314 |
Tamiyoi Borehole |
2020/2021 |
Samburu Central |
Maralal |
Kshs 6,000,000 |
Kshs 5,645,000 |
Complete
|
| CGS/WEN/315 |
Sawaco Milimani water extension |
2018/2019 |
Samburu Central |
Maralal |
Kshs 3,000,000 |
Kshs 2,272,396 |
Complete
|
| CGS/WEN/316 |
Ndikir e lekiraya water extension |
2020/2021 |
Samburu Central |
Maralal |
Kshs 3,000,000 |
Kshs 2,272,396 |
Complete
|
| CGS/WEN/317 |
Mililani borehole |
2018/2019 |
Samburu Central |
Maralal |
Kshs 4,000,000 |
Kshs 3,577,902 |
Complete
|
| CGS/WEN/318 |
Sawaco water extension |
2017/2018 |
Samburu Central |
Maralal |
Kshs 3,000,000 |
Kshs 2,985,500 |
Complete
|
| CGS/WEN/319 |
Lporos borehole |
2016/2017 |
Samburu Central |
Maralal |
Kshs 5,000,000 |
Kshs 4,315,626 |
Complete
|
| CGS/WEN/320 |
Ledero Nalepo dam |
2019/2020 |
Samburu Central |
Maralal |
Kshs 5,000,000 |
Kshs 4,980,100 |
Complete
|
| CGS/WEN/321 |
Lchoro borehole |
Funded by GOK |
Samburu Central |
Maralal |
Kshs 0 |
Kshs 0 |
Complete
|
| CGS/WEN/322 |
Reten borehole |
2014/2015 |
Samburu Central |
Maralal |
Kshs 3,500,000 |
Kshs 3,208,333 |
Complete
|
| CGS/WEN/323 |
Lkidiloto dam |
2020/2021 |
Samburu Central |
Maralal |
Kshs 5,000,000 |
Kshs 4,583,333 |
Complete
|
| CGS/WEN/324 |
Loonyionyi water extension |
2013/2014 |
Samburu Central |
Maralal |
Kshs 2,000,000 |
Kshs 1,833,333 |
Complete
|
| CGS/WEN/325 |
Loonyionyi borehole |
2014/2015 |
Samburu Central |
Maralal |
Kshs 4,500,000 |
Kshs 4,125,000 |
Stalled
|
| CGS/WEN/326 |
Loonyionyi |
2014/2015 |
Samburu Central |
Maralal |
Kshs 4,500,000 |
Kshs 4,125,000 |
Complete
|
| CGS/WEN/327 |
Logos mawaso water extension |
2018/2019 |
Samburu Central |
Maralal |
Kshs 2,000,000 |
Kshs 1,833,333 |
Vandalised
|
| CGS/WEN/328 |
Logos borehole |
2016/2017 |
Samburu Central |
Maralal |
Kshs 10,000,000 |
Kshs 7,896,380 |
Complete
|
| CGS/WEN/329 |
Archers post water supply_ water Tank and perimeter wall |
2019/2020 |
Samburu East |
waso |
Kshs 7,500,000 |
Kshs 9,701,390 |
Complete
|
| CGS/WEN/330 |
Huruma water kiosk |
2021/2022 |
Samburu East |
waso |
Kshs 2,000,000 |
Kshs 1,750,000 |
Stalled
|
| CGS/WEN/331 |
Ndonyo Wasin Water Project |
2017/2018 |
Samburu East |
waso |
Kshs 5,000,000 |
Kshs 4,375,000 |
Complete
|
| CGS/WEN/332 |
Nagida village water tank |
2019/2020 |
Samburu East |
waso |
Kshs 700,000 |
Kshs 612,500 |
Stalled
|
| CGS/WEN/333 |
Triton Water project |
2021/2022 |
Samburu East |
waso |
Kshs 5,000,000 |
Kshs 4,375,000 |
Stalled
|
| CGS/WEN/334 |
Jerusalemu Water Kiosk |
2021/2022 |
Samburu East |
waso |
Kshs 1,500,000 |
Kshs 1,312,500 |
Complete
|
| CGS/WEN/335 |
Ldergesi A-Water Kiosk and Tank |
2021/2022 |
Samburu East |
waso |
Kshs 1,000,000 |
Kshs 875,000 |
Complete
|
| CGS/WEN/336 |
Ldergesi D. -Water Tower |
2021/2022 |
Samburu East |
waso |
Kshs 2,500,000 |
Kshs 2,187,500 |
Complete
|
| CGS/WEN/337 |
Rapunye-Water Kiosk |
2021/2022 |
Samburu East |
waso |
Kshs 2,000,000 |
Kshs 1,750,000 |
Complete
|
| CGS/WEN/338 |
Archers Post Nairobi Village Tank II |
2020/2021 |
Samburu East |
waso |
Kshs 7,500,000 |
Kshs 9,701,390 |
Complete
|
| CGS/WEN/339 |
Archers Post Nairobi Village -Water Tank |
2020/2021 |
Samburu East |
waso |
Kshs 7,500,000 |
Kshs 9,701,390 |
Vandalised
|
| CGS/WEN/340 |
Nakwamor -Borehole |
2020/2021 |
Samburu East |
waso |
Kshs 2,500,000 |
Kshs 2,187,500 |
Vandalised
|
| CGS/WEN/341 |
Archers Post-Dump site |
2017/2018 |
Samburu East |
waso |
Kshs 3,500,000 |
Kshs 3,617,310 |
Complete
|
| CGS/WEN/342 |
Lokiria-Borehole |
2022/2023 |
Samburu East |
waso |
Kshs 5,000,000 |
Kshs 4,375,000 |
Complete
|
| CGS/WEN/343 |
Laresoro- Lechoorion'g Water Pan |
2019/2020 |
Samburu East |
waso |
Kshs 3,000,000 |
Kshs 2,625,000 |
Complete
|
| CGS/WEN/344 |
Laresoro-Lechoorion'g Borehole |
2023/2024 |
Samburu East |
waso |
Kshs 9,000,000 |
Kshs 4,626,272 |
Complete
|
| CGS/WEN/345 |
Laresoro Water Kiosk II |
2020/2021 |
Samburu East |
waso |
Kshs 2,000,000 |
Kshs 1,750,000 |
Complete
|
| CGS/WEN/346 |
Laresoro Water Kiosk |
2020/2021 |
Samburu East |
waso |
Kshs 2,000,000 |
Kshs 1,750,000 |
Complete
|
| CGS/WEN/347 |
Nandandapo Water Pan |
2019/2020 |
Samburu East |
waso |
Kshs 5,000,000 |
Kshs 4,375,000 |
Incomplete
|
| CGS/WEN/348 |
Laresoro Sand dam |
2019/2020 |
Samburu East |
waso |
Kshs 5,000,000 |
Kshs 4,375,000 |
Complete
|
| CGS/WEN/349 |
Lkitembe/Ntilal Water Pan |
2018/2019 |
Samburu East |
waso |
Kshs 2,500,000 |
Kshs 2,187,500 |
Complete
|
| CGS/WEN/350 |
Lerate B Sand Dam |
2021/2022 |
Samburu East |
waso |
Kshs 3,000,000 |
Kshs 2,975,000 |
Vandalised
|
| CGS/WEN/351 |
Sere Olipi Water Project |
2023/2024 |
Samburu East |
waso |
Kshs 5,000,000 |
Kshs 4,375,000 |
Stalled
|
| CGS/WEN/352 |
Lerate B-Dam |
2014/2015 |
Samburu East |
waso |
Kshs 5,000,000 |
Kshs 4,375,000 |
Complete
|
| CGS/WEN/353 |
Loipi water pan |
2021/2022 |
Samburu East |
Wamba East |
Kshs 2,500,000 |
Kshs 2,200,000 |
Complete
|
| CGS/WEN/379 |
Loijuk borehole |
2015/2016 |
Samburu East |
Wamba West |
Kshs 3,000,000 |
Kshs 2,846,432 |
Complete
|
| CGS/WEN/380 |
Loijuk 2 borehole |
2016/2017 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 4,630,498 |
Complete
|
| CGS/WEN/381 |
Lpusi leluai water extension |
2023/2024 |
Samburu East |
Wamba West |
Kshs 1,200,000 |
Kshs 1,046,882 |
Incomplete
|
| CGS/WEN/382 |
Lempaute borehole |
2017/2018 |
Samburu East |
Wamba West |
Kshs 5,000,000 |
Kshs 4,592,852 |
Complete
|
| CGS/WEN/383 |
Sukuroi borehole |
2016/2017 |
Samburu East |
Wamba West |
Kshs 4,630,498 |
Kshs 4,414,264 |
Complete
|
| CGS/WEN/384 |
Lekupe rock water catchment |
2014/2015 |
Samburu East |
Wamba West |
Kshs 2,000,000 |
Kshs 2,000,000 |
Complete
|
| CGS/WEN/385 |
Nkutuk elmuget mega water project |
2023/2024 |
Samburu East |
Wamba West |
Kshs 4,150,000 |
Kshs 3,942,500 |
Incomplete
|
| CGS/WEN/386 |
Drilling of Lmooli borehole |
2020/2021 |
Samburu East |
Wamba West |
Kshs 3,000,000 |
Kshs 2,498,576 |
Complete
|
| CGS/WEN/387 |
Resim sand dam |
Funded by NGO |
Samburu East |
Wamba West |
Kshs 0 |
Kshs 0 |
Incomplete
|
| CGS/WEN/388 |
Silango nanyekie borehole |
2017/2018 |
Samburu East |
Wamba West |
Kshs 6,000,000 |
Kshs 4,414,264 |
Complete
|
| CGS/WEN/389 |
Nkiseu borehole |
2017/2018 |
Samburu East |
Wamba West |
Kshs 6,000,000 |
Kshs 5,611,816 |
Vandalised
|
| CGS/WEN/390 |
Remote borehole |
2018/2019 |
Samburu East |
Wamba West |
Kshs 4,000,000 |
Kshs 3,224,000 |
Stalled
|
| CGS/WEN/391 |
Marti epareu borehole |
2015/2016 |
Samburu East |
Wamba North |
Kshs 6,000,000 |
Kshs 5,870,000 |
Complete
|
| CGS/WEN/392 |
Nchok sand dam |
2019/2020 |
Samburu East |
Wamba North |
Kshs 3,000,000 |
Kshs 2,788,000 |
Complete
|
| CGS/WEN/393 |
Nchok land rehabilitation and restoration site |
2021/2022 |
Samburu East |
Wamba North |
Kshs 1,500,000 |
Kshs 1,337,050 |
Complete
|
| CGS/WEN/394 |
Nchok borehole 2 |
2017/2018 |
Samburu East |
Wamba North |
Kshs 3,500,000 |
Kshs 2,860,109 |
Vandalised
|
| CGS/WEN/395 |
Nchok borehole |
2019/2020 |
Samburu East |
Wamba North |
Kshs 3,500,000 |
Kshs 2,860,109 |
Complete
|
| CGS/WEN/396 |
Nolotoro borehole |
2020/2021 |
Samburu East |
Wamba North |
Kshs 3,000,000 |
Kshs 2,498,576 |
Complete
|
| CGS/WEN/397 |
Nolotoro water pan |
2019/2020 |
Samburu East |
Wamba North |
Kshs 3,000,000 |
Kshs 2,765,657 |
Complete
|
| CGS/WEN/398 |
Lmarmarroi borehole(leparashao) |
2019/2020 |
Samburu East |
Wamba North |
Kshs 5,500,000 |
Kshs 4,961,197 |
Complete
|
| CGS/WEN/399 |
Sirata le Murit borehole |
2016/2017 |
Samburu East |
Wamba North |
Kshs 5,250,000 |
Kshs 5,080,113 |
Complete
|
| CGS/WEN/400 |
Mantasian borehole |
2018/2019 |
Samburu East |
Wamba North |
Kshs 3,000,000 |
Kshs 2,958,000 |
Complete
|
| CGS/WEN/401 |
Ngilai_Ndikir rehabilitation site |
2018/2019 |
Samburu East |
Wamba North |
Kshs 3,500,000 |
Kshs 3,384,283 |
Complete
|
| CGS/WEN/402 |
Ndikir nanyekie borehole 1 |
2021/2022 |
Samburu East |
Wamba North |
Kshs 5,500,000 |
Kshs 4,282,133 |
Incomplete
|
| CGS/WEN/403 |
Ndikir nanyekie borehole 2 |
2022/2023 |
Samburu East |
Wamba North |
Kshs 5,500,000 |
Kshs 4,282,133 |
Vandalised
|
| CGS/WEN/404 |
Nadooto borehole |
2021/2022 |
Samburu East |
Wamba North |
Kshs 2,500,000 |
Kshs 2,241,210 |
Complete
|
| CGS/WEN/405 |
Lorok onyokie water pan |
2021/2022 |
Samburu East |
Wamba North |
Kshs 5,500,000 |
Kshs 4,961,197 |
Complete
|
| CGS/WEN/406 |
Swari water extension |
2018/2019 |
Samburu East |
Wamba North |
Kshs 2,500,000 |
Kshs 2,241,210 |
Complete
|
| CGS/WEN/407 |
Nairimirimo water extension |
2021/2022 |
Samburu East |
Wamba North |
Kshs 5,000,000 |
Kshs 5,029,020 |
Complete
|
| CGS/WEN/408 |
Nairimirimo borehole |
2020/2021 |
Samburu East |
Wamba North |
Kshs 3,600,000 |
Kshs 6,012,000 |
Complete
|
| CGS/WEN/409 |
Raraiti borehole |
2021/2022 |
Samburu East |
Wamba North |
Kshs 3,000,000 |
Kshs 2,958,000 |
Complete
|
| CGS/WEN/410 |
Mabati borehole |
2017/2018 |
Samburu East |
Wamba North |
Kshs 2,500,000 |
Kshs 2,384,283 |
Complete
|
| CGS/WEN/411 |
Mabati rock catchment |
2018/2019 |
Samburu East |
Wamba North |
Kshs 1,000,000 |
Kshs 968,168 |
Complete
|
| CGS/WEN/412 |
Lteroi borehole |
2021/2022 |
Samburu East |
Wamba North |
Kshs 5,500,000 |
Kshs 4,961,197 |
Complete
|