All Projects 411 projects
Total Budget

Kshs 1,478,273,971

Total Actual

Kshs 1,336,721,665

Utilization

90.4%

Variance

Kshs 141,552,306

Project List
Project No. Project Name Financial Year Sub-County Ward Budget (KSh) Actual (KSh) Status
CGS/WEN/164 Nkorika borehole 2015/2016 Samburu North Angata Nanyukie Kshs 5,000,000 Kshs 4,707,230 Complete
CGS/WEN/165 Ntarakwa borehole 2014/2015 Samburu North Angata Nanyukie Kshs 5,000,000 Kshs 4,707,230 Condemned
CGS/WEN/166 Nkorika borehole 2021/2022 Samburu North Angata Nanyukie Kshs 5,000,000 Kshs 4,707,230 Complete
CGS/WEN/167 Nkirenyi borehole drilling, equipping and extension 2014/2015 Samburu North Angata Nanyukie Kshs 3,000,000 Kshs 2,987,800 Complete
CGS/WEN/168 Angata nanyeke borehole 2017/2018 Samburu North Angata Nanyukie Kshs 6,000,000 Kshs 5,280,000 Complete
CGS/WEN/169 Nkabai borehole 2021/2022 Samburu North Angata Nanyukie Kshs 5,000,000 Kshs 4,849,800 Complete
CGS/WEN/170 Sapai water extension 2021/2022 Samburu North Angata Nanyukie Kshs 5,000,000 Kshs 4,707,230 Complete
CGS/WEN/171 Morijo water extension from morijo borehole 2018/2019 Samburu North Angata Nanyukie Kshs 5,000,000 Kshs 4,707,230 Complete
CGS/WEN/172 Lemudongo borehole and solarisation 2021/2022 Samburu North Angata Nanyukie Kshs 5,000,000 Kshs 4,707,230 Vandalised
CGS/WEN/173 Morijo borehole and equipping 2013/2014 Samburu North Angata Nanyukie Kshs 3,000,000 Kshs 2,640,000 Complete
CGS/WEN/174 Drilling and equipping of sapai borehole 2021/2022 Samburu North Angata Nanyukie Kshs 5,250,000 Kshs 4,620,000 Complete
CGS/WEN/175 Sapai dam 2015/2016 Samburu North Angata Nanyukie Kshs 5,000,000 Kshs 4,774,400 Complete
CGS/WEN/176 Soit pus borehole lot 2 2019/2020 Samburu North Angata Nanyukie Kshs 5,000,000 Kshs 4,888,888 Complete
CGS/WEN/177 Nkabai dam 2013/2014 Samburu North Angata Nanyukie Kshs 5,000,000 Kshs 4,707,230 Complete
CGS/WEN/178 Baawa water extension lkiloriti 2015/2016 Samburu Central Lodokejek Kshs 3,000,000 Kshs 2,850,000 Complete
CGS/WEN/179 Baawa water extension lkiloriti 2016/2017 Samburu Central Lodokejek Kshs 3,000,000 Kshs 2,850,000 Complete
CGS/WEN/180 Baawa borehole water extension lkiloriti no 3 2020/2021 Samburu Central Lodokejek Kshs 4,000,000 Kshs 3,800,000 Complete
CGS/WEN/181 Lbaa Rongai water pan 2020/2021 Samburu Central Lodokejek Kshs 11,750,000 Kshs 10,116,388 Complete
CGS/WEN/182 Ngambo borehole lekamanja extension 2021/2022 Samburu Central Lodokejek Kshs 5,000,000 Kshs 4,750,000 Complete
CGS/WEN/183 Ngambo borehole extension 2 lkilorit dispensary water point 2017/2018 Samburu Central Lodokejek Kshs 5,000,000 Kshs 4,750,000 Complete
CGS/WEN/184 Ngambo borehole extension 3 2016/2017 Samburu Central Lodokejek Kshs 3,000,000 Kshs 1,267,433 Complete
CGS/WEN/185 Ngambo water extension 4 ngusoro water point 2023/2024 Samburu Central Lodokejek Kshs 3,000,000 Kshs 2,850,000 Complete
CGS/WEN/186 Ngambo borehole extension 4 2016/2017 Samburu Central Lodokejek Kshs 4,000,000 Kshs 1,972,071 Complete
CGS/WEN/234 Leparngojin borehole 2023/2024 Samburu Central Porro Kshs 5,000,000 Kshs 4,315,626 Complete
CGS/WEN/235 Loruko water extension 2020/2021 Samburu Central Porro Kshs 1,500,000 Kshs 1,521,008 Incomplete
CGS/WEN/236 Nkokiin borehole 2015/2016 Samburu Central Porro Kshs 6,000,000 Kshs 5,315,626 Complete
CGS/WEN/237 Nkokiin dam 2013/2014 Samburu Central Porro Kshs 8,500,000 Kshs 7,988,400 Complete
CGS/WEN/238 Loontorosi borehole 2019/2020 Samburu Central Porro Kshs 3,000,000 Kshs 2,998,360 Complete
CGS/WEN/239 Loontorosi water extension 2019/2020 Samburu Central Porro Kshs 2,000,000 Kshs 1,987,731 Complete
CGS/WEN/240 Ndonyo borehole 2016/2017 Samburu Central Porro Kshs 5,500,000 Kshs 4,987,135 Complete
CGS/WEN/241 Ndonyo water extension 2020/2021 Samburu Central Porro Kshs 2,000,000 Kshs 1,591,300 Complete
CGS/WEN/242 Sirata oirobi water extension 2018/2019 Samburu Central Porro Kshs 3,000,000 Kshs 2,998,360 Complete
CGS/WEN/243 Lolkonden borehole 2018/2019 Samburu Central Porro Kshs 2,500,000 Kshs 2,085,810 Complete
CGS/WEN/244 Lolkonden water extension 2017/2018 Samburu Central Porro Kshs 2,000,000 Kshs 1,919,842 Complete
CGS/WEN/245 Sere Loikari borehole and solarisation 2022/2023 Samburu Central Porro Kshs 5,000,000 Kshs 4,798,050 Complete
CGS/WEN/246 Lkurum borehole 2014/2015 Samburu Central Porro Kshs 5,000,000 Kshs 4,798,050 Complete
CGS/WEN/247 Ntarakwa water extension 2017/2018 Samburu Central Porro Kshs 1,500,000 Kshs 3,567,004 Complete
CGS/WEN/248 Siambu borehole and solarisation 2020/2021 Samburu Central Porro Kshs 9,000,000 Kshs 8,418,077 Complete
CGS/WEN/249 Porro to siambu water extension 2014/2015 Samburu Central Porro Kshs 7,000,000 Kshs 6,989,932 Complete
CGS/WEN/250 Loiting water extension 2020/2021 Samburu Central Porro Kshs 2,000,000 Kshs 1,919,842 Complete
CGS/WEN/251 Loiting borehole 2017/2018 Samburu Central Porro Kshs 5,000,000 Kshs 4,798,050 Complete
CGS/WEN/252 Porro to Sawan water extension 2018/2019 Samburu Central Porro Kshs 2,000,000 Kshs 1,591,300 Stalled
CGS/WEN/253 Noonkukula borehole 2021/2022 Samburu Central Porro Kshs 5,000,000 Kshs 4,798,050 Complete
CGS/WEN/254 Solarization of Suguta Marmar borehole 2023/2024 Samburu Central Suguta Kshs 3,000,000 Kshs 2,760,900 Complete
CGS/WEN/255 Suguta marmar water kiosk 2023/2024 Samburu Central Suguta Kshs 3,000,000 Kshs 4,816,875 Complete
CGS/WEN/256 Suguta dump site 2023/2024 Samburu Central Suguta Kshs 10,000,000 Kshs 9,849,000 Incomplete
CGS/WEN/257 Saramat borehole 2018/2019 Samburu Central Suguta Kshs 5,000,000 Kshs 4,665,586 Complete
CGS/WEN/354 Lantanai borehole 2023/2024 Samburu East Wamba East Kshs 4,000,000 Kshs 3,800,000 Complete
CGS/WEN/355 Ntepes water piping 2021/2022 Samburu East Wamba East Kshs 6,000,000 Kshs 5,700,000 Incomplete
CGS/WEN/356 Lmarti borehole project 2020/2021 Samburu East Wamba East Kshs 5,000,000 Kshs 4,400,000 Complete
CGS/WEN/357 Wamba dump site 2018/2019 Samburu East Wamba East Kshs 3,471,490 Kshs 3,054,911 Complete
CGS/WEN/358 Wamba water system 2014/2015 Samburu East Wamba East Kshs 3,700,000 Kshs 3,515,000 Complete
CGS/WEN/359 Lkisin borehole 2021/2022 Samburu East Wamba East Kshs 5,500,000 Kshs 4,840,000 Complete
CGS/WEN/360 Lengarde water extension 2023/2024 Samburu East Wamba East Kshs 4,200,000 Kshs 3,990,000 Incomplete
CGS/WEN/361 Kupan water pan 2016/2017 Samburu East Wamba East Kshs 3,670,000 Kshs 3,486,500 Complete
CGS/WEN/362 Lolkuniani borehole 2019/2020 Samburu East Wamba East Kshs 4,700,000 Kshs 4,465,000 Complete
CGS/WEN/363 Mpagas borehole 2021/2022 Samburu East Wamba East Kshs 5,500,000 Kshs 4,840,000 Complete
CGS/WEN/364 Lokeresiri borehole 2016/2017 Samburu East Wamba East Kshs 3,400,000 Kshs 3,230,000 Vandalised
CGS/WEN/365 Solarization and rehabilitation of lengei borehole 2021/2022 Samburu East Wamba West Kshs 5,500,000 Kshs 4,759,700 Complete
CGS/WEN/366 Lopesewo borehole 2022/2023 Samburu East Wamba West Kshs 5,500,000 Kshs 2,988,930 Complete
CGS/WEN/367 Tululung rock water catchment 2017/2018 Samburu East Wamba West Kshs 2,300,000 Kshs 2,241,210 Complete
CGS/WEN/368 Drilling of borehole at lopesiwo 2022/2023 Samburu East Wamba West Kshs 3,000,000 Kshs 3,300,865 Incomplete
CGS/WEN/370 Ngutuk ngiron borehole 2021/2022 Samburu East Wamba West Kshs 5,000,000 Kshs 4,414,264 Vandalised
CGS/WEN/371 Water extension from barsilinga to ndikir 2023/2024 Samburu East Wamba West Kshs 5,000,000 Kshs 5,181,400 Complete
CGS/WEN/372 Rehabilitation of barsilinga borehole 2014/2015 Samburu East Wamba West Kshs 5,000,000 Kshs 4,414,100 Complete
CGS/WEN/373 Barsilinga water extension to lpus 2017/2018 Samburu East Wamba West Kshs 2,500,000 Kshs 4,372,070 Complete
CGS/WEN/374 Lpus Sanitation block 2023/2024 Samburu East Wamba West Kshs 700,000 Kshs 684,720 Incomplete
CGS/WEN/375 Naisunyai borehole 2018/2019 Samburu East Wamba West Kshs 5,000,000 Kshs 4,630,498 Complete
CGS/WEN/376 Naisunyai dam 2017/2018 Samburu East Wamba West Kshs 5,000,000 Kshs 3,932,400 Complete
CGS/WEN/377 Drilling of naisunyai borehole 2017/2018 Samburu East Wamba West Kshs 5,000,000 Kshs 4,550,400 Stalled
CGS/WEN/378 Water extension from ndikir borehole to naisunyai centre 2018/2019 Samburu East Wamba West Kshs 6,000,000 Kshs 5,741,440 Complete
CGS/WEN/020 Masika water extension 2014/2015 Samburu North Elbarta Kshs 5,204,280 Kshs 3,080,000 Complete
CGS/WEN/021 Suyian Borehole 2017/2018 Samburu North Elbarta Kshs 7,000,000 Kshs 5,280,000 Vandalised
CGS/WEN/022 Suyian borehole II 2015/2016 Samburu North Elbarta Kshs 4,000,000 Kshs 4,350,850 Vandalised
CGS/WEN/023 suyian water kiosk 2015/2016 Samburu North Elbarta Kshs 3,000,000 Kshs 2,500,000 Vandalised
CGS/WEN/024 Masikita water storage 2013/2014 Samburu North Elbarta Kshs 3,000,000 Kshs 1,500,000 Complete
CGS/WEN/025 Masikita borehole Funded by NGO Samburu North Elbarta Kshs 0 Kshs 0 Complete
CGS/WEN/026 Masikita water extension 2013/2014 Samburu North Elbarta Kshs 3,000,000 Kshs 2,640,000 Complete
CGS/WEN/027 Silango water extension 2022/2023 Samburu North Elbarta Kshs 3,000,000 Kshs 2,640,000 Vandalised
CGS/WEN/028 Nteremka borehole 2019/2020 Samburu North Elbarta Kshs 6,000,000 Kshs 5,280,000 Vandalised
CGS/WEN/029 Simiti Borehole 1(Milgis Trust Funded) Funded by NGO Samburu North Elbarta Kshs 0 Kshs 0 Complete
CGS/WEN/030 Simiti water kiosk 1 2023/2024 Samburu North Elbarta Kshs 2,000,000 Kshs 1,500,000 Complete
CGS/WEN/031 Simiti Borehole Extension 2 2023/2024 Samburu North Elbarta Kshs 5,000,000 Kshs 4,400,000 Complete
CGS/WEN/032 Simiti Borehole Extension 1 2023/2024 Samburu North Elbarta Kshs 5,000,000 Kshs 4,400,000 Complete
CGS/WEN/033 Soito Ng'iro 2023/2024 Samburu North Elbarta Kshs 3,500,000 Kshs 2,625,000 Complete
CGS/WEN/034 Soito Ng'iro Community 2023/2024 Samburu North Elbarta Kshs 3,000,000 Kshs 2,500,000 Complete
CGS/WEN/035 Bendera 2 Borehole water extension 2021/2022 Samburu North Elbarta Kshs 5,000,000 Kshs 3,750,000 Complete
CGS/WEN/036 Baragoi Dumpsite 2023/2024 Samburu North Elbarta Kshs 2,000,000 Kshs 1,500,000 Complete
CGS/WEN/037 Soit naibor dam Funded by GOK Samburu North Elbarta Kshs 0 Kshs 0 Complete
CGS/WEN/038 Soit naibor borehole 2016/2017 Samburu North Elbarta Kshs 6,000,000 Kshs 5,280,000 Complete
CGS/WEN/039 Huruma Borehole 2019/2020 Samburu North Elbarta Kshs 5,000,000 Kshs 3,750,000 Complete
CGS/WEN/040 Loilei water kiosk 2022/2023 Samburu North Elbarta Kshs 3,000,000 Kshs 2,640,000 Complete
CGS/WEN/041 Mwalimu street water kiosk 2014/2015 Samburu North Elbarta Kshs 2,000,000 Kshs 1,500,000 Complete
CGS/WEN/042 Police line Water kiosk 2014/2015 Samburu North Elbarta Kshs 3,000,000 Kshs 2,640,000 Complete
CGS/WEN/043 Airstrip Water Pan 2014/2015 Samburu North Elbarta Kshs 3,000,000 Kshs 2,500,000 Complete
CGS/WEN/141 Lailelai Borehole Funded by GOK Samburu North Baawa Kshs 0 Kshs 0 Vandalised
CGS/WEN/142 Lturotowua Water Pan 2023/2024 Samburu North Baawa Kshs 1,000,000 Kshs 850,000 Complete
CGS/WEN/143 Leirr borehole 2024/2025 Samburu North Baawa Kshs 5,000,000 Kshs 4,250,000 Complete
CGS/WEN/144 Lesepetei water pan 2020/2021 Samburu North Baawa Kshs 1,000,000 Kshs 850,000 Complete
CGS/WEN/145 Baawa borehole extension 2020/2021 Samburu North Baawa Kshs 1,500,000 Kshs 1,320,000 Complete
CGS/WEN/146 Baawa borehole 2013/2014 Samburu North Baawa Kshs 3,000,000 Kshs 2,999,090 Complete
CGS/WEN/147 Baawa dam 2013/2014 Samburu North Baawa Kshs 4,000,000 Kshs 3,425,000 Complete
CGS/WEN/148 Kirapash Water dam 2022/2023 Samburu North Baawa Kshs 3,500,000 Kshs 3,300,000 Complete
CGS/WEN/149 Muruankai water pan 2014/2015 Samburu North Baawa Kshs 1,000,000 Kshs 850,000 Complete
CGS/WEN/150 Muruankai Water Kiosk 2022/2023 Samburu North Baawa Kshs 1,500,000 Kshs 950,000 Complete
CGS/WEN/151 Opiroi Town Water Kiosk 2019/2020 Samburu North Baawa Kshs 1,000,000 Kshs 850,000 Complete
CGS/WEN/152 Opiroi reservoir 2015/2016 Samburu North Baawa Kshs 3,000,000 Kshs 2,999,090 Complete
CGS/WEN/153 Londukeme borehole and water kiosk 2017/2018 Samburu North Baawa Kshs 2,500,000 Kshs 2,392,164 Complete
CGS/WEN/154 Nomboroi Borehole 2018/2019 Samburu North Baawa Kshs 5,000,000 Kshs 4,250,000 Complete
CGS/WEN/155 Lpus Borehole 2018/2019 Samburu North Angata Nanyukie Kshs 3,000,000 Kshs 2,640,000 Stalled
CGS/WEN/156 Lpusi II 2015/2016 Samburu North Angata Nanyukie Kshs 3,750,000 Kshs 3,300,000 Stalled
CGS/WEN/157 Barsaloi Embakasi village Borehole Extension 2013/2014 Samburu North Angata Nanyukie Kshs 5,500,000 Kshs 4,840,000 Vandalised
CGS/WEN/158 Barsaloi Water kiosk II 2021/2022 Samburu North Angata Nanyukie Kshs 3,000,000 Kshs 2,987,800 Vandalised
CGS/WEN/159 Marti Lorian Borehole 2017/2018 Samburu North Angata Nanyukie Kshs 5,000,000 Kshs 4,400,000 Complete
CGS/WEN/160 Solarization of Barsaloi Borehole and water pumping machine 2018/2019 Samburu North Angata Nanyukie Kshs 2,000,000 Kshs 1,760,000 Complete
CGS/WEN/161 Lorian-Borehole 2019/2020 Samburu North Angata Nanyukie Kshs 5,100,000 Kshs 4,488,000 Complete
CGS/WEN/162 Lorian Water Pan 2020/2021 Samburu North Angata Nanyukie Kshs 3,300,000 Kshs 2,904,000 Complete
CGS/WEN/163 Lulu Irrigation Water Storage Tank 2015/2016 Samburu North Angata Nanyukie Kshs 750,000 Kshs 660,000 Complete
CGS/WEN/001 Spring water extension 2021/2022 Samburu North Nyiro Kshs 3,500,000 Kshs 3,330,580 Complete
CGS/WEN/002 Laparan water extension 2013/2014 Samburu North Nyiro Kshs 4,500,000 Kshs 4,372,070 Complete
CGS/WEN/003 South horr gabions 2020/2021 Samburu North Nyiro Kshs 4,000,000 Kshs 3,974,700 Complete
CGS/WEN/004 Jijaa piping system 2021/2022 Samburu North Nyiro Kshs 2,000,000 Kshs 1,914,000 Complete
CGS/WEN/005 Lparkuoo water reservoir 2021/2022 Samburu North Nyiro Kshs 4,000,000 Kshs 3,800,000 Complete
CGS/WEN/006 Ndikir water supply 2017/2018 Samburu North Nyiro Kshs 3,000,000 Kshs 3,749,353 Complete
CGS/WEN/007 Kurungu water extension from the source tanks 2020/2021 Samburu North Nyiro Kshs 4,000,000 Kshs 4,934,262 Complete
CGS/WEN/008 Spring water extension 2017/2018 Samburu North Nyiro Kshs 4,000,000 Kshs 3,330,580 Complete
CGS/WEN/009 Loonjorin naole water extension 2017/2018 Samburu North Nyiro Kshs 4,000,000 Kshs 2,009,436 Complete
CGS/WEN/010 Seleya water extension 2020/2021 Samburu North Nyiro Kshs 5,000,000 Kshs 2,034,278 Vandalised
CGS/WEN/011 Simale water extension from simale River to water tank 2019/2020 Samburu North Nyiro Kshs 5,000,000 Kshs 4,750,000 Complete
CGS/WEN/012 Lauragi water extension 2023/2024 Samburu North Nyiro Kshs 3,000,000 Kshs 3,955,042 Complete
CGS/WEN/013 Rehabilitation tuum water tanks 2021/2022 Samburu North Nyiro Kshs 3,000,000 Kshs 1,914,000 Complete
CGS/WEN/014 Sesia water projects and extension 2016/2017 Samburu North Nyiro Kshs 4,000,000 Kshs 3,800,000 Complete
CGS/WEN/015 Sumurai water extension from the source and water reservoir 2013/2014 Samburu North Nyiro Kshs 4,000,000 Kshs 3,922,600 Incomplete
CGS/WEN/016 Loruko Borehole 2022/2023 Samburu North Nyiro Kshs 5,000,000 Kshs 4,750,000 Complete
CGS/WEN/017 Loruko water extension 2023/2024 Samburu North Nyiro Kshs 4,000,000 Kshs 2,415,551 Complete
CGS/WEN/018 Waso Rongai gabion 2020/2021 Samburu North Nyiro Kshs 4,000,000 Kshs 3,800,000 Complete
CGS/WEN/019 Rehabilitation of waso Rongai water system from the source 2019/2020 Samburu North Nyiro Kshs 4,000,000 Kshs 2,371,000 Complete
CGS/WEN/044 Bendera Borehole 4 2022/2023 Samburu North Elbarta Kshs 5,000,000 Kshs 3,750,000 Complete
CGS/WEN/045 Bendera Borehole 1 Funded by NGO Samburu North Elbarta Kshs 0 Kshs 0 Complete
CGS/WEN/046 Bendera 2 Borehole Funded by NGO Samburu North Elbarta Kshs 0 Kshs 0 Complete
CGS/WEN/047 Bendera Borehole 3 Funded by GOK Samburu North Elbarta Kshs 0 Kshs 0 Complete
CGS/WEN/048 Parkishon Borehole Extension 2023/2024 Samburu North Elbarta Kshs 5,250,000 Kshs 4,620,000 Complete
CGS/WEN/049 Parkishon Borehole 2023/2024 Samburu North Elbarta Kshs 6,000,000 Kshs 5,280,000 Complete
CGS/WEN/050 Lekudumu dam 2017/2018 Samburu North Elbarta Kshs 4,500,450 Kshs 3,960,396 Complete
CGS/WEN/051 Mnanda borehole extension 2019/2020 Samburu North Elbarta Kshs 4,000,000 Kshs 3,520,000 Complete
CGS/WEN/052 Lolgirgir water extension 2019/2020 Samburu North Elbarta Kshs 4,000,000 Kshs 3,520,000 Complete
CGS/WEN/053 Ngilai water pan 2015/2016 Samburu North Elbarta Kshs 3,000,000 Kshs 2,550,000 Complete
CGS/WEN/054 Ngilai dam 2016/2017 Samburu North Elbarta Kshs 7,000,000 Kshs 6,300,000 Complete
CGS/WEN/055 Mpagas mega dam 2023/2024 Samburu North Elbarta Kshs 10,000,000 Kshs 8,900,000 Ongoing
CGS/WEN/056 Lolgirgir water extension 2015/2016 Samburu North Elbarta Kshs 3,000,000 Kshs 2,550,000 Complete
CGS/WEN/057 Lentabas borehole 2022/2023 Samburu North Elbarta Kshs 6,000,000 Kshs 5,280,000 Complete
CGS/WEN/058 Masikita simiti water kiosk 2023/2024 Samburu North Elbarta Kshs 4,000,000 Kshs 3,520,000 Complete
CGS/WEN/059 Masikita simiti borehole 2016/2017 Samburu North Elbarta Kshs 3,500,000 Kshs 2,625,000 Complete
CGS/WEN/060 parkishon borehole extension 2014/2015 Samburu North Elbarta Kshs 5,250,000 Kshs 4,620,000 Complete
CGS/WEN/061 Lengima Borehole extension 2022/2023 Samburu North Nachola Kshs 5,000,000 Kshs 4,507,539 Complete
CGS/WEN/062 Lengima Borehole Funded by NGO Samburu North Nachola Kshs 0 Kshs 0 Complete
CGS/WEN/063 Ateker shallow well water extension 2023/2024 Samburu North Nachola Kshs 1,500,000 Kshs 1,320,000 Complete
CGS/WEN/064 Nawakim Borehole 2021/2022 Samburu North Nachola Kshs 5,000,000 Kshs 4,507,539 Vandalised
CGS/WEN/065 Kilepoi Water pan 2021/2022 Samburu North Nachola Kshs 3,296,530 Kshs 3,282,020 Stalled
CGS/WEN/066 Kilepoi Borehole Funded by GOK Samburu North Nachola Kshs 0 Kshs 0 Complete
CGS/WEN/067 Ateker Shallow wells Extension 2023/2024 Samburu North Nachola Kshs 3,296,530 Kshs 3,282,020 Complete
CGS/WEN/068 Namalia Water Pan 2021/2022 Samburu North Nachola Kshs 3,300,000 Kshs 3,125,450 Incomplete
CGS/WEN/069 Natiti borehole water extension 2021/2022 Samburu North Nachola Kshs 5,000,000 Kshs 4,400,000 Complete
CGS/WEN/070 Logetei Water Kiosk 2023/2024 Samburu North Nachola Kshs 1,500,000 Kshs 950,000 Complete
CGS/WEN/071 Natiti Borehole 2023/2024 Samburu North Nachola Kshs 5,000,000 Kshs 4,507,539 Complete
CGS/WEN/072 Totoro Water Kiosk 2019/2020 Samburu North Nachola Kshs 1,500,000 Kshs 950,000 Complete
CGS/WEN/073 Nachola Well Funded by NGO Samburu North Nachola Kshs 0 Kshs 0 Complete
CGS/WEN/074 Nachola Borehole 2019/2020 Samburu North Nachola Kshs 5,000,000 Kshs 4,507,539 Complete
CGS/WEN/075 Attan Water Pan Funded by GOK Samburu North Nachola Kshs 0 Kshs 0 Complete
CGS/WEN/076 Ibariin Water Pan 2013/2014 Samburu North Nachola Kshs 3,300,000 Kshs 3,125,450 Complete
CGS/WEN/077 Theiiya Water Pan 2020/2021 Samburu North Nachola Kshs 3,500,000 Kshs 3,458,485 Complete
CGS/WEN/078 Loshootom Borehole 2023/2024 Samburu North Nachola Kshs 5,000,000 Kshs 4,507,539 Incomplete
CGS/WEN/079 Natrukan Borehole 2019/2020 Samburu North Nachola Kshs 5,000,000 Kshs 4,507,539 Complete
CGS/WEN/080 Merleiya Water Pan Funded by GOK Samburu North Nachola Kshs 0 Kshs 0 Complete
CGS/WEN/081 Mariao Funded by GOK Samburu North Nachola Kshs 0 Kshs 0 Complete
CGS/WEN/082 Lonyang Kamar Water Pan 2024/2025 Samburu North Nachola Kshs 5,000,000 Kshs 4,994,450 Complete
CGS/WEN/083 Lomirok Borehole 1 water extension 2023/2024 Samburu North Nachola Kshs 5,000,000 Kshs 4,994,450 Complete
CGS/WEN/084 Lomirok 3 Borehole 2021/2022 Samburu North Nachola Kshs 5,000,000 Kshs 4,994,450 Incomplete
CGS/WEN/085 Lomirok Borehole 2 Water extension 2021/2022 Samburu North Nachola Kshs 5,000,000 Kshs 4,994,450 Vandalised
CGS/WEN/086 Lomirok Borehole 2 2021/2022 Samburu North Nachola Kshs 5,000,000 Kshs 4,507,539 Complete
CGS/WEN/087 Lomirok 1 Borehole(Rehabilitation) 2021/2022 Samburu North Nachola Kshs 5,000,000 Kshs 4,994,450 Complete
CGS/WEN/088 Lomirok Borehole Extension 2023/2024 Samburu North Nachola Kshs 5,000,000 Kshs 4,994,450 Complete
CGS/WEN/089 Lokuto Borehole 2023/2024 Samburu North Nachola Kshs 5,000,000 Kshs 4,507,539 Complete
CGS/WEN/090 Napak-arang'an Water pan 2020/2021 Samburu North Nachola Kshs 5,000,000 Kshs 4,994,450 Complete
CGS/WEN/091 Nachola Centre Kiosk Funded by NGO Samburu North Nachola Kshs 0 Kshs 0 Complete
CGS/WEN/092 Nachola Primary Water Tank Funded by NGO Samburu North Nachola Kshs 0 Kshs 0 Complete
CGS/WEN/093 Kampala borehole extension 2019/2020 Samburu North Nachola Kshs 3,500,000 Kshs 3,350,285 Complete
CGS/WEN/094 Mlima Y 2021/2022 Samburu North Nachola Kshs 5,000,000 Kshs 4,994,450 Complete
CGS/WEN/095 Soito Kokoyo Water Pan 2015/2016 Samburu North Nachola Kshs 5,000,000 Kshs 4,994,450 Complete
CGS/WEN/096 Charda Borehole 2019/2020 Samburu North Nachola Kshs 4,500,000 Kshs 3,375,000 Complete
CGS/WEN/097 Marti Water Pan 1 Funded by GOK Samburu North Nachola Kshs 0 Kshs 0 Complete
CGS/WEN/098 Marti Water Pan 2019/2020 Samburu North Nachola Kshs 5,000,000 Kshs 4,994,450 Complete
CGS/WEN/099 Marti Borehole Funded by GOK Samburu North Nachola Kshs 0 Kshs 0 Complete
CGS/WEN/100 Mulera Borehole Funded by GOK Samburu North Nachola Kshs 0 Kshs 0 Complete
CGS/WEN/101 Kaichakun Borehole Funded by NGO Samburu North Nachola Kshs 0 Kshs 0 Complete
CGS/WEN/102 Mulera Borehole Extension 2023/2024 Samburu North Nachola Kshs 3,500,000 Kshs 3,350,285 Incomplete
CGS/WEN/103 Kalele Borehole Funded by GOK Samburu North Nachola Kshs 0 Kshs 0 Complete
CGS/WEN/104 Mbukoi Borehole 2013/2014 Samburu North Nachola Kshs 5,000,000 Kshs 4,994,450 Complete
CGS/WEN/105 Lemolog borehole Funded by GOK Samburu North Ndooto Kshs 0 Kshs 0 Complete
CGS/WEN/106 Lepiile dam 2017/2018 Samburu North Ndooto Kshs 5,000,000 Kshs 4,964,100 Complete
CGS/WEN/107 Lesirikan water pan 2023/2024 Samburu North Ndooto Kshs 3,000,000 Kshs 2,500,235 Complete
CGS/WEN/108 Keleswa borehole Funded by GOK Samburu North Ndooto Kshs 0 Kshs 0 Vandalised
CGS/WEN/109 Keleswa water pan 2021/2022 Samburu North Ndooto Kshs 3,000,000 Kshs 2,950,850 Complete
CGS/WEN/110 Keleswa borehole 2024/2025 Samburu North Ndooto Kshs 5,000,000 Kshs 4,950,900 Ongoing
CGS/WEN/111 Loidongo borehole 2019/2020 Samburu North Ndooto Kshs 5,000,000 Kshs 4,400,000 Vandalised
CGS/WEN/112 Loruko water extension 2020/2021 Samburu North Ndooto Kshs 4,000,000 Kshs 3,550,450 Stalled
CGS/WEN/113 Loruko borehole 2020/2021 Samburu North Ndooto Kshs 3,000,000 Kshs 2,970,200 Vandalised
CGS/WEN/114 Rsim Masonry tank extension 2014/2015 Samburu North Ndooto Kshs 8,000,000 Kshs 7,500,450 Complete
CGS/WEN/115 Nguronit community borehole Funded by GOK Samburu North Ndooto Kshs 0 Kshs 0 Complete
CGS/WEN/116 Mpelenkos borehole 2023/2024 Samburu North Ndooto Kshs 3,000,000 Kshs 2,550,550 Complete
CGS/WEN/117 Loidong'o Sand dam 2019/2020 Samburu North Ndooto Kshs 3,000,000 Kshs 2,970,200 Complete
CGS/WEN/118 Loldepe borehole Funded by GOK Samburu North Ndooto Kshs 0 Kshs 0 Complete
CGS/WEN/119 Loidong'o Dam 2020/2021 Samburu North Ndooto Kshs 3,000,000 Kshs 2,970,200 Complete
CGS/WEN/120 Siang'ang rock catchment 2023/2024 Samburu North Ndooto Kshs 4,000,000 Kshs 3,550,450 Complete
CGS/WEN/121 Lesirkan borehole solarization project 2019/2020 Samburu North Ndooto Kshs 3,000,000 Kshs 2,953,450 Complete
CGS/WEN/122 Lesirkan water kiosk Funded by NGO Samburu North Ndooto Kshs 0 Kshs 0 Complete
CGS/WEN/123 Tankar water kiosk 2017/2018 Samburu North Ndooto Kshs 2,500,000 Kshs 2,250,000 Complete
CGS/WEN/124 Tankar borehole 2017/2018 Samburu North Ndooto Kshs 3,000,000 Kshs 2,850,500 Complete
CGS/WEN/125 Tankar Soko water kiosk Funded by NGO Samburu North Ndooto Kshs 0 Kshs 0 Complete
CGS/WEN/126 Tankar soko borehole 2013/2014 Samburu North Ndooto Kshs 3,000,000 Kshs 2,850,500 Complete
CGS/WEN/127 Laasaen borehole 2021/2022 Samburu North Ndooto Kshs 4,000,000 Kshs 3,550,450 Complete
CGS/WEN/128 Lechet rock catchment exension 2021/2022 Samburu North Ndooto Kshs 2,500,000 Kshs 2,100,000 Complete
CGS/WEN/129 Illaut rock catchment 2017/2018 Samburu North Ndooto Kshs 2,500,000 Kshs 2,200,000 Complete
CGS/WEN/130 Mpatpat borehole Funded by GOK Samburu North Ndooto Kshs 0 Kshs 0 Complete
CGS/WEN/131 Upper kasipo borehole milgis Funded by NGO Samburu North Ndooto Kshs 0 Kshs 0 Complete
CGS/WEN/132 Kasipo borehole Funded by GOK Samburu North Ndooto Kshs 0 Kshs 0 Complete
CGS/WEN/133 Seren borehole 2015/2016 Samburu North Ndooto Kshs 5,000,000 Kshs 4,950,900 Complete
CGS/WEN/134 Lemolog borehole 2019/2020 Samburu North Ndooto Kshs 5,000,000 Kshs 4,950,500 Incomplete
CGS/WEN/135 Desilting of lemolog dam 2020/2021 Samburu North Ndooto Kshs 5,000,000 Kshs 4,950,500 Complete
CGS/WEN/136 Opiroi Town Gabions and terraces 2022/2023 Samburu North Baawa Kshs 4,000,000 Kshs 3,976,980 Complete
CGS/WEN/137 Tingiria Water kiosk 2021/2022 Samburu North Baawa Kshs 2,500,000 Kshs 2,350,450 Complete
CGS/WEN/138 Lmanarie Water Kiosk 2023/2024 Samburu North Baawa Kshs 2,500,000 Kshs 2,427,519 Complete
CGS/WEN/139 Ntepes Borehole 2023/2024 Samburu North Baawa Kshs 9,000,000 Kshs 8,720,856 Complete
CGS/WEN/140 Naimaralal borehole 2023/2024 Samburu North Baawa Kshs 4,888,889 Kshs 4,409,347 Stalled
CGS/WEN/187 Ngambo borehole 2015/2016 Samburu Central Lodokejek Kshs 4,000,000 Kshs 3,800,000 Complete
CGS/WEN/188 Ngambo borehole water extension 7 nalepoboo water point 2018/2019 Samburu Central Lodokejek Kshs 3,000,000 Kshs 2,485,796 Complete
CGS/WEN/189 Lalaingok borehole solarization 2020/2021 Samburu Central Lodokejek Kshs 5,000,000 Kshs 4,750,000 Complete
CGS/WEN/190 Lkilorit borehole lalaingok water source.. 2016/2017 Samburu Central Lodokejek Kshs 4,000,000 Kshs 3,800,000 Complete
CGS/WEN/191 Loolera borehole 2021/2022 Samburu Central Lodokejek Kshs 4,000,000 Kshs 3,800,000 Complete
CGS/WEN/192 Kisima njorlai borehole extension town 2021/2022 Samburu Central Lodokejek Kshs 4,000,000 Kshs 3,800,000 Complete
CGS/WEN/193 Napipera water extension 2021/2022 Samburu Central Lodokejek Kshs 5,204,280 Kshs 3,824,480 Complete
CGS/WEN/194 Mparigon water extension Funded by NGO Samburu Central Lodokejek Kshs 7,000,000 Kshs 0 Complete
CGS/WEN/195 Mparigon borehole Funded by NGO Samburu Central Lodokejek Kshs 4,000,000 Kshs 0 Complete
CGS/WEN/196 Lpetpet borehole extension Funded by NGO Samburu Central Lodokejek Kshs 3,000,000 Kshs 0 Complete
CGS/WEN/197 Napipere borehole 2016/2017 Samburu Central Lodokejek Kshs 3,000,000 Kshs 2,850,000 Complete
CGS/WEN/198 Miyai/Ngamata water extension 2 2018/2019 Samburu Central Lodokejek Kshs 4,000,000 Kshs 2,999,996 Complete
CGS/WEN/199 Miyai/ ngamata water extention 2019/2020 Samburu Central Lodokejek Kshs 3,865,500 Kshs 3,672,225 Complete
CGS/WEN/200 Lowua borehole Funded by NGO Samburu Central Lodokejek Kshs 0 Kshs 0 Complete
CGS/WEN/201 Mashini borehole 2017/2018 Samburu Central Lodokejek Kshs 4,000,000 Kshs 3,800,000 Complete
CGS/WEN/202 Loruko borehole Funded by GOK Samburu Central Lodokejek Kshs 4,000,000 Kshs 0 Complete
CGS/WEN/203 Mpukani water extension 2 2020/2021 Samburu Central Lodokejek Kshs 3,000,000 Kshs 2,850,000 Complete
CGS/WEN/204 Mpukani water extension 1 2020/2021 Samburu Central Lodokejek Kshs 3,000,000 Kshs 2,850,000 Complete
CGS/WEN/205 Mpukani borehole Funded by NGO Samburu Central Lodokejek Kshs 4,000,000 Kshs 0 Complete
CGS/WEN/206 Ngamata borehole 2015/2016 Samburu Central Lodokejek Kshs 4,000,000 Kshs 3,800,000 Complete
CGS/WEN/207 Miyai borehole 2015/2016 Samburu Central Lodokejek Kshs 5,000,000 Kshs 4,750,000 Complete
CGS/WEN/208 Garma mugur water supply project 2023/2024 Samburu Central Lodokejek Kshs 5,000,000 Kshs 10,116,388 Complete
CGS/WEN/209 Loturo borehole 2020/2021 Samburu Central Lodokejek Kshs 3,000,000 Kshs 2,930,018 Complete
CGS/WEN/210 Ldaranja borehole 2020/2021 Samburu Central Lodokejek Kshs 3,844,100 Kshs 2,041,985 Complete
CGS/WEN/211 Lodokejek primary school water project 2013/2014 Samburu Central Lodokejek Kshs 4,000,000 Kshs 3,249,106 Complete
CGS/WEN/212 Lodekejek Catholic mission borehole 2013/2014 Samburu Central Lodokejek Kshs 3,000,000 Kshs 2,850,000 Vandalised
CGS/WEN/213 Lodekejek primary borehole water extension 2020/2021 Samburu Central Lodokejek Kshs 3,000,050 Kshs 3,249,106 Complete
CGS/WEN/214 losho borehole 2016/2017 Samburu Central Lodokejek Kshs 3,750,662 Kshs 3,563,129 Stalled
CGS/WEN/215 Lolmoti borehole 2024/2025 Samburu Central Lodokejek Kshs 3,000,000 Kshs 2,850,000 Complete
CGS/WEN/216 Kirimon borehole 2021/2022 Samburu Central Lodokejek Kshs 3,000,050 Kshs 2,850,048 Complete
CGS/WEN/217 Mugur borehole 2016/2017 Samburu Central Lodokejek Kshs 3,750,662 Kshs 3,563,129 Complete
CGS/WEN/218 Ngano water extension 2016/2017 Samburu Central Porro Kshs 2,000,000 Kshs 1,919,842 Complete
CGS/WEN/219 Ngano Primary borehole and Solarization 2016/2017 Samburu Central Porro Kshs 2,500,000 Kshs 2,085,810 Complete
CGS/WEN/220 Sawan borehole 2017/2018 Samburu Central Porro Kshs 4,200,000 Kshs 3,875,790 Complete
CGS/WEN/221 Sawan borehole 2023/2024 Samburu Central Porro Kshs 4,200,000 Kshs 3,875,790 Complete
CGS/WEN/222 Drilling and equipping of seketet community borehole 2017/2018 Samburu Central Porro Kshs 7,000,000 Kshs 6,275,940 Complete
CGS/WEN/223 Nayelle 2023/2024 Samburu Central Porro Kshs 2,600,000 Kshs 2,600,000 Complete
CGS/WEN/224 Seketet water extension 2023/2024 Samburu Central Porro Kshs 1,500,000 Kshs 1,521,008 Stalled
CGS/WEN/225 Ltalet water pan project 2019/2020 Samburu Central Porro Kshs 5,000,000 Kshs 4,315,626 Complete
CGS/WEN/226 Noonkukula water extension 2017/2018 Samburu Central Porro Kshs 2,000,000 Kshs 1,988,400 Complete
CGS/WEN/227 Porro Gabions 2019/2020 Samburu Central Porro Kshs 2,600,000 Kshs 2,315,626 Complete
CGS/WEN/228 Porro centre borehole 2019/2020 Samburu Central Porro Kshs 4,800,000 Kshs 4,315,626 Complete
CGS/WEN/229 Ntachata nantala B borehole 2022/2023 Samburu Central Porro Kshs 8,000,000 Kshs 7,896,380 Complete
CGS/WEN/230 Ntachata community water pan 2016/2017 Samburu Central Porro Kshs 5,000,000 Kshs 4,315,626 Complete
CGS/WEN/231 Ntachata borehole 2014/2015 Samburu Central Porro Kshs 4,000,000 Kshs 3,425,000 Complete
CGS/WEN/232 Porro water extension . 2014/2015 Samburu Central Porro Kshs 2,000,000 Kshs 1,521,008 Complete
CGS/WEN/233 Loruko Borehole 2019/2020 Samburu Central Porro Kshs 1,500,000 Kshs 1,521,008 Complete
CGS/WEN/258 Saramat water extension 2019/2020 Samburu Central Suguta Kshs 4,000,000 Kshs 3,790,685 Complete
CGS/WEN/259 Kao borehole 2016/2017 Samburu Central Suguta Kshs 2,500,000 Kshs 2,380,680 Complete
CGS/WEN/260 Lkitasine borehole 2016/2017 Samburu Central Suguta Kshs 4,000,000 Kshs 3,765,657 Complete
CGS/WEN/261 Lowa mara water extension 2023/2024 Samburu Central Suguta Kshs 4,000,000 Kshs 3,513,704 Incomplete
CGS/WEN/262 Ntarakwa dam 2020/2021 Samburu Central Suguta Kshs 5,000,000 Kshs 4,759,700 Complete
CGS/WEN/263 Angata lerai borehole 2014/2015 Samburu Central Suguta Kshs 5,500,000 Kshs 5,200,000 Vandalised
CGS/WEN/264 Lmari borehole 2018/2019 Samburu Central Suguta Kshs 2,500,000 Kshs 2,109,991 Complete
CGS/WEN/265 Nkusoro water extension 2019/2020 Samburu Central Suguta Kshs 2,000,000 Kshs 1,971,376 Complete
CGS/WEN/266 Nkusoro borehole 2019/2020 Samburu Central Suguta Kshs 2,000,000 Kshs 1,778,000 Complete
CGS/WEN/267 Ang'ata Rongai borehole solarization and piping 2015/2016 Samburu Central Suguta Kshs 4,500,000 Kshs 4,293,200 Complete
CGS/WEN/268 Lolmolog water extension 2021/2022 Samburu Central Suguta Kshs 2,500,000 Kshs 2,498,576 Complete
CGS/WEN/269 Morpusi 2021/2022 Samburu Central Suguta Kshs 5,000,000 Kshs 4,816,875 Complete
CGS/WEN/270 Sunoni borehole 2016/2017 Samburu Central Suguta Kshs 2,500,000 Kshs 2,495,050 Complete
CGS/WEN/271 Lorukoti borehole 2017/2018 Samburu Central Suguta Kshs 2,500,000 Kshs 2,485,796 Complete
CGS/WEN/272 Lolkono borehole 2019/2020 Samburu Central Suguta Kshs 2,500,000 Kshs 2,486,000 Complete
CGS/WEN/273 Lchoro le lerai water extension kiosk 2022/2023 Samburu Central Suguta Kshs 5,500,000 Kshs 5,481,600 Complete
CGS/WEN/274 Longewan centre borehole Funded by NGO Samburu Central Suguta Kshs 0 Kshs 0 Complete
CGS/WEN/275 Loonkoben B. Borehole 2021/2022 Samburu Central Suguta Kshs 3,000,000 Kshs 2,989,980 Complete
CGS/WEN/276 Loonkoben water pan Funded by GOK Samburu Central Suguta Kshs 0 Kshs 0 Complete
CGS/WEN/277 Loonkoben A borehole 2016/2017 Samburu Central Suguta Kshs 3,000,000 Kshs 2,989,980 Complete
CGS/WEN/278 Loosuk water extension Funded by NGO Samburu Central Suguta Kshs 0 Kshs 0 Complete
CGS/WEN/279 Lkeek sapuki borehole 2017/2018 Samburu Central Suguta Kshs 2,500,000 Kshs 2,099,945 Complete
CGS/WEN/280 Loibornkare borehole Funded by GOK Samburu Central Suguta Kshs 0 Kshs 0 Complete
CGS/WEN/281 Natala borehole 2016/2017 Samburu Central Suguta Kshs 4,000,000 Kshs 3,824,480 Complete
CGS/WEN/282 Loiragai dam 2024/2025 Samburu Central Suguta Kshs 2,500,000 Kshs 2,149,440 Ongoing
CGS/WEN/283 Lolmisigiyoi borehole 2016/2017 Samburu Central Suguta Kshs 2,500,000 Kshs 2,197,430 Complete
CGS/WEN/284 Loiragai Borehole 2015/2016 Samburu Central Suguta Kshs 2,500,000 Kshs 2,427,519 Complete
CGS/WEN/285 Loisukutan borehole 2021/2022 Samburu Central Suguta Kshs 6,000,000 Kshs 2,415,551 Complete
CGS/WEN/286 Lolkunono borehole 2018/2019 Samburu Central Suguta Kshs 2,500,000 Kshs 2,380,680 Complete
CGS/WEN/287 Ng'eriyoi water extension 2018/2019 Samburu Central Suguta Kshs 2,500,000 Kshs 2,317,000 Complete
CGS/WEN/288 Ng'riyoi Borehole 2018/2019 Samburu Central Suguta Kshs 2,500,000 Kshs 2,435,100 Complete
CGS/WEN/289 Pura borehole 2013/2014 Samburu Central Suguta Kshs 2,500,000 Kshs 1,972,071 Complete
CGS/WEN/290 Lesidai borehole Funded by GOK Samburu Central Suguta Kshs 0 Kshs 0 Complete
CGS/WEN/291 Moroo borehole 2018/2019 Samburu Central Suguta Kshs 4,900,000 Kshs 4,495,100 Complete
CGS/WEN/292 Lolng'iro borehole 2018/2019 Samburu Central Suguta Kshs 2,500,000 Kshs 2,101,854 Complete
CGS/WEN/293 Loosuk Health Centre borehole 2023/2024 Samburu Central Suguta Kshs 9,500,000 Kshs 7,180,069 Complete
CGS/WEN/294 lching'ei borehole 2022/2023 Samburu Central Suguta Kshs 2,000,000 Kshs 1,947,180 Complete
CGS/WEN/295 Natala borehole 2017/2018 Samburu Central Suguta Kshs 200,000 Kshs 1,868,209 Complete
CGS/WEN/296 Lching'ei water extension 2022/2023 Samburu Central Suguta Kshs 3,000,000 Kshs 2,987,402 Complete
CGS/WEN/297 Murua Borehole 2017/2018 Samburu Central Suguta Kshs 2,500,000 Kshs 2,380,680 Complete
CGS/WEN/298 Lching'ei Alu water extension 2015/2016 Samburu Central Suguta Kshs 3,000,000 Kshs 2,982,978 Complete
CGS/WEN/299 Lorosoit borehole 2019/2020 Samburu Central Suguta Kshs 5,000,000 Kshs 4,414,264 Complete
CGS/WEN/300 Sirai Borehole Extension 2014/2015 Samburu Central Maralal Kshs 2,000,000 Kshs 1,999,900 Complete
CGS/WEN/301 Shabana centre water kiosk 2014/2015 Samburu Central Maralal Kshs 2,000,000 Kshs 1,947,180 Complete
CGS/WEN/302 Nkutoto-borehole 2016/2017 Samburu Central Maralal Kshs 3,500,000 Kshs 2,965,612 Complete
CGS/WEN/303 Ndikir Water Kiosk 2014/2015 Samburu Central Maralal Kshs 2,000,000 Kshs 1,591,300 Complete
CGS/WEN/304 Lowua Loolngiro dam 2024/2025 Samburu Central Maralal Kshs 5,000,000 Kshs 4,798,050 Complete
CGS/WEN/305 County Executive Borehole 2018/2019 Samburu Central Maralal Kshs 5,000,000 Kshs 4,315,626 Complete
CGS/WEN/306 Laakarn muramur borehole 2024/2025 Samburu Central Maralal Kshs 5,000,000 Kshs 4,992,750 Complete
CGS/WEN/307 Loruko community borehole Funded by GOK Samburu Central Maralal Kshs 0 Kshs 0 Complete
CGS/WEN/308 Morijoi Water Pan Funded by GOK Samburu Central Maralal Kshs 0 Kshs 0 Complete
CGS/WEN/309 Ngari borehole II 2018/2019 Samburu Central Maralal Kshs 4,500,000 Kshs 4,410,351 Complete
CGS/WEN/310 Kulapesa Water Kiosk 2024/2025 Samburu Central Maralal Kshs 2,500,000 Kshs 2,145,600 Complete
CGS/WEN/311 Ngari water pan 2024/2025 Samburu Central Maralal Kshs 5,000,000 Kshs 4,648,950 Complete
CGS/WEN/312 Ngari Borehole I and water kiosk 2024/2025 Samburu Central Maralal Kshs 4,500,000 Kshs 4,410,351 Complete
CGS/WEN/313 Ngari borehole and water Kiosk 2016/2017 Samburu Central Maralal Kshs 4,500,000 Kshs 4,410,351 Complete
CGS/WEN/314 Tamiyoi Borehole 2020/2021 Samburu Central Maralal Kshs 6,000,000 Kshs 5,645,000 Complete
CGS/WEN/315 Sawaco Milimani water extension 2018/2019 Samburu Central Maralal Kshs 3,000,000 Kshs 2,272,396 Complete
CGS/WEN/316 Ndikir e lekiraya water extension 2020/2021 Samburu Central Maralal Kshs 3,000,000 Kshs 2,272,396 Complete
CGS/WEN/317 Mililani borehole 2018/2019 Samburu Central Maralal Kshs 4,000,000 Kshs 3,577,902 Complete
CGS/WEN/318 Sawaco water extension 2017/2018 Samburu Central Maralal Kshs 3,000,000 Kshs 2,985,500 Complete
CGS/WEN/319 Lporos borehole 2016/2017 Samburu Central Maralal Kshs 5,000,000 Kshs 4,315,626 Complete
CGS/WEN/320 Ledero Nalepo dam 2019/2020 Samburu Central Maralal Kshs 5,000,000 Kshs 4,980,100 Complete
CGS/WEN/321 Lchoro borehole Funded by GOK Samburu Central Maralal Kshs 0 Kshs 0 Complete
CGS/WEN/322 Reten borehole 2014/2015 Samburu Central Maralal Kshs 3,500,000 Kshs 3,208,333 Complete
CGS/WEN/323 Lkidiloto dam 2020/2021 Samburu Central Maralal Kshs 5,000,000 Kshs 4,583,333 Complete
CGS/WEN/324 Loonyionyi water extension 2013/2014 Samburu Central Maralal Kshs 2,000,000 Kshs 1,833,333 Complete
CGS/WEN/325 Loonyionyi borehole 2014/2015 Samburu Central Maralal Kshs 4,500,000 Kshs 4,125,000 Stalled
CGS/WEN/326 Loonyionyi 2014/2015 Samburu Central Maralal Kshs 4,500,000 Kshs 4,125,000 Complete
CGS/WEN/327 Logos mawaso water extension 2018/2019 Samburu Central Maralal Kshs 2,000,000 Kshs 1,833,333 Vandalised
CGS/WEN/328 Logos borehole 2016/2017 Samburu Central Maralal Kshs 10,000,000 Kshs 7,896,380 Complete
CGS/WEN/329 Archers post water supply_ water Tank and perimeter wall 2019/2020 Samburu East waso Kshs 7,500,000 Kshs 9,701,390 Complete
CGS/WEN/330 Huruma water kiosk 2021/2022 Samburu East waso Kshs 2,000,000 Kshs 1,750,000 Stalled
CGS/WEN/331 Ndonyo Wasin Water Project 2017/2018 Samburu East waso Kshs 5,000,000 Kshs 4,375,000 Complete
CGS/WEN/332 Nagida village water tank 2019/2020 Samburu East waso Kshs 700,000 Kshs 612,500 Stalled
CGS/WEN/333 Triton Water project 2021/2022 Samburu East waso Kshs 5,000,000 Kshs 4,375,000 Stalled
CGS/WEN/334 Jerusalemu Water Kiosk 2021/2022 Samburu East waso Kshs 1,500,000 Kshs 1,312,500 Complete
CGS/WEN/335 Ldergesi A-Water Kiosk and Tank 2021/2022 Samburu East waso Kshs 1,000,000 Kshs 875,000 Complete
CGS/WEN/336 Ldergesi D. -Water Tower 2021/2022 Samburu East waso Kshs 2,500,000 Kshs 2,187,500 Complete
CGS/WEN/337 Rapunye-Water Kiosk 2021/2022 Samburu East waso Kshs 2,000,000 Kshs 1,750,000 Complete
CGS/WEN/338 Archers Post Nairobi Village Tank II 2020/2021 Samburu East waso Kshs 7,500,000 Kshs 9,701,390 Complete
CGS/WEN/339 Archers Post Nairobi Village -Water Tank 2020/2021 Samburu East waso Kshs 7,500,000 Kshs 9,701,390 Vandalised
CGS/WEN/340 Nakwamor -Borehole 2020/2021 Samburu East waso Kshs 2,500,000 Kshs 2,187,500 Vandalised
CGS/WEN/341 Archers Post-Dump site 2017/2018 Samburu East waso Kshs 3,500,000 Kshs 3,617,310 Complete
CGS/WEN/342 Lokiria-Borehole 2022/2023 Samburu East waso Kshs 5,000,000 Kshs 4,375,000 Complete
CGS/WEN/343 Laresoro- Lechoorion'g Water Pan 2019/2020 Samburu East waso Kshs 3,000,000 Kshs 2,625,000 Complete
CGS/WEN/344 Laresoro-Lechoorion'g Borehole 2023/2024 Samburu East waso Kshs 9,000,000 Kshs 4,626,272 Complete
CGS/WEN/345 Laresoro Water Kiosk II 2020/2021 Samburu East waso Kshs 2,000,000 Kshs 1,750,000 Complete
CGS/WEN/346 Laresoro Water Kiosk 2020/2021 Samburu East waso Kshs 2,000,000 Kshs 1,750,000 Complete
CGS/WEN/347 Nandandapo Water Pan 2019/2020 Samburu East waso Kshs 5,000,000 Kshs 4,375,000 Incomplete
CGS/WEN/348 Laresoro Sand dam 2019/2020 Samburu East waso Kshs 5,000,000 Kshs 4,375,000 Complete
CGS/WEN/349 Lkitembe/Ntilal Water Pan 2018/2019 Samburu East waso Kshs 2,500,000 Kshs 2,187,500 Complete
CGS/WEN/350 Lerate B Sand Dam 2021/2022 Samburu East waso Kshs 3,000,000 Kshs 2,975,000 Vandalised
CGS/WEN/351 Sere Olipi Water Project 2023/2024 Samburu East waso Kshs 5,000,000 Kshs 4,375,000 Stalled
CGS/WEN/352 Lerate B-Dam 2014/2015 Samburu East waso Kshs 5,000,000 Kshs 4,375,000 Complete
CGS/WEN/353 Loipi water pan 2021/2022 Samburu East Wamba East Kshs 2,500,000 Kshs 2,200,000 Complete
CGS/WEN/379 Loijuk borehole 2015/2016 Samburu East Wamba West Kshs 3,000,000 Kshs 2,846,432 Complete
CGS/WEN/380 Loijuk 2 borehole 2016/2017 Samburu East Wamba West Kshs 5,000,000 Kshs 4,630,498 Complete
CGS/WEN/381 Lpusi leluai water extension 2023/2024 Samburu East Wamba West Kshs 1,200,000 Kshs 1,046,882 Incomplete
CGS/WEN/382 Lempaute borehole 2017/2018 Samburu East Wamba West Kshs 5,000,000 Kshs 4,592,852 Complete
CGS/WEN/383 Sukuroi borehole 2016/2017 Samburu East Wamba West Kshs 4,630,498 Kshs 4,414,264 Complete
CGS/WEN/384 Lekupe rock water catchment 2014/2015 Samburu East Wamba West Kshs 2,000,000 Kshs 2,000,000 Complete
CGS/WEN/385 Nkutuk elmuget mega water project 2023/2024 Samburu East Wamba West Kshs 4,150,000 Kshs 3,942,500 Incomplete
CGS/WEN/386 Drilling of Lmooli borehole 2020/2021 Samburu East Wamba West Kshs 3,000,000 Kshs 2,498,576 Complete
CGS/WEN/387 Resim sand dam Funded by NGO Samburu East Wamba West Kshs 0 Kshs 0 Incomplete
CGS/WEN/388 Silango nanyekie borehole 2017/2018 Samburu East Wamba West Kshs 6,000,000 Kshs 4,414,264 Complete
CGS/WEN/389 Nkiseu borehole 2017/2018 Samburu East Wamba West Kshs 6,000,000 Kshs 5,611,816 Vandalised
CGS/WEN/390 Remote borehole 2018/2019 Samburu East Wamba West Kshs 4,000,000 Kshs 3,224,000 Stalled
CGS/WEN/391 Marti epareu borehole 2015/2016 Samburu East Wamba North Kshs 6,000,000 Kshs 5,870,000 Complete
CGS/WEN/392 Nchok sand dam 2019/2020 Samburu East Wamba North Kshs 3,000,000 Kshs 2,788,000 Complete
CGS/WEN/393 Nchok land rehabilitation and restoration site 2021/2022 Samburu East Wamba North Kshs 1,500,000 Kshs 1,337,050 Complete
CGS/WEN/394 Nchok borehole 2 2017/2018 Samburu East Wamba North Kshs 3,500,000 Kshs 2,860,109 Vandalised
CGS/WEN/395 Nchok borehole 2019/2020 Samburu East Wamba North Kshs 3,500,000 Kshs 2,860,109 Complete
CGS/WEN/396 Nolotoro borehole 2020/2021 Samburu East Wamba North Kshs 3,000,000 Kshs 2,498,576 Complete
CGS/WEN/397 Nolotoro water pan 2019/2020 Samburu East Wamba North Kshs 3,000,000 Kshs 2,765,657 Complete
CGS/WEN/398 Lmarmarroi borehole(leparashao) 2019/2020 Samburu East Wamba North Kshs 5,500,000 Kshs 4,961,197 Complete
CGS/WEN/399 Sirata le Murit borehole 2016/2017 Samburu East Wamba North Kshs 5,250,000 Kshs 5,080,113 Complete
CGS/WEN/400 Mantasian borehole 2018/2019 Samburu East Wamba North Kshs 3,000,000 Kshs 2,958,000 Complete
CGS/WEN/401 Ngilai_Ndikir rehabilitation site 2018/2019 Samburu East Wamba North Kshs 3,500,000 Kshs 3,384,283 Complete
CGS/WEN/402 Ndikir nanyekie borehole 1 2021/2022 Samburu East Wamba North Kshs 5,500,000 Kshs 4,282,133 Incomplete
CGS/WEN/403 Ndikir nanyekie borehole 2 2022/2023 Samburu East Wamba North Kshs 5,500,000 Kshs 4,282,133 Vandalised
CGS/WEN/404 Nadooto borehole 2021/2022 Samburu East Wamba North Kshs 2,500,000 Kshs 2,241,210 Complete
CGS/WEN/405 Lorok onyokie water pan 2021/2022 Samburu East Wamba North Kshs 5,500,000 Kshs 4,961,197 Complete
CGS/WEN/406 Swari water extension 2018/2019 Samburu East Wamba North Kshs 2,500,000 Kshs 2,241,210 Complete
CGS/WEN/407 Nairimirimo water extension 2021/2022 Samburu East Wamba North Kshs 5,000,000 Kshs 5,029,020 Complete
CGS/WEN/408 Nairimirimo borehole 2020/2021 Samburu East Wamba North Kshs 3,600,000 Kshs 6,012,000 Complete
CGS/WEN/409 Raraiti borehole 2021/2022 Samburu East Wamba North Kshs 3,000,000 Kshs 2,958,000 Complete
CGS/WEN/410 Mabati borehole 2017/2018 Samburu East Wamba North Kshs 2,500,000 Kshs 2,384,283 Complete
CGS/WEN/411 Mabati rock catchment 2018/2019 Samburu East Wamba North Kshs 1,000,000 Kshs 968,168 Complete
CGS/WEN/412 Lteroi borehole 2021/2022 Samburu East Wamba North Kshs 5,500,000 Kshs 4,961,197 Complete